Planning Permission Ireland
GrantedApartmentsDecided 28 July 2022

Lands between Kennedy Quay, (North) Marina Walk (South), Victoria Road (West) and Mill Road (East)

A major mixed-use development in Cork's South Docklands including 80 apartments and the conversion of the historic Odlum's Building.

2140702 · Cork City Council · Lodged 2 December 2021

Reference
2140702
Authority
Cork City Council
Register status
Decided
Type
PERMISSION
Received
2 December 2021

Summary

AI-generated

This 10-year planning application proposes a mixed-use development comprising 4 new buildings up to 12 storeys high and the conversion of the protected Odlum's Building. The project includes the demolition of existing silos, a double basement, ground floor retail, and 80 apartments.

Apartmentsdocklandsregenerationprotected structuredemolition
Residential units
80
Storeys
12

Generated from the description above by an AI model and may contain mistakes. The council’s description is the authoritative record.

Official record

Development description

For a 10-year planning permission for a proposed mixed-use development comprising 4 no. New buildings and the conversion of the odlum’s building (record of protected structures (rps) ref. Ps856) over a total planning application site area of 1.437 ha bounded by kennedy quay to the north, marina walk to the south, victoria road to the west and mill road to the east, all in the south docklands of cork city. The application area is in two parts consisting of a site adjoining victoria road to the west and a site adjoining mill road to the east. Development proposed in the western part of the planning application area consists of new development to a maximum of 12 no. Storeys: (a) site clearance including the demolition of existing structures consisting of 2 no. Silo buildings (r & h hall) with associated covered conveyors and ancillary single storey buildings, and existing boundary treatments. (b) the construction of 4 no. Buildings ranging in height from 9 to 12 storeys over a double basement: block b of approx. 8,381 sq. M. And 11 no. Storeys to hold ground floor convenience retail and entrance to overhead 80 no. Apartments (30 no. One bed; 40 no. Two bed and 10 no. Three bed). Block c1 of approx. 12,169 sq. M. And 9 no. Storeys to hold ground floor café and office space, upper floors to be used as office space. The office spaces have been designed to be suitable for a single user or multiple users with subdivisions. Block c2 of approx. 10,633 sq. M. And 9 no. Storeys to hold ground floor café and office space, upper floors to be used as office space. The office spaces have been designed to be suitable for a single user or multiple users with subdivisions. Block c3 of approx. 16,212 sq. M. And 12 no. Storeys to hold ground floor whole foods convenience store and entrance to office space. Upper floors to be used as office space, the office spaces have been designed to be suitable for a single user or multiple users with subdivisions. Development proposed in the eastern part of the planning application area consists of reuse of the odlum’s building and new development to a maximum of 9 no. Storeys as follows: (c) conservation works including part demolition, alterations, extension and change of use of the odlum’s building (rps ref. Ps856) to provide for; retail and/or café use, office space, conference facilities, food and beverage space, a cinema including a bar/ dining area, a bar/restaurant and 84 no. Apartments (35 no. One bed; 35 no. Two bed, and 14 no. Three

Land-use zoning

What this land is zoned for

Mixed Use DevelopmentRE
To provide and promote a mix of residential and other uses to ensure the creation of a vibrant and sustainable urban area.

National zoning type: Mixed Use, general development, opportunity/proposal site

Objective set by the Cork City Development Plan 2022-2028 (2022–2028). The planning authority decides each application on its own merits — this is the zoning context, not a compliance assessment.

Read the zoning objectives in the development plan

Built & sold

What happened next

Beyond the decision: whether this development was built, and what property here has sold for.

Recent sales nearby

within 500 m
Residential Property Price Register sales within 500 metres of this site
AddressDatePriceDistance
7 Parkview Terrace, Victoria Rd, CorkJan 2026€601,10091 m
19 Hibernian Buildings, Albert Rd, CorkSept 2025€273,150167 m
4 Kingston Avenue, Victoria Road, CorkJun 2025€566,000189 m
6 Hibernian Buildings, Albert Road, CorkOct 2025€240,000197 m
75 Hibernian Buildings, Albert Road, CorkOct 2025€295,000208 m
9 Elizabeth Terrace, Albert Rd, CorkJan 2026€285,000234 m
13 Marina Terrace, Albert Rd, CorkJul 2025€355,000265 m
Brentville, Victoria Rd, CorkMay 2026€950,000283 m

Nearby properties, not this site — a guide to local values.

Sources: Building Control Management System (commencement notices) and the Residential Property Price Register, licensed under CC BY 4.0. Records are matched to this application by location and may not be exhaustive; always confirm against the official source before relying on them.

Key dates

Timeline

  1. Application received2 December 2021
  2. Decision due28 July 2022
  3. Decision issued28 July 2022
  4. Grant issued30 May 2023
  5. Appeal submitted24 August 2022
  6. Appeal decided29 May 2023

In the area

Applications near this site

Other planning applications within about 500 m — what else is being proposed or built nearby.

Related developments

Similar applications

Ranked by what these developments actually propose, not by matching words — so you can see how comparable applications were decided.

Community

Discussion

What local people think about this application.

Nobody watching yet

Community sentiment

No votes yet

Nobody has voted on this application yet.

Community sentiment — a straw poll of people who visited this page, not a statutory submission. To make a valid observation you must submit it to the planning authority.

Sign in to have your say on this application.

No comments yet. Be the first to say what you think about this application.

Sign in to join the discussion on this application.

Comments are moderated and are the opinions of the people who wrote them. They form no part of the statutory planning process — to make a valid observation you must submit it to the planning authority.