Planning Permission Ireland
Awaiting decisionChange of useDecision was due 19 November 2025

53 Gerald Griffin Street, Blackpool, Cork

Conversion of a vacant shop to a cafe and construction of a third storey for two studio apartments in Blackpool.

2544194 · Cork City Council · Lodged 25 September 2025

Reference
2544194
Authority
Cork City Council
Register status
In progress
Type
PERMISSION
Received
25 September 2025

Summary

AI-generated

The proposal seeks to change the use of a vacant ground floor commercial unit into a cafe. It also includes constructing a new third storey to accommodate two studio apartments on the upper floors, with a new pedestrian entrance.

Change of usecafeapartmentschange of useurban
Residential units
2
Storeys
3

Generated from the description above by an AI model and may contain mistakes. The council’s description is the authoritative record.

Official record

Development description

Permission for development at 53 gerald griffin street, blackpool, cork, t23v623. The proposed development will consist of (1) the change of use of a vacant ground floor commercial unit to a cafe use; (2) alterations to existing building, including demolition works and elevational changes and the construction of a new third-storey, all to accommodate 2 no. Studio apartments at first and second floor levels; (3) an awning over ground floor entrance on the southern elevation; (4) partial demolition of external wall and creation of new pedestrian entrance from saint mary's road to new yard accessing the upper floors; and (5) all ancillary site development works including bin storage and bicycle parking spaces and drainage and utility connection works.

Land-use zoning

What this land is zoned for

Sustainable Residential NeighbourhoodsRS
To protect and provide for residential uses and amenities, local services and community, institutional, educational and civic uses.

National zoning type: Existing residential

Objective set by the Cork City Development Plan 2022-2028 (2022–2028). The planning authority decides each application on its own merits — this is the zoning context, not a compliance assessment.

Read the zoning objectives in the development plan

Built & sold

What happened next

Beyond the decision: whether this development was built, and what property here has sold for.

Recent sales nearby

within 500 m
Residential Property Price Register sales within 500 metres of this site
AddressDatePriceDistance
61 Gerald Griffin St, CorkDec 2025€350,00043 m
5 Cathedral St, CorkApr 2026€335,00049 m
4 Cathedral St, CorkApr 2026€335,00053 m
3 Cathedral St, CorkApr 2026€103,33356 m
7 St Patricks Sq, Gerald Griffin St, CorkMar 2026€220,00079 m
2 Cathedral Ave, Cork, CorkDec 2025€360,00086 m
Apt 1, 68 Gerald Griffin St, CorkMay 2025€570,00088 m
6 Convent Place, Off St Mary's Road, CorkDec 2025€230,00092 m

Nearby properties, not this site — a guide to local values.

Sources: Building Control Management System (commencement notices) and the Residential Property Price Register, licensed under CC BY 4.0. Records are matched to this application by location and may not be exhaustive; always confirm against the official source before relying on them.

Key dates

Timeline

  1. Application received25 September 2025
  2. Decision due19 November 2025

In the area

Applications near this site

Other planning applications within about 500 m — what else is being proposed or built nearby.

Related developments

Similar applications

Ranked by what these developments actually propose, not by matching words — so you can see how comparable applications were decided.

Community

Discussion

What local people think about this application.

Nobody watching yet

Community sentiment

No votes yet

Nobody has voted on this application yet.

Community sentiment — a straw poll of people who visited this page, not a statutory submission. To make a valid observation you must submit it to the planning authority.

Sign in to have your say on this application.

No comments yet. Be the first to say what you think about this application.

Sign in to join the discussion on this application.

Comments are moderated and are the opinions of the people who wrote them. They form no part of the statutory planning process — to make a valid observation you must submit it to the planning authority.