Planning Permission Ireland
Part granted, part refusedAlterationsDecided 13 October 2025

The Lodge, Mount Jerome Cemetery, Harold's Cross, Dublin 6W

Interior improvements and energy upgrades to a protected lodge at Mount Jerome Cemetery.

0407/25 · Dublin City Council · Lodged 16 September 2025

Reference
0407/25
Authority
Dublin City Council
Register status
Decided
Received
16 September 2025

Summary

AI-generated

The application details internal re-ordering and energy retrofitting of a family home. Works include installing solar PV panels, upgrading windows to triple-glazed Aluclad, replacing stairs, and altering the layout of bedrooms and the kitchen.

Alterationsprotected structureretrofitsolar

Generated from the description above by an AI model and may contain mistakes. The council’s description is the authoritative record.

Official record

Development description

  • Expp: protected structure: the works are for improvements to facilitate the continuing use of the lodge as a family home which include certain re-ordering of the interior is proposed. It is further proposed to undertake an energy refit in accordance with the accompanying building upgrade specification prepared which includes the installation of solar pv panels and the upgrading of the fenestration. List of works
  • Subdivide rear bedroom
  • Change living room to master bedroom
  • Remove spiral stairs and light wells
  • Fit new straigh stairs
  • Fit glazed lightwell to floor over
  • Remove rear bedrooms and form new kitchen dining room
  • Alter ceiling profile and fit rooflights over
  • Remove front lobby, spiral stairs and kitchen dining
  • Form new entrance lobby and storage closets
  • Fit glazed panel in floor for lightwell to basement
  • Remove spiral stairs and form new straight stairs
  • Form void in floor corner
  • Replace existing windows and doors of extension with triple-glazed aluclad windows
  • Retain timber windows in the original lodge
  • Reain existing entrance door
  • Insulation slabs are to be placed on top of existing tiled floor and covered with a laminate wooden floor
  • Wall mounted radiators will be installed in the two new proposed bedrooms
  • Remove existing ceiling
  • Form new ceiling to revised profile
  • Install breathable insulation within roof and ensure adequate ventilation
  • Install air to water heat pump and heating system
  • Install heat recovery ventilation system

Key dates

Timeline

  1. Application received16 September 2025
  2. Decision due14 October 2025
  3. Decision issued13 October 2025

Related developments

Similar applications

Ranked by what these developments actually propose, not by matching words — so you can see how comparable applications were decided.

Community

Discussion

What local people think about this application.

Nobody watching yet

Community sentiment

No votes yet

Nobody has voted on this application yet.

Community sentiment — a straw poll of people who visited this page, not a statutory submission. To make a valid observation you must submit it to the planning authority.

Sign in to have your say on this application.

No comments yet. Be the first to say what you think about this application.

Sign in to join the discussion on this application.

Comments are moderated and are the opinions of the people who wrote them. They form no part of the statutory planning process — to make a valid observation you must submit it to the planning authority.