BALLYNAHONE, BUNCRANA, LIFFORD PO
A 10-year permission is sought for a large battery energy storage compound and transformer compound in Buncrana.
2461497 · Donegal County Council · Lodged 23 September 2024
- Reference
- 2461497
- Authority
- Donegal County Council
- Register status
- Appealed
- Type
- PERMISSION
- Received
- 23 September 2024
Summary
AI-generatedThe development of a long duration energy storage compound will span approximately 2.9 hectares. It will contain 248 battery energy storage units in metal shipping containers, an onsite transformer compound, and underground cabling connecting to the adjacent Trillick 110kV substation.
- Floor area
- 27 m²
Generated from the description above by an AI model and may contain mistakes. The council’s description is the authoritative record.
Official record
Development description
(1) a 10-year permission for the development of a long duration energy storage (ldes) compound with a total surface area of c. 2.9ha containing 248no. Battery energy storage units in the form of metal shipping containers [approximately 12.2m (l) x 2.6m (w) and 2.9m (h) each] and associated ancillary control and ventilation equipment; (2) installation of an onsite transformer compound (c. 3,600sq m) to facilitate an under-the fence connection to the adjacent trillick 110kv substation. The transformer compound will include a control building of c. 27sq m, a 110 kv transformer, associated electrical equipment, and an up to 18m high lightning protection monopole mast; (3) a temporary construction compound with a total surface area of c. 1,500sq m. C. 515m of new and upgraded access tracks; 3no. Entrances from the l-7231 public road comprising the upgrade of 1no. Existing entrance and creation of 1no. New permanent access and 1no. New temporary access for the construction and operation of the facility; (4) underground electrical and communications cabling between the proposed ldes compound and the proposed on-site transformer compound which will cross under the l-7231 public road; (5) security lighting; (6) pole mounted cctv and communications mast; (7) on-site freshwater storage tank including fresh water treatment unit in the form of a metal shipping container; (8) on-site drainage system and associated vegetated attenuation pond; (9) a storage container in the form of a metal shipping container; (10) sound reflective barriers to a height of 4m; (11) security fencing and gates; and all associated ancillary site development, services and clearance works including tree felling of c. 4.7ha of conifer plantation; landscaping and planting. The proposed ldes facility will be operational for a period of 30 years
Key dates
Timeline
- Application received23 September 2024
- Decision due17 November 2024
- Decision issued15 November 2024
- Appeal submitted4 December 2024
In the area
Applications near this site
Other planning applications within about 500 m — what else is being proposed or built nearby.
Related developments
Similar applications
Ranked by what these developments actually propose, not by matching words — so you can see how comparable applications were decided.
- RefusedEnergy
For; (1) a Long Duration Energy Storage (LDES) facility contained within a secure outdoor compound (area of…
Coolpowra Cooldorragha Gortlusky Ballynaheskeragh & Sheeaunrush , Co. Galway , H53 Y997
2460845galwayLodged 8 Jul 2024
- Awaiting decisionEnergy
Permission for — 1no. enclosed battery energy storage system compound on a total of c. 2-hectare site, to…
Ballynanelagh Knockraha Co. Cork
25/4155corkLodged 7 Feb 2025
- GrantedEnergy
DEVELOPMENT OF AN ENERGY STORAGE SYSTEM (ESS) FACILITY DESIGNED TO PROVIDE SYSTEM SUPPORT SERVICES TO THE…
CLONIFFEEN , SHANNONBRIDGE , CO. OFFALY
21295OffalyLodged 11 May 2021
- GrantedEnergy
Will consist of a battery energy storage system (BESS) located within a fenced compound and will (subject to…
a c. 4.63 ha site within the former Lough Ree Power (LRP) Station , in the townlands of Aghamore and Lanesborough , Lanesborough (Lanesboro) Co. Longford
2460315LongfordLodged 19 Dec 2024
- RefusedEnergy
10 YEAR PERMISSION FOR THE CONSTRUCTION OF AN ENERGY STORAGE FACILITY WITHIN A TOTAL SITE AREA OF UP TO…
CLARE , CLAREMORRIS , CO. MAYO
1823MayoLodged 18 Jan 2018
- GrantedEnergy
AN ENERGY STORAGE FACILITY DESIGNED TO PROVIDE SYSTEM SUPPORT SERVICES TO THE ELECTRICITY GRID ON A…
COOLCOR AND CLONIN , RHODE , CO. OFFALY
20238OffalyLodged 23 Jun 2020
Community
Discussion
What local people think about this application.
Community sentiment
No votes yetNobody has voted on this application yet.
Community sentiment — a straw poll of people who visited this page, not a statutory submission. To make a valid observation you must submit it to the planning authority.
Sign in to have your say on this application.
No comments yet. Be the first to say what you think about this application.
Sign in to join the discussion on this application.
Comments are moderated and are the opinions of the people who wrote them. They form no part of the statutory planning process — to make a valid observation you must submit it to the planning authority.