Planning Permission Ireland
GrantedCommercialDecided 17 October 2018

Mercy University Hospital, Grenville Place, Cork

Installation of a single-storey prefabricated modular cabin at Mercy University Hospital for clinical instrument storage.

1838032 · Cork City Council · Lodged 23 August 2018

Reference
1838032
Authority
Cork City Council
Register status
Decided
Type
PERMISSION
Received
23 August 2018

Summary

AI-generated

Mercy University Hospital is seeking permission to install a single-storey prefabricated modular cabin within its service yard. The cabin will be screened by the existing hospital enclosure and used for the storage and management of clinical instruments. No works are proposed within the curtilage of adjacent protected structures.

Commercialhospitalmodular
Storey
1

Generated from the description above by an AI model and may contain mistakes. The council’s description is the authoritative record.

Official record

Development description

Permission is being sought by mercy university hospital, cork for the installation of a single store prefabricated modular cabin building within the grounds of mercy university hospital. The cabin is proposed to be located in the service yard and will be screened on all sides by the existing hospital enclosure. Please note that while protected structures feature on the adjacent client owned lands, no works are proposed within the curtilage of these structures. The use of the cabin is for storage and management of incoming and outgoing clinical instruments.

Land-use zoning

What this land is zoned for

City CentreUC
To consolidate and facilitate the development of the central area and to promote its role as a dynamic mixed used centre for community, economic, civic, cultural and residential growth.

National zoning type: City/Town/village Centre, central area

Objective set by the Cork City Development Plan 2022-2028 (2022–2028). The planning authority decides each application on its own merits — this is the zoning context, not a compliance assessment.

Read the zoning objectives in the development plan

Built & sold

What happened next

Beyond the decision: whether this development was built, and what property here has sold for.

Recent sales nearby

within 500 m
Residential Property Price Register sales within 500 metres of this site
AddressDatePriceDistance
Apt 5, Aras Na Hollscoile, Sheares StJul 2025€251,00064 m
6 Dyke Parade, CorkAug 2025€765,000128 m
6 Washington Court, Anne St, CorkApr 2026€370,000133 m
4c Grenville Court, Off Milliard St, CorkJul 2025€200,000141 m
4 Woods Street, Cork CityAug 2025€325,000148 m
19 The Moorings, Millerd St, CorkNov 2025€206,500149 m
42 Grattan St, Cork, CorkMay 2026€460,000152 m
14 Washington Court, Anne St, Washington StJan 2025€300,000154 m

Nearby properties, not this site — a guide to local values.

Sources: Building Control Management System (commencement notices) and the Residential Property Price Register, licensed under CC BY 4.0. Records are matched to this application by location and may not be exhaustive; always confirm against the official source before relying on them.

Key dates

Timeline

  1. Application received23 August 2018
  2. Decision due17 October 2018
  3. Decision issued17 October 2018
  4. Grant issued28 November 2018

In the area

Applications near this site

Other planning applications within about 500 m — what else is being proposed or built nearby.

Related developments

Similar applications

Ranked by what these developments actually propose, not by matching words — so you can see how comparable applications were decided.

Community

Discussion

What local people think about this application.

Nobody watching yet

Community sentiment

No votes yet

Nobody has voted on this application yet.

Community sentiment — a straw poll of people who visited this page, not a statutory submission. To make a valid observation you must submit it to the planning authority.

Sign in to have your say on this application.

No comments yet. Be the first to say what you think about this application.

Sign in to join the discussion on this application.

Comments are moderated and are the opinions of the people who wrote them. They form no part of the statutory planning process — to make a valid observation you must submit it to the planning authority.