Planning Permission Ireland
Awaiting decisionDecision due in ~5 weeks (24 August 2026)

WINDYHALL, LETTERKENNY, CO. DONEGAL

A period of 10 years for a large-scale residential development (lrd) consisting of the provision of a total of 346 no. Residential units along with the provision of a…

2661208 · Donegal County Council · Lodged 30 June 2026

Reference
2661208
Authority
Donegal County Council
Register status
In progress
Type
PERMISSION
Received
30 June 2026
Residential units
171
Floor area
3138.1300000000056 m²

Official record

Development description

A period of 10 years for a large-scale residential development (lrd) consisting of the provision of a total of 346 no. Residential units along with the provision of a neighbourhood centre that will incorporate a creche. Particulars of the development comprise as follows (1) site excavation works to facilitate the proposed development to include excavation and general site preparation works, (2) provision of a total of 346 no. Residential units which will consist of: 10 no. 1 bed duplex apartment units; 123 no. 2 bed duplex apartment units; 42 no. 3 bed duplex apartment units; 98 no. 2 bed dwellings; 53 no. 3 bed dwellings and 20 no. 4 bed dwellings. Building typologies range in height from single to three storey and comprise a mixture of detached, semi-detached and terraced dwellings along with provision of duplex apartment units, (3) provision of a creche that will serve as a neighbourhood centre, (4) provision of associated car parking at surface level via a combination of in-curtilage parking for dwellings and via on-street parking for the creche and apartment units, (5) provision of electric vehicle charge points with associated site infrastructure ducting to provide charge points for residents throughout the site, (6) provision of associated bicycle storage facilities at surface level throughout the site and bin storage facilities, (7) provision of associated open space areas, residential communal open space areas to include formal play areas along with all hard and soft landscape works for private gardens and amenity spaces along with public lighting, planting and boundary treatments to include boundary walls, retaining walls, railings and fencing, (8) provision of a new link road with associated works to include for provision of associated cycle and walking infrastructure along with ancillary works to include for culverting of existing watercourses, landscaping and lighting works. The proposed link road will facilitate part of the northern network project, (9) provision of new entrances onto the new link road with associated pedestrian connections, (10) provision of internal culverts and associated works along with realignment and decommissioning of existing drainage channels within the site. Culvert works to include for provision of headwalls, (11) provision of esb substations, (12) associated internal site works and attenuation systems to include for hydrocarbon and silt interceptors, (13) provision of ancillary site development/construction works

Built & sold

What happened next

Beyond the decision: whether this development was built, and what property here has sold for.

Recent sales nearby

within 500 m
Residential Property Price Register sales within 500 metres of this site
AddressDatePriceDistance
35 Manorview Park, Long Lane, LetterkennyApr 2026€170,000279 m
Ballyboe, Glencar Irish, LetterkennySept 2025€170,000298 m
1 Manor View Park, Letterkenny, Co. DonegalApr 2026€215,000338 m
Longlane, Glencar, LetterkennyApr 2026€40,000386 m
16 Ard Lonan, Letterkenny, Donegalnot full market priceFeb 2025€40,000405 m
Windyhall, Letterkenny, DonegalApr 2026€465,000410 m
3 Clachan Mor, Windy Hall, LetterkennyAug 2025€356,000411 m
3 Fairgreen Park, Letterkenny, Co DonegalMay 2026€135,000413 m

Nearby properties, not this site — a guide to local values.

Sources: Building Control Management System (commencement notices) and the Residential Property Price Register, licensed under CC BY 4.0. Records are matched to this application by location and may not be exhaustive; always confirm against the official source before relying on them.

Key dates

Timeline

  1. Application received30 June 2026
  2. Decision due24 August 2026

In the area

Applications near this site

Other planning applications within about 500 m — what else is being proposed or built nearby.

Related developments

Similar applications

Ranked by what these developments actually propose, not by matching words — so you can see how comparable applications were decided.

Community

Discussion

What local people think about this application.

Nobody watching yet

Community sentiment

No votes yet

Nobody has voted on this application yet.

Community sentiment — a straw poll of people who visited this page, not a statutory submission. To make a valid observation you must submit it to the planning authority.

Sign in to have your say on this application.

No comments yet. Be the first to say what you think about this application.

Sign in to join the discussion on this application.

Comments are moderated and are the opinions of the people who wrote them. They form no part of the statutory planning process — to make a valid observation you must submit it to the planning authority.