Planning Permission Ireland
GrantedApartmentsDecided 20 August 2025

A c. 2.61 ha site on lands, adjoining ESB Networks DAC, Office at Farrandahadore More

Construction of 348 residential units, including 332 apartments and 16 townhouses, and a childcare facility in Wilton, Cork.

2543819 · Cork City Council · Lodged 22 April 2025

Reference
2543819
Authority
Cork City Council
Register status
Decided
Type
PERMISSION
Received
22 April 2025

Summary

AI-generated

This Large-Scale Residential Development (LRD) on a 2.61-hectare site will provide 332 apartments across three blocks ranging from 5 to 6 storeys, alongside 16 two-storey townhouses. The scheme includes cost rental, affordable, and social housing units, as well as a 156 sq m childcare facility.

Apartmentslrdapartmentscrechehousing
Residential units
348
Storeys
6
Floor area
30,494 m²

Generated from the description above by an AI model and may contain mistakes. The council’s description is the authoritative record.

Official record

Development description

  • For a 7-year planning permission for a large-scale residential development (lrd) at this site, with a total application site area of c. 2.61 ha, on undeveloped lands adjoining the esb networks dac office, at farrandahadore more, sarsfield road, wilton, cork city. The development will provide 348 no. Residential units, including 296 no. Cost rental apartments, 16 no. 2 no. Storey affordable for sale townhouses and 36 no. Social housing apartments, and a c. 156 sq m childcare facility, with associated staff and servicing areas and all associated development. The site is bounded to the south by the esb wilton offices and depot, to the east by the sarsfield road, to the west by cardinal court and to the north by the st. Joseph's sma wilton parish centre. The development, with a total gross floor area of approximately c. 30,494 sq m, will consist of 16 no. 2 no. Storey, 3-bedroom townhouses and 332 no. Apartment units (152 no. 1-bedroom apartments, 168 no. 2-bedroom apartments, 12 no. 3-bedroom apartments) arranged in 3 no. Apartment blocks. The easternmost block is 6 no. Storeys in height (c. 5,912 sq m). The central block (c. 11,790 sq m) ranges in height from 5-6 no. Storeys, including parking at ground floor podium level, with the c. 156 sq m childcare facility also provided at ground floor level. The westernmost block (c. 10,969 sq m) is proposed to range from 5
  • 6 no. Storeys in height, including parking at ground floor podium level. The proposed development also provides public (c. 3,545 sq m) and communal (c. 1,487 sq m) open space, including provision of podium gardens in the central and western apartment blocks. Provision is made in the landscaping proposals for potential future pedestrian connections that would facilitate permeability through the site to adjoining lands to the western boundary, subject to agreement with those parties and/or cork city council, as appropriate. The proposed vehicular, cycle and pedestrian access into the development is via a reconfigured shared access with the esb facility to the southeast, via a controlled junction on sarsfield road. This reconfiguration includes changes to the existing boundary treatments and gates to the esb site, relocation of security barriers and an existing prefabricated security kiosk (c. 9 sq m) within the esb site. The existing gated vehicular entrance to the site on the eastern boundary to sarsfield road will be reconfigured to provide cycle and pedestrian only access. Pedestrian access is

Land-use zoning

What this land is zoned for

Sustainable Residential NeighbourhoodsRS
To protect and provide for residential uses and amenities, local services and community, institutional, educational and civic uses.

National zoning type: Existing residential

Objective set by the Cork City Development Plan 2022-2028 (2022–2028). The planning authority decides each application on its own merits — this is the zoning context, not a compliance assessment.

Read the zoning objectives in the development plan

Built & sold

What happened next

Beyond the decision: whether this development was built, and what property here has sold for.

Recent sales nearby

within 500 m
Residential Property Price Register sales within 500 metres of this site
AddressDatePriceDistance
54 Cardinal Court, Wilton, CorkDec 2025€370,000181 m
79 Cardinal Court, Wilton, CorkJan 2010€245,000219 m
91 Cardinal Court, Wilton, CorkJun 2026€350,000238 m
57 Wilton Court, Wilton, CorkJul 2025€390,000254 m
86 Wilton Court, Wilton, Corknot full market priceMar 2025€163,000284 m
90 Wilton Court, Cork, CorkMar 2025€305,000291 m
61 Dons Court, Bishopstown, Cork CityMay 2025€475,000293 m
49 Donscourt, Bishopstown, CorkSept 2025€380,000311 m

Nearby properties, not this site — a guide to local values.

Sources: Building Control Management System (commencement notices) and the Residential Property Price Register, licensed under CC BY 4.0. Records are matched to this application by location and may not be exhaustive; always confirm against the official source before relying on them.

Key dates

Timeline

  1. Application received22 April 2025
  2. Decision due20 August 2025
  3. Decision issued20 August 2025
  4. Grant issued29 September 2025

In the area

Applications near this site

Other planning applications within about 500 m — what else is being proposed or built nearby.

Related developments

Similar applications

Ranked by what these developments actually propose, not by matching words — so you can see how comparable applications were decided.

Community

Discussion

What local people think about this application.

Nobody watching yet

Community sentiment

No votes yet

Nobody has voted on this application yet.

Community sentiment — a straw poll of people who visited this page, not a statutory submission. To make a valid observation you must submit it to the planning authority.

Sign in to have your say on this application.

No comments yet. Be the first to say what you think about this application.

Sign in to join the discussion on this application.

Comments are moderated and are the opinions of the people who wrote them. They form no part of the statutory planning process — to make a valid observation you must submit it to the planning authority.