Planning Permission Ireland
Not exempt — permission neededAlterationsDecided 1 October 2025

170, Rathmines Road Lower, Rathmines, Dublin, 6

Replacement of a retractable parasol with an aluminium pergola sun breaker at a protected structure in Rathmines.

0390/25 · Dublin City Council · Lodged 4 September 2025

Reference
0390/25
Authority
Dublin City Council
Register status
Decided
Received
4 September 2025

Summary

AI-generated

The application seeks permission for works at a protected structure on Rathmines Road Lower. This involves replacing an existing retractable, demountable rectangular parasol with an aluminium pergola sun breaker at the lower ground floor level to the front.

Alterationspergolaheritage

Generated from the description above by an AI model and may contain mistakes. The council’s description is the authoritative record.

Official record

Development description

Expp: protected structure: replacement of existing retractable demountable rectangular parasol with a aluminium structure pergola sun breaker at lower ground floor level to front.

Key dates

Timeline

  1. Application received4 September 2025
  2. Decision due2 October 2025
  3. Decision issued1 October 2025

Related developments

Similar applications

Ranked by what these developments actually propose, not by matching words — so you can see how comparable applications were decided.

Community

Discussion

What local people think about this application.

Nobody watching yet

Community sentiment

No votes yet

Nobody has voted on this application yet.

Community sentiment — a straw poll of people who visited this page, not a statutory submission. To make a valid observation you must submit it to the planning authority.

Sign in to have your say on this application.

No comments yet. Be the first to say what you think about this application.

Sign in to join the discussion on this application.

Comments are moderated and are the opinions of the people who wrote them. They form no part of the statutory planning process — to make a valid observation you must submit it to the planning authority.