Planning Permission Ireland
GrantedChange of useDecided 18 March 2021

The Watchtower, Parade Square, Clancy Quay, Islandbridge, Dublin 8

Ancillary use of part of a ground floor retail unit as an off-licence within a protected structure curtilage.

2074/21 · Dublin City Council · Lodged 22 January 2021

Reference
2074/21
Authority
Dublin City Council
Register status
Decided
Type
Permission
Received
22 January 2021

Summary

AI-generated

Permission is sought for the ancillary use of a 40 sqm portion of an existing ground floor retail unit as an off-licence. The unit is located within the Watchtower building, which is situated within the curtilage of protected structures at the former Clancy Barracks.

Change of useoff licenceretailheritage
Floor area
40 m²

Generated from the description above by an AI model and may contain mistakes. The council’s description is the authoritative record.

Official record

Development description

  • Protected structure: permission for development within the ground floor retailing unit of the building known as the watchtower at parade square, clancy quay, islandbridge, dublin 8 (a recently constructed multi-storey building) located within the curtilage of the protected structures referred to within the former clancy barracks off the south circular road, dublin
  • The development will consist of the ancillary use as an off-licence (for the sale of intoxicating liquor for consumption off the premises) of part (40sqm) of the retailing unit

Land-use zoning

What this land is zoned for

Z10: Inner Suburban and inner City Sustainable Mixed-UsesRE
To consolidate and facilitate the development of inner city and inner suburban sites for mixed-uses.

National zoning type: Mixed Use, general development, opportunity/proposal site

Objective set by the Development Plan 2022-2028 (2022–2028). The planning authority decides each application on its own merits — this is the zoning context, not a compliance assessment.

Read the zoning objectives in the development plan

Built & sold

What happened next

Beyond the decision: whether this development was built, and what property here has sold for.

Built — construction complete

A commencement notice records works starting on 9 August 2021.

Notified floor area: 623.5

Recent sales nearby

within 500 m
Residential Property Price Register sales within 500 metres of this site
AddressDatePriceDistance
513 Kilmainham Sq, Inchicore Rd, Kilmainham Dublin 8Mar 2026€510,000179 m
610 Kilmainham Sq, Inchicore Rd, KilmainhamFeb 2025€367,000190 m
445 Kilmainham Sq, Inchicore Rd, Dublin 8Feb 2025€215,000199 m
422 Kilmainham Sq, Inchicore Rd, Kilmainham Dublin 8Feb 2025€450,000199 m
442 Old Chocolate Factory, Kilmainham, Dublin 8Jun 2026€475,000199 m
Apt 407, Kilmainham Sq, Kilmainham Dublin 8Feb 2025€416,000199 m
36 Kilmainham Sq, Inchicore Rd, Dublin 8Sept 2025€509,000217 m
33 Kilmainham Sq, Inchicore Rd, Dublin 8Nov 2025€452,000217 m

Nearby properties, not this site — a guide to local values.

Sources: Building Control Management System (commencement notices) and the Residential Property Price Register, licensed under CC BY 4.0. Records are matched to this application by location and may not be exhaustive; always confirm against the official source before relying on them.

Key dates

Timeline

  1. Application received22 January 2021
  2. Decision due18 March 2021
  3. Decision issued18 March 2021
  4. Grant issued29 April 2021

In the area

Applications near this site

Other planning applications within about 500 m — what else is being proposed or built nearby.

Related developments

Similar applications

Ranked by what these developments actually propose, not by matching words — so you can see how comparable applications were decided.

Community

Discussion

What local people think about this application.

Nobody watching yet

Community sentiment

No votes yet

Nobody has voted on this application yet.

Community sentiment — a straw poll of people who visited this page, not a statutory submission. To make a valid observation you must submit it to the planning authority.

Sign in to have your say on this application.

No comments yet. Be the first to say what you think about this application.

Sign in to join the discussion on this application.

Comments are moderated and are the opinions of the people who wrote them. They form no part of the statutory planning process — to make a valid observation you must submit it to the planning authority.