GOLDRUM, TERMON, LETTERKENNY PO
Retention of layout changes, building footprint reductions, and tank modifications at a water treatment plant in Termon.
1950835 · Donegal County Council · Lodged 6 June 2019
- Reference
- 1950835
- Authority
- Donegal County Council
- Register status
- Withdrawn
- Type
- RETENTION
- Received
- 6 June 2019
- Residential units
- 1
- Floor area
- 1670.5 m²
Summary
AI-generatedThis application seeks retention permission for site layout changes at a water treatment facility, including a reduced footprint for the water treatment and sludge buildings. It also covers modifications to the raw and clear water tanks, repositioning of sludge treatment facilities, and associated ground level changes.
Generated from the description above by an AI model and may contain mistakes. The council’s description is the authoritative record.
Official record
Development description
(1) site layout changes including reduction in road and hardstanding areas, repositioning of the on-site waste water treatment unit, repositioning of generator housing and omission of external oil tank and fence enclosure and revised parking layout (2) reduction in the footprint of the water treatment plant building and revised internal and external changes to this building (3) reduction in the footprint of the sludge building by and revised internal and external changes to this building (4) modifications to the raw water balancing tank structure, including reducing its height (5) modifications to the clear water tank, including reducing the tank height and raising the level of the tank with a resultant mean increase in finished ground level of 1:48m (6) repositioning of, and alterations to, the sludge treatment facilities including; increasing the number of tanks from 6 to 8, replacing the single wash water recovery tank with two circular wash water recovery tanks and installation of an additional underground storage tank (process water sump) (38.5 m2) (7) all associated site works and permission for modifications to the landscaping, ground levels and associated site works to allow completion of the development.
Key dates
Timeline
- Application received6 June 2019
- Application withdrawn18 July 2019
In the area
Applications near this site
Other planning applications within about 500 m — what else is being proposed or built nearby.
Related developments
Similar applications
Ranked by what these developments actually propose, not by matching words — so you can see how comparable applications were decided.
- GrantedRetention
MODIFICATIONS TO THE WATER TREATMENT PLANT DEVELOPMENT PERMITTED UNDER PLANNING PERMISSION REFERENCE 15/51355…
GOLDRUM , TERMON , LETTERKENNY
1951216DonegalLodged 8 Aug 2019
- Awaiting decisionInfrastructure
REPLACE 4 EXISTING RAW WATER INTAKE PUMPS WITH NEW MORE EFFICIENT PUMPS WITHIN EXISTING INTAKE & PUMPING…
SHANVALLYARD , TOURMAKEADY
16991MayoLodged 19 Dec 2016
- GrantedRetention
For — Alterations to the Waste Processing Building, including: 1.1) Repositioning of the southernmost loading…
Lismagratty and Corranure , Cootehill Road Cavan , Co. Cavan
2460647CavanLodged 20 Dec 2024
- GrantedIndustrial
THE PROPOSED DEVELOPMENT AND WORKS CONSISTING OF AMENDMENTS TO DEVELOPMENT PERMITTED UNDER OFFALY COUNTY…
ARDEN ROAD , TULLAMORE , CO. OFFALY
2472OffalyLodged 14 Jun 2024
- GrantedInfrastructure
The development will consist of: 1.Upgrades to the existing site access roads, security (fencing upgrades)…
Liscarton Water Treatment Plant , Liscarton Navan , Co. Meath
NA171138MeathLodged 29 Sept 2017
- GrantedRetention
(1) MINOR REPOSITIONING OF ACCESS LANEWAY AND HOUSES NUMBER 1, 2, 3 AND 4 ORIGINALLY GRANTED PLANNING…
TONDUFF , BUNCRANA , LIFFORD PO CO DONEGAL
2350850DonegalLodged 15 Jun 2023
Community
Discussion
What local people think about this application.
Community sentiment
No votes yetNobody has voted on this application yet.
Community sentiment — a straw poll of people who visited this page, not a statutory submission. To make a valid observation you must submit it to the planning authority.
Sign in to have your say on this application.
No comments yet. Be the first to say what you think about this application.
Sign in to join the discussion on this application.
Comments are moderated and are the opinions of the people who wrote them. They form no part of the statutory planning process — to make a valid observation you must submit it to the planning authority.