Planning Permission Ireland
Awaiting decisionExtension

AGHAVEAGH, BALLYBOFEY, LIFFORD PO

Extensions, roof raising, and alterations to two gate lodges in Ballybofey.

2250935 · Donegal County Council · Lodged 30 May 2022

Reference
2250935
Authority
Donegal County Council
Register status
Withdrawn
Type
PERMISSION
Received
30 May 2022

Summary

AI-generated

Permission is sought to raise the roof level and add a first floor to Gate Lodge 1, with a new sewage system. Works to Gate Lodge 2 include a side extension, raising the roof for a first floor, a new sewage system, and constructing entrance pillars, gates, a boundary wall, and a public footpath.

Extensionextensionrenovationgate lodge
Storeys
2

Generated from the description above by an AI model and may contain mistakes. The council’s description is the authoritative record.

Official record

Development description

(1) raising the roof level and construction of a first floor layout to existing gate lodge 1, together with elevational changes with associated sewage treatment system (2) construction of (a) an extension to the side of gate lodge 2 as well as raising roof level for construction of a first-floor layout together with elevational changes with associated sewage treatment system (b) entrance pillars with gates and boundary wall with a public footpath and street lighting linking gate lodges (3) all associated site development works

Built & sold

What happened next

Beyond the decision: whether this development was built, and what property here has sold for.

Recent sales nearby

within 500 m
Residential Property Price Register sales within 500 metres of this site
AddressDatePriceDistance
The Rectory, Glenmore, BallybofeyNov 2025€350,000350 m
Glenmore Cottage, Glenmore, BallybofeyNov 2025€65,000354 m

Nearby properties, not this site — a guide to local values.

Sources: Building Control Management System (commencement notices) and the Residential Property Price Register, licensed under CC BY 4.0. Records are matched to this application by location and may not be exhaustive; always confirm against the official source before relying on them.

Key dates

Timeline

  1. Application received30 May 2022
  2. Further information requested21 July 2022
  3. Application withdrawn21 March 2023

In the area

Applications near this site

Other planning applications within about 500 m — what else is being proposed or built nearby.

Related developments

Similar applications

Ranked by what these developments actually propose, not by matching words — so you can see how comparable applications were decided.

Community

Discussion

What local people think about this application.

Nobody watching yet

Community sentiment

No votes yet

Nobody has voted on this application yet.

Community sentiment — a straw poll of people who visited this page, not a statutory submission. To make a valid observation you must submit it to the planning authority.

Sign in to have your say on this application.

No comments yet. Be the first to say what you think about this application.

Sign in to join the discussion on this application.

Comments are moderated and are the opinions of the people who wrote them. They form no part of the statutory planning process — to make a valid observation you must submit it to the planning authority.