Planning Permission Ireland
InvalidRetentionDecided 31 March 2021

Tolka House, 8-10 Glasnevin Hill, Glasnevin, Dublin, D09 VH02

Retention of a single-storey extension and outdoor retail area at Tolka House public house.

2469/21 · Dublin City Council · Lodged 26 March 2021

Reference
2469/21
Authority
Dublin City Council
Register status
Decided
Type
Permission
Received
26 March 2021

Summary

AI-generated

The application seeks retention permission for an existing 95 sq.m. single-storey extension to the side and rear of the public house. It also includes retaining the removal of car parking spaces to provide outdoor retail areas protected by tents and awnings, alongside a proposed new storage enclosure.

Retentionpubretailretention
Storey
1
Floor area
95 m²

Generated from the description above by an AI model and may contain mistakes. The council’s description is the authoritative record.

Official record

Development description

Permission & retention: retention of existing single storey 95 sq. M. Extension with pitched and hipped roof to side and rear, previously permissioned under reg. Ref. 3104/14 and 3259/08, for public house use and for the removal of 4 no. Car park spaces to rear and 2 no. Car park spaces to side providing external retail area of 120 sq. M. And 18 sq. M. Respectively, protected by fixed frame tented structure and retractable wall mounted awnings and for proposed flat roofed walled enclosure of 19.70 sq. M. To rear for gas, keg and waste storage use.

Land-use zoning

What this land is zoned for

Z9: Amenity/Open Space Lands/Green NetworkOS
To preserve, provide and improve recreational amenity, open space and ecosystem services.

National zoning type: Mixed/general 'green'/recreation/conservation, other

Objective set by the Development Plan 2022-2028 (2022–2028). The planning authority decides each application on its own merits — this is the zoning context, not a compliance assessment.

Read the zoning objectives in the development plan

Built & sold

What happened next

Beyond the decision: whether this development was built, and what property here has sold for.

Built — construction complete

A commencement notice records works starting on 5 April 2022.

Notified floor area: 38.5

2 commencement notices are linked to this development.

Recent sales nearby

within 500 m
Residential Property Price Register sales within 500 metres of this site
AddressDatePriceDistance
9 River Gardens, Glasnevin Hill, GlasnevinJul 2025€363,50035 m
10 River Gardens, Glasnevin, DublinMay 2025€293,50035 m
5 River Gardens, Glasnevin Hill, Glasnevin Dublin 9Apr 2026€230,00035 m
9 River Gardens, Greenshillprice excludes VATJan 2026€378,37039 m
18 River Gardens, Glasnevin, Dublin 9Jun 2025€195,00046 m
51 River Gardens, Glasnevin, Dublin 9Jul 2025€410,00074 m
44 River Gardens, Glasnevin, Dublin 9Mar 2025€325,00075 m
33-101 Millfield View, Glasnevin Hill, Glasnevinprice excludes VATJun 2026€31,426,99184 m

Nearby properties, not this site — a guide to local values.

Sources: Building Control Management System (commencement notices) and the Residential Property Price Register, licensed under CC BY 4.0. Records are matched to this application by location and may not be exhaustive; always confirm against the official source before relying on them.

Key dates

Timeline

  1. Application received26 March 2021
  2. Decision due20 May 2021
  3. Decision issued31 March 2021

In the area

Applications near this site

Other planning applications within about 500 m — what else is being proposed or built nearby.

Related developments

Similar applications

Ranked by what these developments actually propose, not by matching words — so you can see how comparable applications were decided.

Community

Discussion

What local people think about this application.

Nobody watching yet

Community sentiment

No votes yet

Nobody has voted on this application yet.

Community sentiment — a straw poll of people who visited this page, not a statutory submission. To make a valid observation you must submit it to the planning authority.

Sign in to have your say on this application.

No comments yet. Be the first to say what you think about this application.

Sign in to join the discussion on this application.

Comments are moderated and are the opinions of the people who wrote them. They form no part of the statutory planning process — to make a valid observation you must submit it to the planning authority.