Planning Permission Ireland
Awaiting decisionCommercialDecision was due 9 December 2025

Unit 1 & Unit 2 Site located at, former Ballincollig DIY & Garden Centre, Ballincollig Commercial Park

Retention and expansion of a food processing and warehouse facility in Ballincollig.

2544239 · Cork City Council · Lodged 15 October 2025

Reference
2544239
Authority
Cork City Council
Register status
In progress
Type
RETENTION
Received
15 October 2025

Summary

AI-generated

This application seeks permission for retention and new works at an existing commercial site. It includes the retention of warehouse and food processing uses, the construction of a single-storey extension to the rear of Unit 2, internal alterations, demolition of staff accommodation, and a new single-storey extension to Unit 1 to provide additional warehouse storage.

Commercialwarehousefood processingextension
Floor area
399 m²

Generated from the description above by an AI model and may contain mistakes. The council’s description is the authoritative record.

Official record

Development description

  • Permission for proposed works and permission for retention at existing unit 1 (currently used as warehouse building / food goods processing and packaging facility) and unit 2 (warehouse building with ancillary office accommodation) at site located at former ballincollig diy and garden centre, ballincollig commercial park, leo murphy / link road, ballincollig, cork. Proposed works to unit 2 include
  • To construct new single – storey lean – to extension to rear of unit 2 to accommodate plant storage room
  • To provide new fire escape door on rear elevation of unit 2 and
  • All associated development works. Proposed works to unit 1 include
  • Alterations to internal layout of existing warehouse storage area and proposed change of use from permitted warehouse use ( total floor area = 283.40sq. M) to use as extension to existing food goods processing and packaging facility to provide new production area, new boiler room and new electrical room
  • Demolition of existing ancillary and staff accommodation (84.15sq,m) within unit 1
  • To construct new single – storey extension to north – facing elevation of unit 1 to provide additional warehouse storage area (399.47sq. M), new loading bay (50sq. M) with access ramp and canopy over off – loading area
  • To construct new lean – to covered waste / recycling storage area with access ramp and raised platform to north – facing elevation of unit 1
  • To construct new part single – storey / part 2-storey extension to south and west – facing elevations of unit 1 to provide additional warehouse storage area (523.94sq. M) and new ancillary office and staff accommodation (220.72sq. M)
  • New signage to be erected on west and south -facing building elevations of unit 1 and at site entrance
  • Installation of rooftop pv panels on unit 1, and
  • Minor alterations to existing unit 1 building elevations. Proposed site works include
  • To demolish existing onsite single – storey security hut (20.89sq. M)
  • To replace existing metal fencing along south – facing site boundary with new 2m high plastered and capped wall
  • To relocate existing vehicular access gate towards west – facing site boundary to improve ingress and egress from site
  • To provide new pedestrian access gate with access ramp to serve development
  • New car parking layout including provision of 1no. E-car space and covered bicycle storage, and
  • All associated site development works including site lighting, landscaping, drainage and finishes. Perm

Land-use zoning

What this land is zoned for

Light Industry and Related UsesSI
To provide for light industry and related uses.

National zoning type: Industrial, enterprise, employment

Objective set by the Cork City Development Plan 2022-2028 (2022–2028). The planning authority decides each application on its own merits — this is the zoning context, not a compliance assessment.

Read the zoning objectives in the development plan

Built & sold

What happened next

Beyond the decision: whether this development was built, and what property here has sold for.

Recent sales nearby

within 500 m
Residential Property Price Register sales within 500 metres of this site
AddressDatePriceDistance
5 Carrigdene, Ballincollig, Corknot full market priceMar 2025€190,000174 m
97 Castlepark, Ballincollig, CorkJun 2025€270,000219 m
3 Peter Odonovan Crescent, Ballincollig, CorkFeb 2025€290,000268 m
6 O Donovan Crescent, Ballincollig, CorkJun 2025€330,000282 m
28 Leesdale Court, Ballincollig, CorkDec 2025€355,000315 m
75 Beech Park, Ballincollig, CorkAug 2025€400,000321 m
16 Peter Odonovan Crescent, Ballincollig, CorkNov 2025€240,000337 m
22 Leesdale Ct, Ballincollig, CorkDec 2025€455,000344 m

Nearby properties, not this site — a guide to local values.

Sources: Building Control Management System (commencement notices) and the Residential Property Price Register, licensed under CC BY 4.0. Records are matched to this application by location and may not be exhaustive; always confirm against the official source before relying on them.

Key dates

Timeline

  1. Application received15 October 2025
  2. Decision due9 December 2025

In the area

Applications near this site

Other planning applications within about 500 m — what else is being proposed or built nearby.

Related developments

Similar applications

Ranked by what these developments actually propose, not by matching words — so you can see how comparable applications were decided.

Community

Discussion

What local people think about this application.

Nobody watching yet

Community sentiment

No votes yet

Nobody has voted on this application yet.

Community sentiment — a straw poll of people who visited this page, not a statutory submission. To make a valid observation you must submit it to the planning authority.

Sign in to have your say on this application.

No comments yet. Be the first to say what you think about this application.

Sign in to join the discussion on this application.

Comments are moderated and are the opinions of the people who wrote them. They form no part of the statutory planning process — to make a valid observation you must submit it to the planning authority.