Planning Permission Ireland
RefusedCommercialDecided 23 September 2025

Bandon Road (N71), in the townland of, Ardrostig

Construction of an indoor padel tennis facility with eight courts and rooftop solar panels.

2544065 · Cork City Council · Lodged 31 July 2025

Reference
2544065
Authority
Cork City Council
Register status
Appealed
Type
PERMISSION
Received
31 July 2025

Summary

AI-generated

The proposed development consists of a two-storey equivalent indoor recreation building of approximately 2,758 sq m. It will accommodate 8 padel tennis courts, a reception, merchandise sales, changing rooms, and a rooftop solar panel array.

Commercialsportssolarleisure
Storeys
2
Floor area
2,758 m²

Generated from the description above by an AI model and may contain mistakes. The council’s description is the authoritative record.

Official record

Development description

Permission for development to construct an indoor recreation facility/commercial leisure use building at this site of approximately 1.016 hectares, located at bandon road (n71) in the townland of ardrostig, bishopstown, cork. The proposed development will consist of: the construction of an indoor recreation facility/commercial leisure use building (approximately 2,758 sq m gross floor space and of two storey equivalent height) to accommodate 8 no. Padel tennis courts, reception and seating area, merchandise display and sales area, welfare facility units (incl. Toilets and shower/change rooms), circulation area and storeroom; external construction works include 3 no. Building mounted signs (20.28 sq m), rooftop photovoltaic solar panel array (419.20 sq m), vehicle circulation and surface car parking spaces (2 no. Disabled, 1 no. Ev charging, 7 no. Ev parking, and 25 no. Regular), 20 no. Bicycle spaces, and 4 no. Motorcycle parking spaces; and site services (incl. Online surface water attenuation tank and connection to existing foul sewer served by existing on-site temporary wastewater treatment system) and all other ancillary infrastructure and associated site development works above and below ground level. Primary vehicular and pedestrian access will be taken via the existing internal access road from bandon road (n71). Enhanced future permeability connectivity is facilitated by a combined cycle and pedestrian foothpath link to lands to the west of the site and the provision of a surfaced footpath on the western side of the existing internal access road.

Land-use zoning

What this land is zoned for

Light Industry and Related UsesSI
To provide for light industry and related uses.

National zoning type: Industrial, enterprise, employment

Objective set by the Cork City Development Plan 2022-2028 (2022–2028). The planning authority decides each application on its own merits — this is the zoning context, not a compliance assessment.

Read the zoning objectives in the development plan

Built & sold

What happened next

Beyond the decision: whether this development was built, and what property here has sold for.

Recent sales nearby

within 500 m
Residential Property Price Register sales within 500 metres of this site
AddressDatePriceDistance
Cleaveragh, 2 Waterfall Road, CorkJul 2025€400,000292 m
122 Waterfall Heights, Waterfall Road, Bishopstownprice excludes VATFeb 2025€421,476301 m
82 Waterfall Heights, Waterfall, Corkprice excludes VATJul 2025€443,502301 m
Valhalla, Ardrostig, WaterfallJul 2025€608,000313 m
76 Waterfall Rd, Bishopstown, CorkMar 2025€560,000322 m
75 Waterfall Rd, Cork, CorkOct 2025€585,000324 m
Tigh Deire, Bishopstown Rd, BishopstownJun 2025€475,000353 m
8 Units At Block 4, Waterfall Heights, Ardrostigprice excludes VATDec 2025€3,231,424373 m

Nearby properties, not this site — a guide to local values.

Sources: Building Control Management System (commencement notices) and the Residential Property Price Register, licensed under CC BY 4.0. Records are matched to this application by location and may not be exhaustive; always confirm against the official source before relying on them.

Key dates

Timeline

  1. Application received31 July 2025
  2. Decision due24 September 2025
  3. Decision issued23 September 2025
  4. Appeal submitted17 October 2025

In the area

Applications near this site

Other planning applications within about 500 m — what else is being proposed or built nearby.

Related developments

Similar applications

Ranked by what these developments actually propose, not by matching words — so you can see how comparable applications were decided.

Community

Discussion

What local people think about this application.

Nobody watching yet

Community sentiment

No votes yet

Nobody has voted on this application yet.

Community sentiment — a straw poll of people who visited this page, not a statutory submission. To make a valid observation you must submit it to the planning authority.

Sign in to have your say on this application.

No comments yet. Be the first to say what you think about this application.

Sign in to join the discussion on this application.

Comments are moderated and are the opinions of the people who wrote them. They form no part of the statutory planning process — to make a valid observation you must submit it to the planning authority.