CARROWMORE, QUIGLEY'S POINT, INISHOWEN
A 10-year permission for a wind energy project consisting of 6 wind turbines up to 124.9m high.
1851230 · Donegal County Council · Lodged 10 August 2018
- Reference
- 1851230
- Authority
- Donegal County Council
- Register status
- Decided
- Type
- PERMISSION
- Received
- 10 August 2018
Summary
AI-generatedPermission is sought for a wind energy and grid connection project with a 30-year operational life. The development will consist of 6 three-bladed wind turbines up to 124.9 metres high, an 80-metre meteorological mast, an electrical substation, and associated infrastructure.
- Storey
- 1
Generated from the description above by an AI model and may contain mistakes. The council’s description is the authoritative record.
Official record
Development description
10 year duration for a proposed wind energy and grid connection project with a 30-year operational life from the date of commissioning. The proposed wind energy site will be located within the townland of carrowmore or glentogher, quigley's point, inishowen, co donegal. The proposed wind energy site will consist of 6 no. Three bladed wind turbines with a maximum base to blade tip height of up to 124.9 metres and will include turbine transformers; turbine bases and foundations, turbine hardstands and temporary set-down areas; 1 no. Permanent lattice anemometer "met" mast of 80 metres height with foundations and hardstanding area; widening and strengthening of existing access tracks and construction of new floated and excavated access tracks, junctions and turning areas; 1 no. Electrical 38kv substation with control building, car parking and compound area with related communications and electrical equipment/plant with undergrounded electrical feeder cables and communications lines connecting wind turbines to the switch room control building; 2 no. Spoil deposition areas; dedicated habitate management area; on-site drainage management works; upgrade of 3 no. Existing site entrances; 2 no. Temporary construction compounds; 2 no. Temporary borrow pits and with all other ancillary and associated development and infrastructure including general and exacavation works. The proposed undergrounded grid connection route will facilitate connection to the national grid and will consist of the laying of a 38kv underground electrical cable including all associated infrastructure, up-grading of existing tracks, construction of new access tracks, drainage, excavations, joint bays, junction boxes/chambers, marker posts/plates and all related accommodation works, extending circa. 17,620 metres in length, from the wind energy site control building/electrical compound to the existing esb owned 110kv trillick substation, in ballynahone townland, buncrana. The grid route will pass along existing public roads and private access tracks within the townlands of carrowmore or glentogher, illies, connaghkinnagoe, ballynakeeloge, foffenagh, meenamullagan, stranaclea, meenkeeragh, sorne, owenakillew and barnahone, tullydush upper, annaslee and ballynahone all inishowen, co. Donegal. The planning application is accompanied by an environmental impact assessment report (eiar) and by a natura impact statement (nis).
Key dates
Timeline
- Application received10 August 2018
- Decision due13 October 2019
- Decision issued11 October 2019
- Appeal submitted6 November 2019
- Appeal decided20 April 2021
- Permission expiry19 April 2026
In the area
Applications near this site
Other planning applications within about 500 m — what else is being proposed or built nearby.
Related developments
Similar applications
Ranked by what these developments actually propose, not by matching words — so you can see how comparable applications were decided.
- Awaiting decisionEnergy
(1) ERECTION OF THREE 4.5 MEGAWATTS (MW) WIND TURBINES WITH A BLADE TIP HEIGHT OF 150M CONSISTING OF A ROTOR…
MULMOSOG MEENTULLYNAGARN MEENAKILLEW , ALTNAGAPPLE CROCKNAGAPPLE & CORKER MORE KILLYBEGS , CO. DONEGAL
2660905DonegalLodged 20 May 2026
- RefusedEnergy
A 10-YEAR PLANNING PERMISSION WITH A 30-YEAR OPERATIONAL LIFE FOR DEVELOPMENT ON A SITE AREA OF 60.674…
BALLYKILLEEN SHEAN KILCUMBER CLONCANT & CUSHALING , EDENDERRY , CO OFFALY
19606OffalyLodged 19 Dec 2019
- RefusedInfrastructure
A 10 YEAR PLANNING PERMISSION FOR DEVELOPMENT CONSISTING OF (1) A 110KV ELECTRICITY SUBSTATION WHICH INCLUDES…
CARK , CO. DONEGAL
1750543DonegalLodged 12 Apr 2017
- Awaiting decision
A PERIOD OF 10 YEARS FOR PROPOSED WORKS TO FACILITATE THE DELIVERY OF TURBINE COMPONENTS TO THE PERMITTED…
KILLYBEGS GLEBE AGHAYEEVOGE CASHELREAGH GLEBE BRUCKLESS AIGHAN BRUCKLESS & DARNEY , DONEGAL PO , CO. DONEGAL
2661265DonegalLodged 8 Jul 2026
- Awaiting decisionEnergy
10 YEAR PERMISSION FOR AN AMENDED WIND FARM DEVELOPMENT, WITH AN OPERATIONAL LIFE OF 30 YEARS FROM THE DATE…
VARIOUS LOCATIONS , GLENTIES , CO DONEGAL
2151202DonegalLodged 16 Jun 2021
- RefusedEnergy
A 10 YEAR PERMISSION FOR AN AMENDED WIND FARM DEVELOPMENT, WITH AN OPERATIONAL LIFE OF 30 YEARS FROM THE DATE…
GRAFFY MEENAMANRAGH DALRAGHAN MORE GLENTIES MEENAGRUBBY TIEVEBRACK BANGANBOY STRACASHEL DRUMCONCOOSE , DRUMNALOUGH LUGAVEEN GLENTIES , CO DONEGAL
2151990DonegalLodged 7 Oct 2021
Community
Discussion
What local people think about this application.
Community sentiment
No votes yetNobody has voted on this application yet.
Community sentiment — a straw poll of people who visited this page, not a statutory submission. To make a valid observation you must submit it to the planning authority.
Sign in to have your say on this application.
No comments yet. Be the first to say what you think about this application.
Sign in to join the discussion on this application.