Planning Permission Ireland
GrantedRetentionDecided 13 April 2021

29 Ranelagh, The Triangle, Ranelagh, Dublin 6

Retention of a first-floor LED advertising sign and permission to convert it to an alternating static LED display.

2233/21 · Dublin City Council · Lodged 17 February 2021

Reference
2233/21
Authority
Dublin City Council
Register status
Decided
Type
Permission
Received
17 February 2021

Summary

AI-generated

The applicant seeks retention of an existing first-floor LED advertising sign structure. Permission is also sought to convert it to an alternating static LED display, which would involve decommissioning outdoor signage on Bachelors Walk and O'Connell Street Lower.

Retentionadvertisingsignageretention

Generated from the description above by an AI model and may contain mistakes. The council’s description is the authoritative record.

Official record

Development description

Permission & retention: retention permission to retain the existing led advertising sign (3m high by 6m wide by 150mm deep) structure at first floor level at 29 ranelagh, the triangle, ranelagh, dublin 6, and seeks planning permission to convert its usage to a led display sign which will carry a series of alternating static advertisements (6 per minute). If granted, the permission would be on the basis of decommissioning, in line with the outdoor advertising policy of dublin city council, outdoor signage on the upper two floors of 34 bachelors walk and 56 o’connell street lower, (a protected structure), dublin 1.

Land-use zoning

What this land is zoned for

Z4: Key Urban Villages/Urban VillagesDC
To provide for and improve mixed-services facilities.

National zoning type: District, neighbourhood centre

Objective set by the Development Plan 2022-2028 (2022–2028). The planning authority decides each application on its own merits — this is the zoning context, not a compliance assessment.

Read the zoning objectives in the development plan

Built & sold

What happened next

Beyond the decision: whether this development was built, and what property here has sold for.

Recent sales nearby

within 500 m
Residential Property Price Register sales within 500 metres of this site
AddressDatePriceDistance
29a Ranelagh Rd, Ranelagh, Dublin 6Apr 2026€375,00010 m
48 Elmwood Ave, Ranelagh, Dublin 6Oct 2025€1,250,00070 m
25 Upper Hollybank Ave, Ranelagh, Dublin 6Aug 2025€940,00089 m
5 Temple Place, Ranelagh, Dublin 6Jun 2026€710,000107 m
17 Westmoreland Park, Ranelagh, Dublin 6Mar 2025€465,000115 m
18 Ranelagh Avenue, Dublin 6May 2026€1,000,000116 m
14 Elmwood Avenue Lower, Ranelagh, Dublin 6Feb 2025€750,000124 m
Apartment 6, 47-48 Chelmsford Road, Ranelaghprice excludes VATSept 2025€378,855124 m

Nearby properties, not this site — a guide to local values.

Sources: Building Control Management System (commencement notices) and the Residential Property Price Register, licensed under CC BY 4.0. Records are matched to this application by location and may not be exhaustive; always confirm against the official source before relying on them.

Key dates

Timeline

  1. Application received17 February 2021
  2. Decision due13 April 2021
  3. Decision issued13 April 2021
  4. Grant issued26 May 2021

In the area

Applications near this site

Other planning applications within about 500 m — what else is being proposed or built nearby.

Related developments

Similar applications

Ranked by what these developments actually propose, not by matching words — so you can see how comparable applications were decided.

Community

Discussion

What local people think about this application.

Nobody watching yet

Community sentiment

No votes yet

Nobody has voted on this application yet.

Community sentiment — a straw poll of people who visited this page, not a statutory submission. To make a valid observation you must submit it to the planning authority.

Sign in to have your say on this application.

No comments yet. Be the first to say what you think about this application.

Sign in to join the discussion on this application.

Comments are moderated and are the opinions of the people who wrote them. They form no part of the statutory planning process — to make a valid observation you must submit it to the planning authority.