Planning Permission Ireland
Exempt — no permission neededExtensionDecided 21 October 2024

128 Cork Street, The Liberties, Dublin 8, D08K5RH

Renovation and extension of a 300-year-old house on Cork Street to five storeys.

0352/24 · Dublin City Council · Lodged 23 September 2024

Reference
0352/24
Authority
Dublin City Council
Register status
Decided
Received
23 September 2024

Summary

AI-generated

The project involves raising a two-storey mid-terrace building over a basement to five storeys. It includes reinstating a historic Dutch Billy elevation and retaining the original brick walls.

Extensionheritagerenovationextensiondutch billy
Storeys
5

Generated from the description above by an AI model and may contain mistakes. The council’s description is the authoritative record.

Official record

Development description

Shec: renovation and extension. The development consists of: reinstatement of the dutch billy elevation acknowledging its historical past. Reinstatement of past two storey above existing building via, the raising of existing mid-terrace flat roofed two storey over raised basement building to five storey over raised basement building with a new flat roof. The fabric of the existing two storey house which is c. 300 years old and consists of original brick walls with sand and cement render is to be retained and the new external and internal walls above the first floor are to be a mixture of new solid and non-solid construction. The terrace to the west of no 128 consists of early 20 th century red brick two storey houses with pitched slated roofs and upvc windows and doors, while the housing to the east consists of deck access two storey housing with a concrete tiled pitched roof, developed, owned and managed by dublin city council for housing for older people. The existing solid party wall between no 126 and no 128, wholly located within the red line of the applicant site, is to be retained and raised to the fifth floor parapet level of the raised building. The new building will have the following accommodation: at ground floor, an entrance hall accessing a lift and stair core located to the existing rear return of the building, providing vertical circulation for the new raised building with emergency and other ingress and egress to public domain at robinsons court, as well as an office unit. At first floor level two short term let residential units served via the new rear lift/stair core. At second floor level a new long term let two bedroom residential unit served by the lift/stair core. At third floor level a similar new long term let one bedroom residential unit served by the lift/stair core. At fourth floor level a new long term let one bedroom residential penthouse unit with south facing terrace private open space served by the lift/stair core. Addition of balconies to rear wall of all long term let residential units. Reinstatement of basement level for storage, plant and services use. At roof level there is a zinc parapet and sedum covered flat roof. Windows and doors to be thermally broken aluminium framed units to selected colour with triple glazing. Currently external walls are rendered and painted, new walls to be similarly rendered and painted to selected colours. The walls to the sides and rear including cills are to be wrapped with insulation and rendered to match the existing. All existing cut granite elements including cills, parapet stones and granite entrance steps are to be retained protected and preserved. Existing granite cills to have paint removed and exposed. Cills to new windows to be matching exposed granite. Minor alterations including moving of existing rear door and creation of new plant service only access doors along rear site boundary. The proposed floor areas are as follows: basement 47.9 sqm, gf 75 sqm, ff 76.3 sqm, sf 77.5 sqm, tf 77.5 sqm, penthouse 65sqm. The office and residential units have south facing views over weaver park across the road from the site. All units enjoy north/south duel aspect. Provision for all associated equipment and services and internal and external refurbishment and site works.

Key dates

Timeline

  1. Application received23 September 2024
  2. Decision due21 October 2024
  3. Decision issued21 October 2024

Related developments

Similar applications

Ranked by what these developments actually propose, not by matching words — so you can see how comparable applications were decided.

Community

Discussion

What local people think about this application.

Nobody watching yet

Community sentiment

No votes yet

Nobody has voted on this application yet.

Community sentiment — a straw poll of people who visited this page, not a statutory submission. To make a valid observation you must submit it to the planning authority.

Sign in to have your say on this application.

No comments yet. Be the first to say what you think about this application.

Sign in to join the discussion on this application.

Comments are moderated and are the opinions of the people who wrote them. They form no part of the statutory planning process — to make a valid observation you must submit it to the planning authority.