Planning Permission Ireland
GrantedEnergyDecided 24 February 2023

Unit 21A Ballycurreen Industrial Estate, Kinsale Road Cork and, Industrial building at Ballycurreen

Installation of a 336.98 kWp rooftop solar panel array across two industrial buildings in Ballycurreen.

2241671 · Cork City Council · Lodged 22 December 2022

Reference
2241671
Authority
Cork City Council
Register status
Decided
Type
PERMISSION
Received
22 December 2022

Summary

AI-generated

Permission is sought for a rooftop solar photovoltaic array consisting of approximately 812 panels on industrial buildings at Ballycurreen Industrial Estate. The installation will partially extend an existing solar array on Unit 21A and partially occupy a vacant roof on an adjacent building.

Energysolarrenewableindustrial
Floor area
1,600 m²

Generated from the description above by an AI model and may contain mistakes. The council’s description is the authoritative record.

Official record

Development description

Permission for the installation of an circa 336.98 kwp rooftop solar photovoltaic array consisting in combination of circa 812 no. Panels (circa 1,599.64m2) partially extending to an existing rooftop solar photovoltaic array (circa 2,513.72m2) located on unit 21a, ballycurreen industrial estate, kinsale road, cork, with the extension situated on the most southern roof area of this industrial building; and partially on a vacant roof area located on an adjacent industrial building located to the north east, at ballycurreen industrial estate, kinsale road, cork, t12r866, with all the proposed panels mounted directly on the roof surface of the buildings and electrically connected to the existing electrical plant rooms via a combined total of 4 no. Inverters mounted on the wall of the existing plant rooms, and all associated site works.

Land-use zoning

What this land is zoned for

Light Industry and Related UsesSI
To provide for light industry and related uses.

National zoning type: Industrial, enterprise, employment

Objective set by the Cork City Development Plan 2022-2028 (2022–2028). The planning authority decides each application on its own merits — this is the zoning context, not a compliance assessment.

Read the zoning objectives in the development plan

Built & sold

What happened next

Beyond the decision: whether this development was built, and what property here has sold for.

Recent sales nearby

within 500 m
Residential Property Price Register sales within 500 metres of this site
AddressDatePriceDistance
22 Curraghconway, Ballycurreen, Co CorkJan 2026€335,000107 m
152 Curragh Woods, Frankfield, CorkApr 2026€417,000224 m
203 Curragh Woods, Frankfield Cross, DouglasMar 2025€400,000235 m
3 Hampstead, Ballycurreen, CorkFeb 2025€935,000237 m
37 Dunvale Crescent, Frankfield, DouglasDec 2025€432,500243 m
189 Curragh Woods, Frankfield, CorkMar 2025€450,000362 m
40 Alderbrook, Frankfield, CorkJul 2025€440,000365 m
60 Alderbrook, Frankfield, CorkAug 2025€380,000435 m

Nearby properties, not this site — a guide to local values.

Sources: Building Control Management System (commencement notices) and the Residential Property Price Register, licensed under CC BY 4.0. Records are matched to this application by location and may not be exhaustive; always confirm against the official source before relying on them.

Key dates

Timeline

  1. Application received22 December 2022
  2. Decision due24 February 2023
  3. Decision issued24 February 2023
  4. Grant issued7 April 2023

In the area

Applications near this site

Other planning applications within about 500 m — what else is being proposed or built nearby.

Related developments

Similar applications

Ranked by what these developments actually propose, not by matching words — so you can see how comparable applications were decided.

Community

Discussion

What local people think about this application.

Nobody watching yet

Community sentiment

No votes yet

Nobody has voted on this application yet.

Community sentiment — a straw poll of people who visited this page, not a statutory submission. To make a valid observation you must submit it to the planning authority.

Sign in to have your say on this application.

No comments yet. Be the first to say what you think about this application.

Sign in to join the discussion on this application.

Comments are moderated and are the opinions of the people who wrote them. They form no part of the statutory planning process — to make a valid observation you must submit it to the planning authority.