Planning Permission Ireland
GrantedCommercialDecided 31 October 2024

7-13, Ormond Quay Upper, Dublin 7

Extension of duration for the demolition of a hotel and construction of a new hotel on Ormond Quay Upper.

2555/16/X3 · Dublin City Council · Lodged 5 September 2024

Reference
2555/16/X3
Authority
Dublin City Council
Register status
Decided
Received
5 September 2024

Summary

AI-generated

This application seeks an extension of duration for a development involving the demolition of the Ormond Hotel and rear structures of adjacent protected structures. It proposes the construction of a new part-four, part-five storey hotel with a basement and a change of use.

Commercialhotelprotected structuredemolitionextension of duration
Storeys
5

Generated from the description above by an AI model and may contain mistakes. The council’s description is the authoritative record.

Official record

Development description

Ext. Of duration protected structure:for development at a 0.1557 hectare site. The site is bounded to the south by ormond quay upper, to the north by strand street little, to west by no. 14 ormond quay upper and hamilton court and to the east by no. 6 ormond quay upper (a protected structure). The application site comprises of the ormond hotel at 7-11 and the adjoining buildings at no. 12 ormond quay upper (a protected structure) and no. 13 ormond quay upper. The proposed development comprises of the following: demolition of the existing hotel 7-11 ormond quay upper and the existing non original return structures to the rear of no's 12 and 13 ormond quay upper; the construction of a new part five storey and part four storey hotel on the site of the existing hotel and to the rear of no's 12 and 13 ormond quay upper. The proposed development includes a single storey basement to the front (south) of the site and setbacks at fifth storey level north and to the south. The new development comprises of 2 no. Parallel east-west blocks separated by a landscaped courtyard space with lift lobbies connecting the two blocks from ground to fifth storey; the change of use of no's 12 and 13 ormond quay upper from office use to hotel use; the refurbishment of no's 12 and 13 ormond quay upper, including the conservation of and internal alterations to joinery, conservation of plasterwork and the upgrading of the floors, walls and doors to meet structural and fire safety standards; the proposed development includes all associated and ancillary works, including green roof, bicycle parking (16 no. Space), esb substation and switch room to hamilton court and a service / loading area to the rear (north) with access from strand street little. The proposed hotel, comprising of the new development and no's 12 and 13 ormond quay upper, will comprise of 121 no. Bedrooms from ground to fourth floor. The basement will comprise of ancillary facilities such as kitchen, store, residents fitness centre, plant, management office, toilets and lockers. The ground floor will comprise of a reception / entrance area, bar (in no. 12 ormond quay upper), business centre (in no. 13 ormond quay upper), a restaurant, and bedrooms to the rear (north) . The overall gross floor area of the proposed development is 5,850 sq. M, comprising of 409 sq. M in no. 12 ormond quay upper, 278 in no. 13 ormond quay upper and 5,163 sq. M in the new build element.

Key dates

Timeline

  1. Application received5 September 2024
  2. Decision due31 October 2024
  3. Decision issued31 October 2024
  4. Permission expiry23 September 2027

Related developments

Similar applications

Ranked by what these developments actually propose, not by matching words — so you can see how comparable applications were decided.

Community

Discussion

What local people think about this application.

Nobody watching yet

Community sentiment

No votes yet

Nobody has voted on this application yet.

Community sentiment — a straw poll of people who visited this page, not a statutory submission. To make a valid observation you must submit it to the planning authority.

Sign in to have your say on this application.

No comments yet. Be the first to say what you think about this application.

Sign in to join the discussion on this application.

Comments are moderated and are the opinions of the people who wrote them. They form no part of the statutory planning process — to make a valid observation you must submit it to the planning authority.