Planning Permission Ireland
GrantedExtensionDecided 13 May 2024

Ballincrokig, Dublin Pike, Cork

Demolition of a garage and extension, alterations to elevations, and construction of a new extension and outbuilding.

2342522 · Cork City Council · Lodged 8 December 2023

Reference
2342522
Authority
Cork City Council
Register status
Decided
Type
PERMISSION
Received
8 December 2023

Summary

AI-generated

The project involves the demolition of an existing single-storey detached storage garage and a single-storey extension. It also includes alterations to the existing house elevations, and the construction of a new single-storey extension and a detached outbuilding linked by a timber pergola.

Extensiondemolitionextensionoutbuildingpergola
Storey
1

Generated from the description above by an AI model and may contain mistakes. The council’s description is the authoritative record.

Official record

Development description

Permission for the following: (1) the demolition of an existing single-storey detached storage garage and an existing single-storey extension attached to the existing dwelling; (2) alterations to the existing dwellings elevations; (3) the construction of a single-storey extension and a detached single-storey out-building linked with a timber pergola; and including all associated site works to the existing single-storey detached dwelling.

Land-use zoning

What this land is zoned for

Sustainable Residential NeighbourhoodsRS
To protect and provide for residential uses and amenities, local services and community, institutional, educational and civic uses.

National zoning type: Existing residential

Objective set by the Cork City Development Plan 2022-2028 (2022–2028). The planning authority decides each application on its own merits — this is the zoning context, not a compliance assessment.

Read the zoning objectives in the development plan

Built & sold

What happened next

Beyond the decision: whether this development was built, and what property here has sold for.

Built — construction complete

A commencement notice records works starting on 22 October 2024.

Notified floor area: 110

Recent sales nearby

within 500 m
Residential Property Price Register sales within 500 metres of this site
AddressDatePriceDistance
Ballincrokig, Whites Cross, Co. CorkApr 2026€600,00065 m
57 Coppenger Fields, Whites Cross, Dublin PikeSept 2025€355,000186 m
Kilbarry, Dublin Pike, CorkFeb 2025€399,266188 m
Dunmahon, Ballincroakig, Dublin PikeFeb 2025€365,000211 m
10 Coppenger Fields, Whites Cross, CorkSept 2025€575,000230 m
51 Danesfort, Ballincrokig, Whites Crossprice excludes VATMay 2026€278,414323 m
52 Danesfort, Ballincrokig, Whites Crossprice excludes VATApr 2026€292,511323 m
24 Danesfort, Balincrokig, Whites Crossprice excludes VATJan 2025€284,361325 m

Nearby properties, not this site — a guide to local values.

Sources: Building Control Management System (commencement notices) and the Residential Property Price Register, licensed under CC BY 4.0. Records are matched to this application by location and may not be exhaustive; always confirm against the official source before relying on them.

Key dates

Timeline

  1. Application received8 December 2023
  2. Decision due14 May 2024
  3. Decision issued13 May 2024
  4. Grant issued24 June 2024

In the area

Applications near this site

Other planning applications within about 500 m — what else is being proposed or built nearby.

Related developments

Similar applications

Ranked by what these developments actually propose, not by matching words — so you can see how comparable applications were decided.

Community

Discussion

What local people think about this application.

Nobody watching yet

Community sentiment

No votes yet

Nobody has voted on this application yet.

Community sentiment — a straw poll of people who visited this page, not a statutory submission. To make a valid observation you must submit it to the planning authority.

Sign in to have your say on this application.

No comments yet. Be the first to say what you think about this application.

Sign in to join the discussion on this application.

Comments are moderated and are the opinions of the people who wrote them. They form no part of the statutory planning process — to make a valid observation you must submit it to the planning authority.