Planning Permission Ireland
GrantedRetentionDecided 10 April 2019

77 & 78, Eugene Street, Dublin, 8

Retention and completion of works to subdivide a property back into two houses.

2301/19 · Dublin City Council · Lodged 19 February 2019

Reference
2301/19
Authority
Dublin City Council
Register status
Decided
Type
Retention Permission
Received
19 February 2019

Summary

AI-generated

The application seeks retention and completion of works to reinstate and subdivide the property into two separate dwellings. This includes the demolition of two old extensions, building two replacement single-storey rear extensions, and replacing a front window with an entrance door.

Retentionretentionsubdivisionextension
Residential units
2
Storey
1

Generated from the description above by an AI model and may contain mistakes. The council’s description is the authoritative record.

Official record

Development description

Retention: the development will consist of the retention & completion of works to the dwellings that include the following i) reinstatement / subdivision of property into 2 no. Dwellings along with associated internal reconfiguration works; ii) removal of existing chimney; iii) demolition of previously constructed 2 no. Rear single-storey extensions (which contained a kitchen & bedroom); iv) construction of 2 no replacement single-storey rear extensions to both dwellings (14.1 m2 & 13.8 m2 respectively, both containing kitchen / living areas) and v) replacement of existing window on front elevation with new entrance door.

Land-use zoning

What this land is zoned for

Z1: Sustainable Residential NeighbourhoodsRS
To protect, provide and improve residential amenities.

National zoning type: Existing residential

Objective set by the Development Plan 2022-2028 (2022–2028). The planning authority decides each application on its own merits — this is the zoning context, not a compliance assessment.

Read the zoning objectives in the development plan

Built & sold

What happened next

Beyond the decision: whether this development was built, and what property here has sold for.

Recent sales nearby

within 500 m
Residential Property Price Register sales within 500 metres of this site
AddressDatePriceDistance
39 Maxwell St, Dublin 8, DublinJun 2026€240,00024 m
7 Eugene Street, Off Cork Street, Dublin 8Jan 2026€230,00034 m
26 Maxwell Street, Dolphens Barn, South Circular Roadnot full market priceDec 2025€300,00036 m
12 Maxwell St, The Coombe, Dublin 8Sept 2025€250,00039 m
24 Maxwell St, Dublin 8, DublinJan 2025€258,00044 m
15 Maxwell St, Dublin 8Jan 2025€218,00047 m
10 Cameron St, Dublin 8, DublinMay 2025€312,00048 m
16 Maxwell St, Dublin 8Jan 2025€225,00053 m

Nearby properties, not this site — a guide to local values.

Sources: Building Control Management System (commencement notices) and the Residential Property Price Register, licensed under CC BY 4.0. Records are matched to this application by location and may not be exhaustive; always confirm against the official source before relying on them.

Key dates

Timeline

  1. Application received19 February 2019
  2. Decision due15 April 2019
  3. Decision issued10 April 2019
  4. Grant issued16 May 2019

In the area

Applications near this site

Other planning applications within about 500 m — what else is being proposed or built nearby.

Related developments

Similar applications

Ranked by what these developments actually propose, not by matching words — so you can see how comparable applications were decided.

Community

Discussion

What local people think about this application.

Nobody watching yet

Community sentiment

No votes yet

Nobody has voted on this application yet.

Community sentiment — a straw poll of people who visited this page, not a statutory submission. To make a valid observation you must submit it to the planning authority.

Sign in to have your say on this application.

No comments yet. Be the first to say what you think about this application.

Sign in to join the discussion on this application.

Comments are moderated and are the opinions of the people who wrote them. They form no part of the statutory planning process — to make a valid observation you must submit it to the planning authority.