Planning Permission Ireland
WithdrawnExtensionDecided 12 May 2021

18, Leeson Park, Dublin 6, D06 H7T2

Demolition of side structures and construction of a four-storey side extension at a protected Leeson Park home.

2557/21 · Dublin City Council · Lodged 9 April 2021

Reference
2557/21
Authority
Dublin City Council
Register status
Decided
Type
Permission
Received
9 April 2021

Summary

AI-generated

The project at this protected single-family dwelling involves removing a non-original side extension and garage roofs. A new four-storey/split-level infill extension will be constructed to the side, along with minor internal alterations and new French doors.

Extensionprotected structureextensiondemolition
Storeys
4
Floor area
102 m²

Generated from the description above by an AI model and may contain mistakes. The council’s description is the authoritative record.

Official record

Development description

Protected structure: planning permission for the following works at single family dwelling: a) removal of a non-original timber framed w. C. Extension to the side at about hall floor level and the non-original roofs of the garage and outhouse at garden level (total c. 42 sq. M); b) the construction of a new four-storey/ split level infill extension to the side (c. 102 sq. M), set back behind the building line of no. 17 leeson park; c) the alteration/ provision of openings in the side wall to provide access to the extension; d) minor alterations to include the removal of non-original bathrooms; e) the provision of a new opening and pair of french doors to the main rear room at garden level; f) associated drainage works.

Land-use zoning

What this land is zoned for

Z2: Residential Neighbourhoods (Conservation Areas)RS
To protect and/or improve the amenities of residential conservation areas.

National zoning type: Existing residential

Objective set by the Development Plan 2022-2028 (2022–2028). The planning authority decides each application on its own merits — this is the zoning context, not a compliance assessment.

Read the zoning objectives in the development plan

Built & sold

What happened next

Beyond the decision: whether this development was built, and what property here has sold for.

Recent sales nearby

within 500 m
Residential Property Price Register sales within 500 metres of this site
AddressDatePriceDistance
St Patricks Missionary Society, 21 Leeson Park, Dublin 6Apr 2025€6,000,00019 m
45 Northbrook Ave, Ranelagh, Dublin 6Oct 2025€1,087,00089 m
51 Northbrook Ave, Ranelagh, Dublin 6Dec 2025€1,025,000117 m
37 Fitzwilliam Court, Winton Rd, Dublin 6Aug 2025€415,000120 m
32 Fitzwilliam Court, Winton Rd, RanelaghJan 2025€415,000120 m
13 Fitzwilliam Court, Winton Rd, Ranelagh Dublin 6Apr 2025€410,000120 m
39 Fitzwilliam Court, Winton Rd, Dublin 6Mar 2025€373,500120 m
9a Fitzwilliam Court, Winton Rd, Ranelagh Dublin 6Dec 2025€610,000120 m

Nearby properties, not this site — a guide to local values.

Sources: Building Control Management System (commencement notices) and the Residential Property Price Register, licensed under CC BY 4.0. Records are matched to this application by location and may not be exhaustive; always confirm against the official source before relying on them.

Key dates

Timeline

  1. Application received9 April 2021
  2. Further information received5 May 2021
  3. Decision due3 June 2021
  4. Decision issued12 May 2021

In the area

Applications near this site

Other planning applications within about 500 m — what else is being proposed or built nearby.

Related developments

Similar applications

Ranked by what these developments actually propose, not by matching words — so you can see how comparable applications were decided.

Community

Discussion

What local people think about this application.

Nobody watching yet

Community sentiment

No votes yet

Nobody has voted on this application yet.

Community sentiment — a straw poll of people who visited this page, not a statutory submission. To make a valid observation you must submit it to the planning authority.

Sign in to have your say on this application.

No comments yet. Be the first to say what you think about this application.

Sign in to join the discussion on this application.

Comments are moderated and are the opinions of the people who wrote them. They form no part of the statutory planning process — to make a valid observation you must submit it to the planning authority.