Planning Permission Ireland
GrantedCommercialDecided 29 May 2025

101, Saint Patricks Street, Cork City

Shopfront signage and internal retail fit-out of a protected structure on St. Patrick's Street, Cork.

2543630 · Cork City Council · Lodged 11 February 2025

Reference
2543630
Authority
Cork City Council
Register status
Decided
Type
PERMISSION
Received
11 February 2025

Summary

AI-generated

The development at this protected structure includes installing external hanging and fascia signage, decorating the shopfront, and carrying out an internal retail fit-out across the ground and first floors. This includes new fitting rooms, balustrades, and merchandising racks.

Commercialshopfrontretailprotected structurefit out

Generated from the description above by an AI model and may contain mistakes. The council’s description is the authoritative record.

Official record

Development description

Permission for the following proposed development: (1) installation of external hanging and fascia signage, decoration of shopfront and installation of painted signage, and (2) internal retail fit-out to ground and first floor levels to include the following: (a) new fitting rooms at first floor level, (b) new balustrades to stairs, (c) installation of standards, fixed to existing walls, to support merchandising racking/shelving, (d) minor alterations and adaptions to existing mechanical and electrical systems in retail areas at 101 saint patrick's street, cork, t12ny3f (this is a protected structure-ps422).

Land-use zoning

What this land is zoned for

City CentreUC
To consolidate and facilitate the development of the central area and to promote its role as a dynamic mixed used centre for community, economic, civic, cultural and residential growth.

National zoning type: City/Town/village Centre, central area

Objective set by the Cork City Development Plan 2022-2028 (2022–2028). The planning authority decides each application on its own merits — this is the zoning context, not a compliance assessment.

Read the zoning objectives in the development plan

Built & sold

What happened next

Beyond the decision: whether this development was built, and what property here has sold for.

Built — construction complete

A commencement notice records works starting on 5 August 2025.

Notified floor area: 762.04

Recent sales nearby

within 500 m
Residential Property Price Register sales within 500 metres of this site
AddressDatePriceDistance
45 Opera Lane, Cork, CorkMay 2025€530,00029 m
38 Opera Lane, Cork, CorkJan 2025€510,00029 m
44 Opera Lane, Cork, CorkJan 2026€560,00029 m
36 Opera Lane, Cork, Corkprice excludes VATFeb 2025€290,74929 m
58 Opera Lane, Cork, Corkprice excludes VATFeb 2025€281,93829 m
24 Opera Lane, Cork, CorkNov 2025€10,00061 m
18 Opera Lane, Cork, Corkprice excludes VATApr 2025€418,50261 m
12 Opera Lane, Cork, CorkApr 2026€475,00061 m

Nearby properties, not this site — a guide to local values.

Sources: Building Control Management System (commencement notices) and the Residential Property Price Register, licensed under CC BY 4.0. Records are matched to this application by location and may not be exhaustive; always confirm against the official source before relying on them.

Key dates

Timeline

  1. Application received11 February 2025
  2. Decision due29 May 2025
  3. Decision issued29 May 2025
  4. Grant issued7 July 2025

In the area

Applications near this site

Other planning applications within about 500 m — what else is being proposed or built nearby.

Related developments

Similar applications

Ranked by what these developments actually propose, not by matching words — so you can see how comparable applications were decided.

Community

Discussion

What local people think about this application.

Nobody watching yet

Community sentiment

No votes yet

Nobody has voted on this application yet.

Community sentiment — a straw poll of people who visited this page, not a statutory submission. To make a valid observation you must submit it to the planning authority.

Sign in to have your say on this application.

No comments yet. Be the first to say what you think about this application.

Sign in to join the discussion on this application.

Comments are moderated and are the opinions of the people who wrote them. They form no part of the statutory planning process — to make a valid observation you must submit it to the planning authority.