Planning Permission Ireland
Awaiting decisionApartments

4 Camden Place, Cork City

Construction of a two-story extension over a garage to create a new apartment at a protected structure in Cork City.

2543623 · Cork City Council · Lodged 7 February 2025

Reference
2543623
Authority
Cork City Council
Register status
In progress
Type
PERMISSION
Received
7 February 2025

Summary

AI-generated

The project involves building a two-story extension over an existing rear garage to create a single-bedroom apartment. It also includes converting the garage to parking, creating a link bridge, and modifying the protected structure.

Apartmentsapartmentprotected structureurban
Residential unit
1
Storeys
2

Generated from the description above by an AI model and may contain mistakes. The council’s description is the authoritative record.

Official record

Development description

Permission is sought for the construction of a two storey extension over an existing single storey rear garage building to include (a)single bedroom apartment at first and second floor levels over existing single storey rear garage building, (b) conversion of garage building to car parking use and courtyard behind, (c) modifications to elevations of the existing single storey garage building, (d) modifications to include the removal and careful storage of first floor existing window to provide new door access and first floor level link bridge to new extension to rear of existing front building and all associated site works at 4 camden place, cork city (protected structure ps015).

Land-use zoning

What this land is zoned for

City CentreUC
To consolidate and facilitate the development of the central area and to promote its role as a dynamic mixed used centre for community, economic, civic, cultural and residential growth.

National zoning type: City/Town/village Centre, central area

Objective set by the Cork City Development Plan 2022-2028 (2022–2028). The planning authority decides each application on its own merits — this is the zoning context, not a compliance assessment.

Read the zoning objectives in the development plan

Built & sold

What happened next

Beyond the decision: whether this development was built, and what property here has sold for.

Recent sales nearby

within 500 m
Residential Property Price Register sales within 500 metres of this site
AddressDatePriceDistance
4 Coburg Street, CorkDec 2025€70,00047 m
31 Camden Wharf, Camden Quay, CorkMay 2026€425,00088 m
57 Camden Wharf, Carroll's Quay, CorkJan 2025€310,00088 m
30 Camden Wharf, Camden Quay, CorkJun 2025€311,00088 m
38 Camden Wharf, Camden Quay, CorkDec 2025€400,00088 m
33 Camden Wharf, Camden Quay, CorkApr 2026€420,00088 m
44 Camden Wharf, Camden Quay, CorkAug 2025€280,00088 m
35 Camden Wharf, Camden Quay, CorkJun 2026€312,50088 m

Nearby properties, not this site — a guide to local values.

Sources: Building Control Management System (commencement notices) and the Residential Property Price Register, licensed under CC BY 4.0. Records are matched to this application by location and may not be exhaustive; always confirm against the official source before relying on them.

Key dates

Timeline

  1. Application received7 February 2025

In the area

Applications near this site

Other planning applications within about 500 m — what else is being proposed or built nearby.

Related developments

Similar applications

Ranked by what these developments actually propose, not by matching words — so you can see how comparable applications were decided.

Community

Discussion

What local people think about this application.

Nobody watching yet

Community sentiment

No votes yet

Nobody has voted on this application yet.

Community sentiment — a straw poll of people who visited this page, not a statutory submission. To make a valid observation you must submit it to the planning authority.

Sign in to have your say on this application.

No comments yet. Be the first to say what you think about this application.

Sign in to join the discussion on this application.

Comments are moderated and are the opinions of the people who wrote them. They form no part of the statutory planning process — to make a valid observation you must submit it to the planning authority.