Planning Permission Ireland
GrantedApartmentsDecided 20 October 2021

18 North Main Street, Cork

Conversion and extension of a protected structure to provide eight residential units and a ground floor commercial unit.

2139972 · Cork City Council · Lodged 4 March 2021

Reference
2139972
Authority
Cork City Council
Register status
Decided
Type
PERMISSION
Received
4 March 2021

Summary

AI-generated

Permission is sought for works to a protected structure on North Main Street, Cork. The project involves altering upper floors to provide seven residential units, altering the ground floor to provide one residential unit and one commercial unit, and constructing a four-storey rear extension.

Apartmentsprotected structureapartmentsextensionretail
Residential units
8
Storeys
4
Floor area
104 m²

Generated from the description above by an AI model and may contain mistakes. The council’s description is the authoritative record.

Official record

Development description

Permission for works to no. 18 north main street, cork (a protected structure, reference no. Ps1045) the works will comprise of (1) the alteration of the existing upper floor pre-63 residential units and vacant accommodation to provide 7 no. Residential units, (2) the alteration of the existing ground floor commercial/retail unit to provide 1 no. Residential unit and 1 no. Commercial/retail unit, (3) a 104 sq. Metres, four storey extension to the rear. The proposal in total comprises 8 no. Residential units and a ground floor commercial/retail unit.

Land-use zoning

What this land is zoned for

City CentreUC
To consolidate and facilitate the development of the central area and to promote its role as a dynamic mixed used centre for community, economic, civic, cultural and residential growth.

National zoning type: City/Town/village Centre, central area

Objective set by the Cork City Development Plan 2022-2028 (2022–2028). The planning authority decides each application on its own merits — this is the zoning context, not a compliance assessment.

Read the zoning objectives in the development plan

Built & sold

What happened next

Beyond the decision: whether this development was built, and what property here has sold for.

Built — construction complete

A commencement notice records works starting on 15 April 2022. A completion certificate was lodged on 28 August 2023.

Notified floor area: 529.8

Recent sales nearby

within 500 m
Residential Property Price Register sales within 500 metres of this site
AddressDatePriceDistance
205 North Gate House, North Main St, CorkMar 2025€274,00082 m
7 or 7/8 Popes Quay, Cork Cityprice excludes VATMay 2026€1,650,000173 m
4 Popes Quay Court, Shandon St, CorkDec 2025€265,000176 m
2 Popes Quay Court, Shandon St, CorkDec 2025€245,000176 m
30 Popes Quay Court, Cork City, Co CorkJul 2025€170,000176 m
Apt 1, 19a Popes Quay, CorkFeb 2025€200,000184 m
6 Coal Quay, CorkFeb 2025€239,291185 m
42 Grattan St, Cork, CorkMay 2026€460,000190 m

Nearby properties, not this site — a guide to local values.

Sources: Building Control Management System (commencement notices) and the Residential Property Price Register, licensed under CC BY 4.0. Records are matched to this application by location and may not be exhaustive; always confirm against the official source before relying on them.

Key dates

Timeline

  1. Application received4 March 2021
  2. Decision due20 October 2021
  3. Decision issued20 October 2021
  4. Grant issued1 December 2021

In the area

Applications near this site

Other planning applications within about 500 m — what else is being proposed or built nearby.

Related developments

Similar applications

Ranked by what these developments actually propose, not by matching words — so you can see how comparable applications were decided.

Community

Discussion

What local people think about this application.

Nobody watching yet

Community sentiment

No votes yet

Nobody has voted on this application yet.

Community sentiment — a straw poll of people who visited this page, not a statutory submission. To make a valid observation you must submit it to the planning authority.

Sign in to have your say on this application.

No comments yet. Be the first to say what you think about this application.

Sign in to join the discussion on this application.

Comments are moderated and are the opinions of the people who wrote them. They form no part of the statutory planning process — to make a valid observation you must submit it to the planning authority.