Planning Permission Ireland
Awaiting decisionCommercialDecision was due 18 May 2017

West Link, Togher Industrial Estate, Ballycurreen Togher

Modifications to a previously approved industrial unit, including a ground floor extension and first floor reduction.

174706 · Cork City Council · Lodged 24 March 2017

Reference
174706
Authority
Cork City Council
Register status
Invalid or incomplete
Type
PERMISSION
Received
24 March 2017

Summary

AI-generated

The development proposes modifications to a previously approved planning application (ref: 15/4491) at Togher Industrial Estate. This includes extending the ground floor footprint by 76.8 sq.m to accommodate larger offices and a staff canteen, removing lean-to roofs, and reducing the first-floor footprint by 56.2 sq.m.

Commercialindustrial estateofficeextension
Floor area
77 m²

Generated from the description above by an AI model and may contain mistakes. The council’s description is the authoritative record.

Official record

Development description

Modifications and additions to previously approved planning application ref: 15/4491 as follows, i) extended ground floor plan area – accommodating larger ‘goods in/goods out’ offices with enclosed link corridor, with footprint further extended to accommodate larger staff canteen area for a total extra ground floor footprint of 76.8sq. M, ii) removal of existing lean to roofs over existing canteen & office areas on the existing south elevation, with a new flat roof and parapet structure to be constructed that will tie in with the new flat roof over extended ‘goods in/goods out’ offices, iii) internal modifications to the first-floor area to include removal of 1 no. Stair access to open plan office area from original application and reduction in first floor footprint by 56.2sq. M, iv) revised elevations reflected updated plan arrangements, v) connections to existing services and all associated site works.

Land-use zoning

What this land is zoned for

Light Industry and Related UsesSI
To provide for light industry and related uses.

National zoning type: Industrial, enterprise, employment

Objective set by the Cork City Development Plan 2022-2028 (2022–2028). The planning authority decides each application on its own merits — this is the zoning context, not a compliance assessment.

Read the zoning objectives in the development plan

Built & sold

What happened next

Beyond the decision: whether this development was built, and what property here has sold for.

Recent sales nearby

within 500 m
Residential Property Price Register sales within 500 metres of this site
AddressDatePriceDistance
16 Farm Green, Manor Farm, LehenaghbegJan 2025€450,000399 m
2 Brook Glen, Manor Farm, LehenaghbegFeb 2026€485,000437 m
2 Farm Green, Manor Farm, LehenabegJun 2025€470,000460 m
No 1 Farm Lane, Manor Farm, LehenaghbegMay 2026€465,000472 m
Ellacombe, Tramore Rd, TogherJun 2026€175,000486 m

Nearby properties, not this site — a guide to local values.

Sources: Building Control Management System (commencement notices) and the Residential Property Price Register, licensed under CC BY 4.0. Records are matched to this application by location and may not be exhaustive; always confirm against the official source before relying on them.

Key dates

Timeline

  1. Application received24 March 2017
  2. Decision due18 May 2017

In the area

Applications near this site

Other planning applications within about 500 m — what else is being proposed or built nearby.

Related developments

Similar applications

Ranked by what these developments actually propose, not by matching words — so you can see how comparable applications were decided.

Community

Discussion

What local people think about this application.

Nobody watching yet

Community sentiment

No votes yet

Nobody has voted on this application yet.

Community sentiment — a straw poll of people who visited this page, not a statutory submission. To make a valid observation you must submit it to the planning authority.

Sign in to have your say on this application.

No comments yet. Be the first to say what you think about this application.

Sign in to join the discussion on this application.

Comments are moderated and are the opinions of the people who wrote them. They form no part of the statutory planning process — to make a valid observation you must submit it to the planning authority.