Planning Permission Ireland
GrantedAlterationsDecided 26 April 2019

Apollo House, Tara Street (D02 N920 9-11 Townsend St. (incl. The Long Stone Pub) (D02 FE00) College House, Nos. 2-3 Townsend St., (D02 F990) and the Screen Cinema, 16

Amalgamation of basements and access changes for the Apollo House and College House developments.

2415/19 · Dublin City Council · Lodged 4 March 2019

Reference
2415/19
Authority
Dublin City Council
Register status
Decided
Type
Permission
Received
4 March 2019

Summary

AI-generated

The proposal seeks to amend previous permissions by combining and re-organising the permitted basements of both buildings. It includes removing permitted car lifts on Townsend Street and replacing them with a single access ramp and dedicated cycle lifts.

Alterationsbasementcycle parkingoffice

Generated from the description above by an AI model and may contain mistakes. The council’s description is the authoritative record.

Official record

Development description

  • Permission for development at a site of 0.5 ha at apollo house, tara street (d02 n920) 9-11 townsend st. (incl. The long stone pub (d02 fe00) college house, nos. 2-3 townsend street, (d02 f990) and the screen cinema, 16-19 hawkins street (d02 dp65), dublin
  • The site is bounded by townsend st. To the south, tara st. To the east, hawkins st. To the east, hawkins house to the north and west and poolbeg st. To the north. The development consists of the amendment of previous permissions relating to college house and the former screen cinema (dcc reg. Ref: 3637/17, abp ref: pl29s. 300709) and the former apollo house (dcc reg. Ref: 3036/16, abp ref: pl29s. 247907) as follows
  • The proposed development consists of the amalgamation and re-organisation of the permitted basements and floor levels of both buildings and the removal of the permitted car lifts onto townsend st. As permitted for the redeveloped college house site. The combined, two-level, basement will be accessed from a single ramp onto townsend st. Cycle access to the basement will be via a dedicated access controlled cycle lifts accessed from townsend st. ; an additional 25 cycle spaces are proposed in the basement, in addition to a relocation of some surface level cycle parking at ground level. Reconfiguration of the permitted core layouts, from basement
  • 2 to upper levels, including roof, in both buildings and amendments to associated site servicing (foul and surface water drainage and water supply)
  • Alterations to the permitted ground floor layouts of college house and apollo house to include: increased office entrance foyer of college house and additional retail/cafe/restaurant unit onto the internal block of 121sq. M. Amalgamation and increase of permitted retail/cafe/ restaurant units in apollo house and college house to single unit of 1198sq. M (with potential to subdivide into up to 3 individual units). Revisions to elevations at ground floor level as a result of reduction in external plant and basement access. Consolidation and relocation of permitted 2 no. Substations into 1 no. Substation onto tara st. And 1 no. Substation ono townsend st. Increased office entrance foyer of apollo house onto tara st. And poolbeg st. And minor increase in the size of permitted cafe/retail/restaurant unit on the new internal route to 161sq. M
  • Increase in permitted space at
  • 1 level of apollo house to 505sq. M and removal of internal fire escape stair core
  • Overall minor increase in retail floorspace of 222sq. M and office floorspace 563sq. M resulting from these proposed alterations

Land-use zoning

What this land is zoned for

Z5: City CentreUC
To consolidate and facilitate the development of the central area, and to identify, reinforce, strengthen and protect its civic design character and dignity.

National zoning type: City/Town/village Centre, central area

Objective set by the Development Plan 2022-2028 (2022–2028). The planning authority decides each application on its own merits — this is the zoning context, not a compliance assessment.

Read the zoning objectives in the development plan

Built & sold

What happened next

Beyond the decision: whether this development was built, and what property here has sold for.

Recent sales nearby

within 500 m
Residential Property Price Register sales within 500 metres of this site
AddressDatePriceDistance
29 Corn Exchange, Poolbeg St, Dublin 2Jun 2025€290,00080 m
Apt 13, Corn Exchange, Poolbeg St Dublin 2May 2026€340,00080 m
32 Corn Exchange, Poolbeg St, Dublin 2Sept 2025€395,00080 m
43 Corn Exchange, Poolbeg St, Dublin 2Mar 2025€411,00080 m
34 Corn Exchange, Poolbeg St, Dublin 2Sept 2025€422,50080 m
63 Corn Exchange, Poolbeg St, Dublin 2Sept 2025€701,00080 m
14 College Close, Tara St, Dublin 2Nov 2025€320,00081 m
33 Trinity Plaza, Tara St, Dublin 2Jul 2025€250,000101 m

Nearby properties, not this site — a guide to local values.

Sources: Building Control Management System (commencement notices) and the Residential Property Price Register, licensed under CC BY 4.0. Records are matched to this application by location and may not be exhaustive; always confirm against the official source before relying on them.

Key dates

Timeline

  1. Application received4 March 2019
  2. Decision due26 April 2019
  3. Decision issued26 April 2019
  4. Grant issued6 June 2019

In the area

Applications near this site

Other planning applications within about 500 m — what else is being proposed or built nearby.

Related developments

Similar applications

Ranked by what these developments actually propose, not by matching words — so you can see how comparable applications were decided.

Community

Discussion

What local people think about this application.

Nobody watching yet

Community sentiment

No votes yet

Nobody has voted on this application yet.

Community sentiment — a straw poll of people who visited this page, not a statutory submission. To make a valid observation you must submit it to the planning authority.

Sign in to have your say on this application.

No comments yet. Be the first to say what you think about this application.

Sign in to join the discussion on this application.

Comments are moderated and are the opinions of the people who wrote them. They form no part of the statutory planning process — to make a valid observation you must submit it to the planning authority.