Planning Permission Ireland
GrantedCommercialDecided 2 August 2016

Ballycurreen, Kinsale Road, Co. Cork

Construction of a fuel dispensing forecourt with two pumps, underground tanks, and associated signage.

164109 · Cork City Council · Lodged 26 January 2016

Reference
164109
Authority
Cork City Council
Register status
Decided
Type
PERMISSION
Received
26 January 2016

Summary

AI-generated

The development consists of installing two 4-hose fuel pumps under a 4.5m high canopy, alongside two 40,000-litre underground storage tanks for petrol and diesel. It also includes associated pipework, concrete surfacing, a petrol interceptor, boundary walls, and a 6-metre-high advertising monolith.

Commercialpetrol stationfuelinfrastructure

Generated from the description above by an AI model and may contain mistakes. The council’s description is the authoritative record.

Official record

Development description

(1) two number 4 hose pumps under a canopy, 4500mm high to the underside, dispensing unleaded petrol and diesel on each side of the pump. (2) two number underground storage tanks, each 40,000lt, one storing diesel and one storing unleaded petrol. (3) all the associated fuel pipework between the pumps and underground tanks, fill points and vents. (4) concrete slab surfacing and associated drainage from the forecourt and adjoining area. The drainage around the forecourt and fill area will be discharged into a 10,000lt class 1 petrol interceptor and from there into the existing drainage system. (5) two 900mm x 900mm x 2400mm high electrical cabinets, one adjacent to each pump. (6) 900mm high perimeter rendered block wall on the eastern boundary and 600mm high on the northern, western and southern boundaries. (7) advertising signage along the edge of the canopy and a stand alone 6000mm high advertising monolith on the northern boundary. (8) site entrance and exit.

Land-use zoning

What this land is zoned for

Mixed Use DevelopmentRE
To provide and promote a mix of residential and other uses to ensure the creation of a vibrant and sustainable urban area.

National zoning type: Mixed Use, general development, opportunity/proposal site

Objective set by the Cork City Development Plan 2022-2028 (2022–2028). The planning authority decides each application on its own merits — this is the zoning context, not a compliance assessment.

Read the zoning objectives in the development plan

Built & sold

What happened next

Beyond the decision: whether this development was built, and what property here has sold for.

Recent sales nearby

within 500 m
Residential Property Price Register sales within 500 metres of this site
AddressDatePriceDistance
100 Alderbrook, Frankfield, CorkAug 2025€270,000143 m
60 Alderbrook, Frankfield, CorkAug 2025€380,000221 m
40 Alderbrook, Frankfield, CorkJul 2025€440,000337 m
3 Hampstead, Ballycurreen, CorkFeb 2025€935,000405 m

Nearby properties, not this site — a guide to local values.

Sources: Building Control Management System (commencement notices) and the Residential Property Price Register, licensed under CC BY 4.0. Records are matched to this application by location and may not be exhaustive; always confirm against the official source before relying on them.

Key dates

Timeline

  1. Application received26 January 2016
  2. Decision due8 August 2016
  3. Decision issued2 August 2016
  4. Appeal submitted29 August 2016
  5. Appeal decided23 February 2017

In the area

Applications near this site

Other planning applications within about 500 m — what else is being proposed or built nearby.

Related developments

Similar applications

Ranked by what these developments actually propose, not by matching words — so you can see how comparable applications were decided.

Community

Discussion

What local people think about this application.

Nobody watching yet

Community sentiment

No votes yet

Nobody has voted on this application yet.

Community sentiment — a straw poll of people who visited this page, not a statutory submission. To make a valid observation you must submit it to the planning authority.

Sign in to have your say on this application.

No comments yet. Be the first to say what you think about this application.

Sign in to join the discussion on this application.

Comments are moderated and are the opinions of the people who wrote them. They form no part of the statutory planning process — to make a valid observation you must submit it to the planning authority.