Planning Permission Ireland
Awaiting decisionInfrastructureDecided 26 May 2026

Joshua Dawson House, 19B, Dawson Street, Dublin 2

Installation of wireless broadband equipment and antennas on the rooftop.

0167/26 · Dublin City Council · Lodged 29 April 2026

Reference
0167/26
Authority
Dublin City Council
Register status
Decided
Received
29 April 2026

Summary

AI-generated

This application seeks a declaration for the installation of wireless broadband equipment on the rooftop of Joshua Dawson House. The works entail installing steelwork, a dish, and two antennas on the side of the boiler house plant room, with cabling running to an internal communications room.

Infrastructuretelecomsbroadbandrooftopantenna

Generated from the description above by an AI model and may contain mistakes. The council’s description is the authoritative record.

Official record

Development description

Expp: installation of a wireless broadband equipment connection. This work entails installing steelwork and dish on rooftop at agreed location and cable will be ran from this dish down to comms room in the building. Cable route and dish position will have been agreed at survey stage. Idu is mounted internally in the customers rack. All telecoms equipment is 48volts dc. 2 antennas are required. 1 nuritas and 1 sub let tenant gh research for the 2nd floor. Antennas will be installed at the side of the boiler house plant room on the roof, they are minimal in size as per the spec sheets provided.

Land-use zoning

What this land is zoned for

Z5: City CentreUC
To consolidate and facilitate the development of the central area, and to identify, reinforce, strengthen and protect its civic design character and dignity.

National zoning type: City/Town/village Centre, central area

Objective set by the Development Plan 2022-2028 (2022–2028). The planning authority decides each application on its own merits — this is the zoning context, not a compliance assessment.

Read the zoning objectives in the development plan

Built & sold

What happened next

Beyond the decision: whether this development was built, and what property here has sold for.

Recent sales nearby

within 500 m
Residential Property Price Register sales within 500 metres of this site
AddressDatePriceDistance
Apt 3, 12b Merrion Court, Merrion RowDec 2025€1,700,000322 m
16 Hume Street, Dublin 2Jul 2025€400,000324 m
1 Prouds Lane, St Stephens Green, Dublin 2May 2026€605,000340 m
Apt 12 Russell Court, 95/96 St Stephens Green, Dublin 2Jul 2025€615,000393 m
Apt 14, Dunloe Hall, Merrion StSept 2025€830,000409 m
23 Dunloe Hall 27 Merrion St, Dublin 2, DublinFeb 2025€950,000409 m
Apartment 1, 17 Fade Street, Dublin 2Feb 2026€1,275,000417 m
12 Cuffe Lane, Cuffe St, Dublin 2Aug 2025€460,000419 m

Nearby properties, not this site — a guide to local values.

Sources: Building Control Management System (commencement notices) and the Residential Property Price Register, licensed under CC BY 4.0. Records are matched to this application by location and may not be exhaustive; always confirm against the official source before relying on them.

Key dates

Timeline

  1. Application received29 April 2026
  2. Decision due26 May 2026
  3. Decision issued26 May 2026

In the area

Applications near this site

Other planning applications within about 500 m — what else is being proposed or built nearby.

Related developments

Similar applications

Ranked by what these developments actually propose, not by matching words — so you can see how comparable applications were decided.

Community

Discussion

What local people think about this application.

Nobody watching yet

Community sentiment

No votes yet

Nobody has voted on this application yet.

Community sentiment — a straw poll of people who visited this page, not a statutory submission. To make a valid observation you must submit it to the planning authority.

Sign in to have your say on this application.

No comments yet. Be the first to say what you think about this application.

Sign in to join the discussion on this application.

Comments are moderated and are the opinions of the people who wrote them. They form no part of the statutory planning process — to make a valid observation you must submit it to the planning authority.