Planning Permission Ireland
GrantedHousing estateDecided 6 September 2022

30 St. Finbarrs Place, Probys Quay, Cork

Refurbishment of an existing house and construction of six new townhouses.

2240823 · Cork City Council · Lodged 25 January 2022

Reference
2240823
Authority
Cork City Council
Register status
Decided
Type
PERMISSION
Received
25 January 2022

Summary

AI-generated

The development includes the refurbishment and extension of an existing dwelling, involving the demolition of two extensions to build a replacement. It also proposes the construction of six new dwellings comprising four 1-bed dormer houses and two 2-bed 1.5-storey townhouses.

Housing estatetownhousesrefurbishmentdemolition
Residential units
7

Generated from the description above by an AI model and may contain mistakes. The council’s description is the authoritative record.

Official record

Development description

Permission for the refurbishment and extension of an existing dwelling and the construction of 6 no. Dwellings at 30 st. Finbarr's place, proby's quay, cork. The refurbishment of the existing dwelling includes the demolition of 2 no. Two-storey extensions and other ancillary structures associated with the existing house and the construction of 1 no. Replacement two-storey extension. The proposed 6 no. Dwellings comprise of 3 no. 1-bed single-storey dormer townhouses, 1 no. 1-bed single-storey dormer detached house and 2 no. 2-bed 1.5 storey townhouses with associated bicycle parking, bin storage, landscaping and all ancillary site development works. Pedestrian access to the proposed development will be via an existing entrance off st. Finbarr's place (also known as bennetts hill).

Land-use zoning

What this land is zoned for

City CentreUC
To consolidate and facilitate the development of the central area and to promote its role as a dynamic mixed used centre for community, economic, civic, cultural and residential growth.

National zoning type: City/Town/village Centre, central area

Objective set by the Cork City Development Plan 2022-2028 (2022–2028). The planning authority decides each application on its own merits — this is the zoning context, not a compliance assessment.

Read the zoning objectives in the development plan

Built & sold

What happened next

Beyond the decision: whether this development was built, and what property here has sold for.

Recent sales nearby

within 500 m
Residential Property Price Register sales within 500 metres of this site
AddressDatePriceDistance
14 Saint Finbarr'S Place, Proby'S Quay, CorkJul 2026€215,00061 m
Davcon Court, 116 Barrack St, CorkDec 2025€1,050,00090 m
6 St Dommick Terrace, Crosses Green, CorkJun 2025€160,00095 m
6 St Dommick Terrace, Crosses Green, CorkJun 2026€308,00095 m
33 Barrack Street, CorkFeb 2025€230,000106 m
5 Rose Cottage, Reeds Lane, Off Barrack StDec 2025€173,000115 m
11 Vicar St, Barrack St, CorkDec 2025€320,000116 m
31 Reeds Sq, Barrack St, CorkOct 2025€287,000123 m

Nearby properties, not this site — a guide to local values.

Sources: Building Control Management System (commencement notices) and the Residential Property Price Register, licensed under CC BY 4.0. Records are matched to this application by location and may not be exhaustive; always confirm against the official source before relying on them.

Key dates

Timeline

  1. Application received25 January 2022
  2. Decision due6 September 2022
  3. Decision issued6 September 2022
  4. Grant issued18 October 2022

In the area

Applications near this site

Other planning applications within about 500 m — what else is being proposed or built nearby.

Related developments

Similar applications

Ranked by what these developments actually propose, not by matching words — so you can see how comparable applications were decided.

Community

Discussion

What local people think about this application.

Nobody watching yet

Community sentiment

No votes yet

Nobody has voted on this application yet.

Community sentiment — a straw poll of people who visited this page, not a statutory submission. To make a valid observation you must submit it to the planning authority.

Sign in to have your say on this application.

No comments yet. Be the first to say what you think about this application.

Sign in to join the discussion on this application.

Comments are moderated and are the opinions of the people who wrote them. They form no part of the statutory planning process — to make a valid observation you must submit it to the planning authority.