Lands to the immediate south of, Ballyvolane Shopping Centre, bordered by Ballyhooly Road (R614) to the east and
Development of an urban farm with a polytunnel, shipping container, and agroforestry south of Ballyvolane Shopping Centre.
2442857 · Cork City Council · Lodged 15 April 2024
- Reference
- 2442857
- Authority
- Cork City Council
- Register status
- Decided
- Type
- PERMISSION
- Received
- 15 April 2024
Summary
AI-generatedPermission is sought to develop a 1.42-hectare urban farm focused on market gardening, agroforestry, and educational activities. The project includes a polytunnel, a repurposed shipping container for facilities, crop growing areas, a small bridge over the Glen River, and wood chip pathways.
- Floor area
- 238 m²
Generated from the description above by an AI model and may contain mistakes. The council’s description is the authoritative record.
Official record
Development description
Permission for development at: lands to the immediate south of ballyvolane shopping centre, bordered by ballyhooly road (r614) to the east and the north ring road (r635) to the south. The development will consist of: the use of lands south of ballyvolane shopping centre's car park (c1.42ha) as an urban farm (agricultural use) focused on market gardening, agroforestry and ancillary educational activities. Lands north of the glen river will be used for market gardening (the cultivation of fruits and vegetables). The market garden will include a polytunnel (210 square metres), a repurposed shipping container (28.2 square metres) that will serve as a canteen/toilet/storage facility, crop growing areas and an outdoor welcome area for educational purposes. To the south of the river an agroforestry system is proposed, comprised of tress with understorey crops of fruit, flowers and vegetables. The trees will be selected to provide crops of fruits. The development will also include: wood chip pathways, a small bridge structure (2.24m wide) across the glen river, landscaping, tree planting, rain harvesting barrels, boundary fencing, a riparian buffer, a set down/collection area within the shopping centre's car park, temporary access from the r614 ballyhooly road during construction works and all other associated site development works/services including a connection to the shopping centre's foul network. Potable water and electricity will also be provided by the shopping centre.
Land-use zoning
What this land is zoned for
“To protect, retain and provide for passive and active recreational uses, open space, green networks, natural areas and amenity facilities.”
National zoning type: Open space, park
Objective set by the Cork City Development Plan 2022-2028 (2022–2028). The planning authority decides each application on its own merits — this is the zoning context, not a compliance assessment.
Read the zoning objectives in the development planBuilt & sold
What happened next
Beyond the decision: whether this development was built, and what property here has sold for.
Recent sales nearby
within 500 m| Address | Date | Price | Distance |
|---|---|---|---|
| 4 Valebrook, Ballyvolane, Cork | Jan 2025 | €325,000 | 183 m |
| 10 Oakpark, Ballyolane, Co Cork | Apr 2025 | €293,500 | 184 m |
| 73 Meadow Park Road, Ballyvolane Road, Cork | Jul 2025 | €347,500 | 205 m |
| 52 Meadow Park Road, Ballyvolane, Cork | Jun 2025 | €290,000 | 223 m |
| 42 Meadow Park Rd, Ballyvolane, Co Cork | Apr 2025 | €256,000 | 238 m |
| 57 Meadow Park Rd, Ballyvolane, Cork | Jan 2025 | €340,000 | 242 m |
| 47 Oakpark, Ballyhooley Rd, Cork | Dec 2025 | €325,000 | 316 m |
| 54 Oakpark, Ballyhooly Rd, Cork | Oct 2025 | €430,000 | 323 m |
Nearby properties, not this site — a guide to local values.
Sources: Building Control Management System (commencement notices) and the Residential Property Price Register, licensed under CC BY 4.0. Records are matched to this application by location and may not be exhaustive; always confirm against the official source before relying on them.
Key dates
Timeline
- Application received15 April 2024
- Decision due10 June 2024
- Decision issued10 June 2024
In the area
Applications near this site
Other planning applications within about 500 m — what else is being proposed or built nearby.
- Granted70 m away
Permission and permission for retention for development at this site. The development will consist of:…
Ballyvolane Shopping Centre , Ballyhooly Road , Ballyvolane
1838040Cork CityLodged 31 Aug 2018Retention
- Granted80 m away
A single storey extension (115.2sq.m) to the existing service station building to accommodate net retail area…
Applegreen Filling Station , North Ring Road , Ballyvolane
1636942Cork CityLodged 24 Jun 2016Commercial
- Granted100 m away
Permission for development at Ballyvolane Shopping Centre, Ballyhooly Road, Cork T23VEY8. The development…
Ballyvolane Shopping Centre , Ballyhooly Road , Cork
2241026Cork CityLodged 19 Apr 2022Energy
- Granted140 m away
Permission for retention... for modifications to planning permission TP15/36588 — Changes to forecourt…
Ballyvolane Service , Station Ballyhooly , Road Ballyvolane
1838126Cork CityLodged 12 Nov 2018Retention
- Granted180 m away
Retention and completion of alterations and extension to existing ground floor bar and first floor restaurant…
Block A, Fox & Hounds Bar, Banduff, Bllyvolane
0710848corkLodged 7 Sept 2007Retention
- Refused180 m away
Demolition of dwellinghouse and the construction of a mixed use development with access from the Rathcooney…
Banduff, Ballyvolane, ,
055487corkLodged 29 Jul 2005Commercial
- Awaiting decision190 m away
Permission for the demolition and removal of an existing dwelling and ancillary structures and the…
Fox and Hounds , Ballyhooly Road and Ballyvolane Road , Banduff
2341917Cork CityLodged 12 Apr 2023Apartments
- Granted200 m away
Partial change of use of existing licenced premises for use as off license, alterations to elevations to…
Fox and Hound Bar,, Ballyhooley Road,, Banduff, Ballyvolane
046996corkLodged 15 Sept 2004Change of use
Related developments
Similar applications
Ranked by what these developments actually propose, not by matching words — so you can see how comparable applications were decided.
- GrantedHousing estate
Permission for development on a site which extends to 2.62 ha. The proposed development will consist of the…
West of the Ballymoneen Road , at the Junction with the Western Distributor Road , Knocknacarra
1730Galway CityLodged 7 Feb 2017
- GrantedCommercial
The site is generally bound as follows: to the north by agricultural greenfield; to the east by agricultural…
Lands To The North Of The Roundabout on the R148/Dublin Road , Johnstown , Enfield Co. Meath
22959MeathLodged 20 Jul 2022
- GrantedHousing estate
"DIRECT APPLICATION TO AN BORD PLEANALA — SUBMISSION TO AN BORD PLEANALA". (i) demolition of existing farm…
Rathmullan Road , Rathmullan , Drogheda Co. Meath
SH305552MeathLodged 3 Oct 2019
- GrantedApartments
Permission for development at this 0.747 ha site. The development will consist of: the demolition of 4 no.…
1 - 4, Rivermount Cottages, Ballyboggan Road, Finglas, Dublin 11
3902/20Dublin CityLodged 10 Dec 2020
- GrantedHousing estate
Permission for retention for the demolition of 4243 sqm of disused glasshouses, and permission for the…
The Former Heneghans Nurseries , Ballybane House and Rosapenna , Monivea Road
16332Galway CityLodged 9 Dec 2016
- GrantedHousing estate
The proposed development consists of demolition of the existing, derelict, former residential structures on…
Townlands of Balally, Woodside, at Blackglen Rd, Slate Cabin Lane, D 18
D25A/0941/WEBDún Laoghaire–RathdownLodged 5 Dec 2025
Community
Discussion
What local people think about this application.
Community sentiment
No votes yetNobody has voted on this application yet.
Community sentiment — a straw poll of people who visited this page, not a statutory submission. To make a valid observation you must submit it to the planning authority.
Sign in to have your say on this application.
No comments yet. Be the first to say what you think about this application.
Sign in to join the discussion on this application.
Comments are moderated and are the opinions of the people who wrote them. They form no part of the statutory planning process — to make a valid observation you must submit it to the planning authority.