Front of Dublin Bus, Prebend Street, Constitution Hill, Phibsborough, Dublin 7, D07 RC67.
Site works and material storage guidelines near a protected structure at Constitution Hill.
0115/23 · Dublin City Council · Lodged 28 March 2023
- Reference
- 0115/23
- Authority
- Dublin City Council
- Register status
- Decided
- Received
- 28 March 2023
Summary
AI-generatedThis application outlines the installation, setting up, and material storage guidelines for works near a protected structure at Dublin Bus on Prebend Street. It mandates maintaining a safe distance of 25 meters from the protected building to prevent damage and disruption.
Generated from the description above by an AI model and may contain mistakes. The council’s description is the authoritative record.
Official record
Development description
Installation and setting up: the installation on site and the setting up of works must be carried out always maintaining reasonable distance from the protected structure and its ancillary buildings and installations, in order to prevent any possible damage to the listed building. It is recommended that a minimum distance of 25m from the protected building should be observed at all times. If less would be required, agreement should be sought with dublin bus and the professional in charge of the works. Materials delivery and storage: once installation and setting up has been implemented, delivery and storage of materials should be organised and planned reasonably in advance and its movements and placed of storage be established so that no damage is caused to the protected structure as well as no disruption to its operation. Site maintenance and site works: due to how exposed is the area that the proposed works are to be located and its proximity to the newly approved esb substation, now being built, the site is to be maintained in a tidy and organised manner at all times, so not to provide any context for detrimental effects for either the main protected structure or its curtilage. Existing stone boundary wall: although the existing stone wall that forms the north boundary of the site is not part of the proposal and it is not envisaged to be modified in any way by this proposal, care is to be taken and protection is to be provided to it during works so as to prevent any damage to any part of the said stone wall. Once works would have been finalised, any temporary protection installed is to be carefully removed and area thoroughly cleaned before hand-over. Concrete slab: the concrete slab will serve as a base where to fix the steel structure of the e-house and is to be constructed as per structural engineer's details and specifications. It is worth noting that the proposed slab is to be constructed in an existing fully concrete paved external bus yard. It would be the only element of the proposal that might be considered to have a more permanent quality. However, it is to be so designed as to provide a reasonably easy and clean removal as possible (having consideration to its nature). No part of that concrete slab is to affect the existing stone wall or its foundations in any way. Steel structure: steel structure to be constructed structural engineer's details and specifications, will be fully removable and is considered to be fully reversible. In any event, care is to be had in its installation so that the existing boundary stone wall would not be affected by it. Also, no amount of anti-corrosive paint to be applied can damage the said stone wall during construction. Cladding: the steel structure is to be cladded externally with selected metal cladding and in order to minimise any visual impact and to be consistent with was approved on the application ref. N°3435/22 for the adjacent esb substation, the new e-house is to be painted with similar ral 5008 grey blue colour. No spillage is to be allowed while painting. Finishes: roof and rainwater goods are to be also in aluminium, painted with matching colour as described above. Hand-over: works are to be received by client once properly finished, together with a cleaned site and demonstration that no damage has affected the protected structure or the boundary stone wall.
Key dates
Timeline
- Application received28 March 2023
- Decision due25 April 2023
- Decision issued25 April 2023
Related developments
Similar applications
Ranked by what these developments actually propose, not by matching words — so you can see how comparable applications were decided.
- Not exempt — permission neededInfrastructure
EXPP: PROTECTED STRUCTURE: A single storey E-House (electrical house or power-house, which are walk-in…
Rear of Dublin Bus Garage, Prebend Street, Constitution Hill, Phibsborough, Dublin 7, D07 RC67.
0114/23Dublin CityLodged 28 Mar 2023
- Not exempt — permission neededInfrastructure
EXPP: Proposal to locate an E- House at the Dublin Bus Summerhill Bus Depot. The proposal includes for a…
Dublin Bus - Summerhill Depot, Mountjoy Place, Dublin 1, D01 EY86
0111/23Dublin CityLodged 28 Mar 2023
- InvalidAlterations
PROTECTED STRUCTURE : 10 YEAR PERMISSION for development at 57 Pembroke Road, Dublin 4.a Protected Structure.…
57, Pembroke Road, Dublin 4
4341/24Dublin CityLodged 11 Oct 2024
- Exempt — no permission neededAlterations
EXPP: PROTECTED STRUCTURE: List of Proposed Works Roof: Existing natural slated to be carefully removed,…
Rockville House, 1A, Ailesbury Road, Dublin 4
0200/23Dublin CityLodged 16 Jul 2023
- InvalidCommercial
PROTECTED STRUCTURE: The works include the removal of the two storey prefabricated buildings on the northern…
Catholic University School, 89-92, Leeson Street Lower, Dublin 2
4942/22Dublin CityLodged 28 Sept 2022
- GrantedAlterations
PROTECTED STURCTURE — (10 year permission) The development will consist of: (a) Fabric repair works: (i)…
59 Pembroke Road, Ballsbridge, Dublin 4
WEB5203/25Dublin CityLodged 23 Sept 2025
Community
Discussion
What local people think about this application.
Community sentiment
No votes yetNobody has voted on this application yet.
Community sentiment — a straw poll of people who visited this page, not a statutory submission. To make a valid observation you must submit it to the planning authority.
Sign in to have your say on this application.
No comments yet. Be the first to say what you think about this application.
Sign in to join the discussion on this application.
Comments are moderated and are the opinions of the people who wrote them. They form no part of the statutory planning process — to make a valid observation you must submit it to the planning authority.