Planning Permission Ireland
GrantedCommercialDecided 8 February 2018

The former Victoria Hotel site, at 35-36 St. Patrick's St, & 38-39 Cook Stret

Redevelopment of the former Victoria Hotel site for a new retail outlet, including partial demolition and a new top floor.

1737668 · Cork City Council · Lodged 8 December 2017

Reference
1737668
Authority
Cork City Council
Register status
Decided
Type
PERMISSION
Received
8 December 2017

Summary

AI-generated

The development involves retaining and refurbishing the front bays of the building on St. Patrick's Street for retail use. The rear portions facing Cook Street will be demolished and replaced with a new-build structure. A new additional top floor will also be added to the building.

Commercialretailredevelopmentcity centre
Floor area
2,282 m²

Generated from the description above by an AI model and may contain mistakes. The council’s description is the authoritative record.

Official record

Development description

Permission is sought for a development presently retail at ground floor and vacant overhead. It is intended to retain and refurbish the front bays of the building (floor area 465 sq. M) as part of a new high order retail outlet. The rear portions of the building facing cook street containing 1702 sq. M of floorspace will be demolished and replaced with a new build containing 1817 sq. M. A new additional top floor will be provided.

Land-use zoning

What this land is zoned for

City CentreUC
To consolidate and facilitate the development of the central area and to promote its role as a dynamic mixed used centre for community, economic, civic, cultural and residential growth.

National zoning type: City/Town/village Centre, central area

Objective set by the Cork City Development Plan 2022-2028 (2022–2028). The planning authority decides each application on its own merits — this is the zoning context, not a compliance assessment.

Read the zoning objectives in the development plan

Built & sold

What happened next

Beyond the decision: whether this development was built, and what property here has sold for.

Recent sales nearby

within 500 m
Residential Property Price Register sales within 500 metres of this site
AddressDatePriceDistance
24 Opera Lane, Cork, CorkNov 2025€10,00083 m
18 Opera Lane, Cork, Corkprice excludes VATApr 2025€418,50283 m
12 Opera Lane, Cork, CorkApr 2026€475,00083 m
44 Opera Lane, Cork, CorkJan 2026€560,00092 m
58 Opera Lane, Cork, Corkprice excludes VATFeb 2025€281,93892 m
36 Opera Lane, Cork, Corkprice excludes VATFeb 2025€290,74992 m
38 Opera Lane, Cork, CorkJan 2025€510,00092 m
45 Opera Lane, Cork, CorkMay 2025€530,00092 m

Nearby properties, not this site — a guide to local values.

Sources: Building Control Management System (commencement notices) and the Residential Property Price Register, licensed under CC BY 4.0. Records are matched to this application by location and may not be exhaustive; always confirm against the official source before relying on them.

Key dates

Timeline

  1. Application received8 December 2017
  2. Decision due12 February 2018
  3. Decision issued8 February 2018
  4. Grant issued22 May 2019
  5. Appeal submitted6 March 2018
  6. Appeal decided22 May 2019

In the area

Applications near this site

Other planning applications within about 500 m — what else is being proposed or built nearby.

Related developments

Similar applications

Ranked by what these developments actually propose, not by matching words — so you can see how comparable applications were decided.

Community

Discussion

What local people think about this application.

Nobody watching yet

Community sentiment

No votes yet

Nobody has voted on this application yet.

Community sentiment — a straw poll of people who visited this page, not a statutory submission. To make a valid observation you must submit it to the planning authority.

Sign in to have your say on this application.

No comments yet. Be the first to say what you think about this application.

Sign in to join the discussion on this application.

Comments are moderated and are the opinions of the people who wrote them. They form no part of the statutory planning process — to make a valid observation you must submit it to the planning authority.