Planning Permission Ireland
GrantedExtensionDecided 1 May 2025

Rathmeale, 21 Dundanion Road, Beaumont

Demolition of existing rear and side structures to build a part two-storey, part single-storey extension.

2543708 · Cork City Council · Lodged 10 March 2025

Reference
2543708
Authority
Cork City Council
Register status
Decided
Type
PERMISSION
Received
10 March 2025

Summary

AI-generated

The project involves the demolition of existing single-storey side and rear elements, as well as a front carport. In their place, a part two-storey and part single-storey extension will be built to the side and rear, alongside elevational changes and a widened driveway entrance.

Extensionextensiondemolitionrenovation
Storeys
2

Generated from the description above by an AI model and may contain mistakes. The council’s description is the authoritative record.

Official record

Development description

Permission for alterations and extensions to an existing dwelling including (1) a part 2-storey (pitched roof)/ part single-storey (flat roof) extension to both the side and rear (2) elevational alterations to the existing dwelling including widening pf the front door, new and enlarged first floor side windows and a new rear ground floor opening, (3) demolition of existing side and rear single storey elements and a carport structure to the front of the house, (4) widening of the existing vehicular entrance to 3m and (5) all other associated site works.

Land-use zoning

What this land is zoned for

Sustainable Residential NeighbourhoodsRS
To protect and provide for residential uses and amenities, local services and community, institutional, educational and civic uses.

National zoning type: Existing residential

Objective set by the Cork City Development Plan 2022-2028 (2022–2028). The planning authority decides each application on its own merits — this is the zoning context, not a compliance assessment.

Read the zoning objectives in the development plan

Built & sold

What happened next

Beyond the decision: whether this development was built, and what property here has sold for.

Recent sales nearby

within 500 m
Residential Property Price Register sales within 500 metres of this site
AddressDatePriceDistance
15 Dundanion Rd, Beaumont Dr, BlackrockJan 2025€382,50033 m
Ridgeway, 4 Upper Beaumont Dr, BallintempleMay 2025€542,000129 m
Gentian, The Crescent, Beaumount DrJan 2026€615,000182 m
5 Linden Avenue, Upper Beaumont Drive, BallintempleJun 2025€600,000183 m
37 Temple Vale, Ballintemple, CorkSept 2025€750,000214 m
27 Temple Vale, Ballintemple, CorkApr 2025€805,000256 m
25 Linden Ave, Beaumont, BallintempleJun 2025€432,000286 m
Glendhu, Menloe Gardens, BlackrockSept 2025€1,080,000286 m

Nearby properties, not this site — a guide to local values.

Sources: Building Control Management System (commencement notices) and the Residential Property Price Register, licensed under CC BY 4.0. Records are matched to this application by location and may not be exhaustive; always confirm against the official source before relying on them.

Key dates

Timeline

  1. Application received10 March 2025
  2. Decision due5 May 2025
  3. Decision issued1 May 2025
  4. Grant issued9 June 2025

In the area

Applications near this site

Other planning applications within about 500 m — what else is being proposed or built nearby.

Related developments

Similar applications

Ranked by what these developments actually propose, not by matching words — so you can see how comparable applications were decided.

Community

Discussion

What local people think about this application.

Nobody watching yet

Community sentiment

No votes yet

Nobody has voted on this application yet.

Community sentiment — a straw poll of people who visited this page, not a statutory submission. To make a valid observation you must submit it to the planning authority.

Sign in to have your say on this application.

No comments yet. Be the first to say what you think about this application.

Sign in to join the discussion on this application.

Comments are moderated and are the opinions of the people who wrote them. They form no part of the statutory planning process — to make a valid observation you must submit it to the planning authority.