Planning Permission Ireland
GrantedExtensionDecided 17 May 2019

6, Palmerston Road, Rathmines, Dublin 6

Demolition of a rear extension and construction of a new part-single, part-two-storey extension at a protected structure.

2102/19 · Dublin City Council · Lodged 23 January 2019

Reference
2102/19
Authority
Dublin City Council
Register status
Decided
Type
Permission
Received
23 January 2019

Summary

AI-generated

The project involves demolishing a non-original two-storey rear extension and building a new part-single, part-two-storey extension. It includes extensive internal and external modifications, window refurbishments, and structural alterations to the protected structure.

Extensionextensionprotected structurerefurbishment

Generated from the description above by an AI model and may contain mistakes. The council’s description is the authoritative record.

Official record

Development description

Protected structure: the development will consist of the demolition of an existing non-original two storey extension to rear and the subsequent erection of a new part single storey/part two storey extension to rear/side including the partial removal of external walls to rear of main house & rear return to accommodate the extension; external modifications to include repointing the brick facades, refurbishment of existing windows and front door including fanlight; new window and door to lower ground floor level and new window at first floor level to existing side (south) elevation; replacement of the non-original window to the south side of the rear return at upper ground floor level with new escape window; replacement of non-original door to front porch at lower ground floor level; internal modifications to existing layout to include the original internal partitions in the rear return incorporating the removal of a bathroom at second floor return level and a new ensuite at first floor return level; a new ensuite at first floor level in main house; removal of non-original walls at first floor level in main house; replacement of non-original staircase & associated works at lower ground floor level; 2 no. New rooflights to single storey extension to rear; new conservation rooflight to side (south) existing return roof, widening of external gate to side passage; general restoration & decoration works; and all associated site works to existing semi-detached three storey house.

Land-use zoning

What this land is zoned for

Z2: Residential Neighbourhoods (Conservation Areas)RS
To protect and/or improve the amenities of residential conservation areas.

National zoning type: Existing residential

Objective set by the Development Plan 2022-2028 (2022–2028). The planning authority decides each application on its own merits — this is the zoning context, not a compliance assessment.

Read the zoning objectives in the development plan

Built & sold

What happened next

Beyond the decision: whether this development was built, and what property here has sold for.

Built — construction complete

A commencement notice records works starting on 20 January 2020.

Notified floor area: 318

Recent sales nearby

within 500 m
Residential Property Price Register sales within 500 metres of this site
AddressDatePriceDistance
71 Palmerston Rd, Rathmines, Dublin 6Apr 2025€3,300,000100 m
6 Belgrave Road, Rathmines, Dublin 6Dec 2025€1,900,000105 m
Apt 25 Park House, Palmerstown Rd, Dublin 6Jan 2026€395,000123 m
5 Acorn House, Seven Oaks, Church Ave Dublin 6Sept 2025€390,000123 m
9 Rossaun, Seven Oaks, Purser Gardens Dublin 6May 2025€380,000141 m
4 Rossaun, Seven Oaks, Purser Gardens Dublin 6Jul 2025€384,000141 m
37 Belgrave Rd, Rathmines, Dublin 6Jan 2025€1,610,000149 m
38 Killeen Rd, Ranelagh, Dublin 6Jul 2025€1,110,000157 m

Nearby properties, not this site — a guide to local values.

Sources: Building Control Management System (commencement notices) and the Residential Property Price Register, licensed under CC BY 4.0. Records are matched to this application by location and may not be exhaustive; always confirm against the official source before relying on them.

Key dates

Timeline

  1. Application received23 January 2019
  2. Further information requested20 March 2019
  3. Further information received24 April 2019
  4. Decision due21 May 2019
  5. Decision issued17 May 2019
  6. Grant issued26 June 2019

In the area

Applications near this site

Other planning applications within about 500 m — what else is being proposed or built nearby.

Related developments

Similar applications

Ranked by what these developments actually propose, not by matching words — so you can see how comparable applications were decided.

Community

Discussion

What local people think about this application.

Nobody watching yet

Community sentiment

No votes yet

Nobody has voted on this application yet.

Community sentiment — a straw poll of people who visited this page, not a statutory submission. To make a valid observation you must submit it to the planning authority.

Sign in to have your say on this application.

No comments yet. Be the first to say what you think about this application.

Sign in to join the discussion on this application.

Comments are moderated and are the opinions of the people who wrote them. They form no part of the statutory planning process — to make a valid observation you must submit it to the planning authority.