Boundary Wall at St Joseph's Terrace, North Circular Road, Dublin 1
Reconstruction and structural remediation of a stone boundary wall on North Circular Road.
0298/23 · Dublin City Council · Lodged 9 August 2023
- Reference
- 0298/23
- Authority
- Dublin City Council
- Register status
- Decided
- Received
- 9 August 2023
Summary
AI-generatedThe project involves the structural remediation of an existing natural stone boundary wall. Works will include removing and storing the stone for reuse, constructing new foundations, and building a hollowblock retaining wall on the inner leaf.
Generated from the description above by an AI model and may contain mistakes. The council’s description is the authoritative record.
Official record
Development description
- Expp: the proposed works will involve the re construction of the existing stone boundary wall along the extent of st. Joseph's terrace, north circular road, dublin
- This is outlined under drawing number 23_wcu001-001. The intent is too structural remediate the existing boundary wall to enhance the design life and durability for the next 50 years in accordance with relevant code of practice. The works will involve the removal and storage of the existing natural stone wall for reuse. The wall as outlined on the attached condition survey report requires structural remediation. New foundations will be constructed as outlined on the attached plan layout and sections drawing 23_wcu001-001. Where required a hollowblock retaining wall shall be constructed on the inner leaf with associated reinforced hollowblock piers as detailed under the attached drawing 23_wcu001-001. All required works shall be completed by a competent contractor and inspected and signed off by a chartered engineer. All required movement joints and weathering/flashing to comply with associated drawing 23_wcu001-001. A structural reinforced coping ring beam shall be constructed at the top of the wall to replicate current form of construction and the external public face along st. Joseph's terrace shall be finished with the existing natural stone stored to replicate the current form
Key dates
Timeline
- Application received9 August 2023
- Decision due6 September 2023
- Decision issued6 September 2023
Related developments
Similar applications
Ranked by what these developments actually propose, not by matching words — so you can see how comparable applications were decided.
- WithdrawnAlterations
PROTECTED STRUCTURE The development will consist of (1) the removal and storage of the existing natural stone…
The Communication Workers Union No. 575 North Circular Road, Dublin 1
3678/24Dublin CityLodged 14 May 2024
- Exempt — no permission neededAlterations
EXPP: Reconstruction of front boundary wall at 34 & 34A Seafield Road West, Clontarf. Existing piers and wing…
34, Seafield Road West, Clontarf, Dublin 3, D03 PV44
0350/23Dublin CityLodged 5 Oct 2023
- Awaiting decisionAlterations
EXPP: PROTECTED STRUCTURE: The intention is to carry out necessary repair and maintenance works to the…
65 Terenure Road East, Rathgar, Dublin 6
0032/24Dublin CityLodged 31 Jan 2024
- InvalidAlterations
PROTECTED STRUCTURE We, the Communication Workers Union, intend to apply for permission for development at…
The Communications Workers' Union, No. 575 North Circular Road, Dublin 1, D01 TR53
WEB2996/25Dublin CityLodged 29 Aug 2025
- Part granted, part refusedAlterations
EXPP: PROTECTED STRUCTURE: The works proposed comprise repair and conservation of the existing rear garden…
5, Mount Street Crescent, Dublin, D02 NY53
0505/25Dublin CityLodged 18 Nov 2025
- GrantedAlterations
PROTECTED STRUCTURE: We, the Communication Workers Union, intend to apply for permission for development at…
Communications Workers' Union, 575 North Circular Road, Dublin 1
WEB5024/25Dublin CityLodged 2 Sept 2025
Community
Discussion
What local people think about this application.
Community sentiment
No votes yetNobody has voted on this application yet.
Community sentiment — a straw poll of people who visited this page, not a statutory submission. To make a valid observation you must submit it to the planning authority.
Sign in to have your say on this application.
No comments yet. Be the first to say what you think about this application.
Sign in to join the discussion on this application.
Comments are moderated and are the opinions of the people who wrote them. They form no part of the statutory planning process — to make a valid observation you must submit it to the planning authority.