Planning Permission Ireland
GrantedNew dwellingDecided 17 April 2019

7, Mc Auley Avenue, Artane, Dublin 5

Construction of a new two-storey, two-bedroom house to the side of 7 McAuley Avenue.

2327/19 · Dublin City Council · Lodged 21 February 2019

Reference
2327/19
Authority
Dublin City Council
Register status
Decided
Type
Permission
Received
21 February 2019
Residential units
1

Summary

AI-generated

The development will consist of a new two-storey, two-bedroom house built to the side of the existing property. It includes a new vehicular entrance driveway, a pedestrian entrance, and minor modifications to the existing house such as a new front porch and demolition of the side entrance.

New dwellinginfillsubdivision
Storeys
2

Generated from the description above by an AI model and may contain mistakes. The council’s description is the authoritative record.

Official record

Development description

Planning permission for the following: (i) construction of a new two-storey two bedroom house to the side of no. 7 mc auley avenue, with a new vehicular entrance driveway & pedestrian entrance; (ii) minor modifications to the existing house to include the demolition of existing side entrance and the construction of a new entrance porch to the front; a new roof light over the stairwell to the rear; and a new pedestrian entrance to the front; (iii) all associated site works, fencing, boundary works, ancillary drainage and landscaping, all at no. 7 mc auley avenue, artane, dublin 5.

Land-use zoning

What this land is zoned for

Z1: Sustainable Residential NeighbourhoodsRS
To protect, provide and improve residential amenities.

National zoning type: Existing residential

Objective set by the Development Plan 2022-2028 (2022–2028). The planning authority decides each application on its own merits — this is the zoning context, not a compliance assessment.

Read the zoning objectives in the development plan

Built & sold

What happened next

Beyond the decision: whether this development was built, and what property here has sold for.

Built — construction complete

A commencement notice records works starting on 16 September 2022.

Notified floor area: 70

Recent sales nearby

within 500 m
Residential Property Price Register sales within 500 metres of this site
AddressDatePriceDistance
17 Mcauley Ave, Artane, Dublin 5Jan 2025€409,00046 m
64 Bothar Lein, Artane, Dublin 5Jul 2025€540,00055 m
65 Brookfield Est, Artane, Dublin 5May 2025€320,00071 m
30 Mc Auley Ave, Artane, Dublin 5Oct 2025€428,00076 m
45 Brookfield Estate, Artane, Dublin 5Feb 2025€432,000110 m
27 Mcauley Drive, Dublin 5Jul 2025€369,000114 m
43 Lein Park, Artane, Dublin 5Aug 2025€461,000125 m
31 Mc Auley Drive, Artane, Dublin 5Jul 2025€427,000156 m

Nearby properties, not this site — a guide to local values.

Sources: Building Control Management System (commencement notices) and the Residential Property Price Register, licensed under CC BY 4.0. Records are matched to this application by location and may not be exhaustive; always confirm against the official source before relying on them.

Key dates

Timeline

  1. Application received21 February 2019
  2. Decision due17 April 2019
  3. Decision issued17 April 2019
  4. Grant issued27 May 2019

In the area

Applications near this site

Other planning applications within about 500 m — what else is being proposed or built nearby.

Related developments

Similar applications

Ranked by what these developments actually propose, not by matching words — so you can see how comparable applications were decided.

Community

Discussion

What local people think about this application.

Nobody watching yet

Community sentiment

No votes yet

Nobody has voted on this application yet.

Community sentiment — a straw poll of people who visited this page, not a statutory submission. To make a valid observation you must submit it to the planning authority.

Sign in to have your say on this application.

No comments yet. Be the first to say what you think about this application.

Sign in to join the discussion on this application.

Comments are moderated and are the opinions of the people who wrote them. They form no part of the statutory planning process — to make a valid observation you must submit it to the planning authority.