Planning Permission Ireland
GrantedChange of useDecided 8 July 2019

1, The Rise, Glasnevin, Dublin 9

Change of use from retail to a pharmacy and medical centre in Glasnevin.

2428/19 · Dublin City Council · Lodged 6 March 2019

Reference
2428/19
Authority
Dublin City Council
Register status
Decided
Type
Permission
Received
6 March 2019

Summary

AI-generated

The development consists of sub-dividing a 225 sq.m retail unit into a pharmacy at the front and a medical centre at the rear. Works include a new shopfront, incorporating a covered yard with a new concrete roof, and installing seven security-covered rooflights.

Change of usechange of usemedicalpharmacyretail
Floor area
225 m²

Generated from the description above by an AI model and may contain mistakes. The council’s description is the authoritative record.

Official record

Development description

The development will consist of the change of use from retail to a (225sq. M) sub-divided unit consisting of a pharmacy at the front and a medical centre at the rear with its entrance of woodpark. The proposed pharmacy (117sq. M) will include a nail bar (7sq. M), 2 consultation rooms, a disabled unisex wc and a shared escape corridor and new exit door with powder coated roller shutter at side of building to be used by both units. A new reconfigured aluminium glazed shopfront entrance with a disabled ramp. New signage in the existing signage zone and an illuminated led projecting pharmacy cross at the side of the building along woodpark. The proposed relocation of the existing public bin to the corner of the building. The proposed medical centre (105sq. M) will consist of the incorporating the existing covered yard by removing the existing perspex roof with a new concrete roof and building the wall level up to match the existing. The unit will also include 4 consultation rooms, a reception area, a waiting area, a unisex disabled wc, a staff wc and tea station. 7 no. Security covered rooflights on both the existing and new flat roofs. The entrance will be off woodpark and will consist of aluminium glazed shopfront with a disabled ramp, timber panelling to one side, illuminated signage and powder coated roller shutter. The existing rear single door is to be removed and the ope filled in. A 3.000m x 1.000m sign at the side of the building. It is proposed that the pharmacy will retain the address, 1 the rise, while the medical centre will be 1a, the rise, glasnevin, dublin 9.

Land-use zoning

What this land is zoned for

Z3: Neighbourhood CentresDC
To provide for and improve neighbourhood facilities.

National zoning type: District, neighbourhood centre

Objective set by the Development Plan 2022-2028 (2022–2028). The planning authority decides each application on its own merits — this is the zoning context, not a compliance assessment.

Read the zoning objectives in the development plan

Built & sold

What happened next

Beyond the decision: whether this development was built, and what property here has sold for.

Built — construction complete

A commencement notice records works starting on 27 September 2019.

Notified floor area: 100

2 commencement notices are linked to this development.

Recent sales nearby

within 500 m
Residential Property Price Register sales within 500 metres of this site
AddressDatePriceDistance
11 The Rise, Griffith Ave, Dublin 9Jul 2025€805,00043 m
2a The Rise, Glasnevin, The Rise Dublin 11Aug 2025€795,00056 m
439 Griffith Ave, Glasnevin, Dublin 9Mar 2025€1,045,000100 m
20 The Rise, Glasnevin, Dublin 9Jun 2025€898,000115 m
445 Griffith Avenue, Glasnevin, Dublin 9Jan 2025€1,100,000121 m
34 Rathlin Rd, Glasnevin, Dublin 9Jan 2025€470,000209 m
29 St Mobhi Rd, Dublin 9, DublinJun 2026€900,000260 m
18 Rathlin Rd, Glasnevin, Dublin 9Jun 2026€605,000264 m

Nearby properties, not this site — a guide to local values.

Sources: Building Control Management System (commencement notices) and the Residential Property Price Register, licensed under CC BY 4.0. Records are matched to this application by location and may not be exhaustive; always confirm against the official source before relying on them.

Key dates

Timeline

  1. Application received6 March 2019
  2. Further information requested2 May 2019
  3. Further information received11 June 2019
  4. Decision due8 July 2019
  5. Decision issued8 July 2019
  6. Grant issued20 August 2019

In the area

Applications near this site

Other planning applications within about 500 m — what else is being proposed or built nearby.

Related developments

Similar applications

Ranked by what these developments actually propose, not by matching words — so you can see how comparable applications were decided.

Community

Discussion

What local people think about this application.

Nobody watching yet

Community sentiment

No votes yet

Nobody has voted on this application yet.

Community sentiment — a straw poll of people who visited this page, not a statutory submission. To make a valid observation you must submit it to the planning authority.

Sign in to have your say on this application.

No comments yet. Be the first to say what you think about this application.

Sign in to join the discussion on this application.

Comments are moderated and are the opinions of the people who wrote them. They form no part of the statutory planning process — to make a valid observation you must submit it to the planning authority.