Planning Permission Ireland
GrantedExtensionDecided 17 June 2021

7, Orwell Park, Dublin 6 D06 N8H2

Rear extensions, internal alterations, a new garden room, and widening of the driveway entrance.

2652/21 · Dublin City Council · Lodged 23 April 2021

Reference
2652/21
Authority
Dublin City Council
Register status
Decided
Type
Permission
Received
23 April 2021

Summary

AI-generated

The project involves removing an existing rear conservatory, chimney, and garden shed to construct a single-storey rear extension and extend the two-storey return above it. It also includes internal reconfiguration, a new garden room, and widening of the vehicular entrance.

Extensionextensionrenovationgarden room

Generated from the description above by an AI model and may contain mistakes. The council’s description is the authoritative record.

Official record

Development description

The development will consist of: a) the removal of the existing rear single conservatory extension, the removal of the existing chimney to the rear western gable and the removal of the existing garden shed. B) the construction of a single storey extension to the rear of the existing house with 2 no. Associated rooflights together with the extension of the existing two storey return above the proposed single storey extension. C) alterations to the rear north elevation with 2 no. Juliet balcony windows at first and second floor level respectively and alterations to the side west elevation with the addition of 5 no, windows and side entrance door. D) internal reconfiguration of the existing layout and alignments of floor level. E) the construction of a garden room with associated rooflight to the rear of the site and the construction of a garden shed. F) the widening of the vehicular entrance with new pillar and gates. G) all ancillary site and landscaping works.

Built & sold

What happened next

Beyond the decision: whether this development was built, and what property here has sold for.

Built — construction complete

A commencement notice records works starting on 6 January 2022. A completion certificate was lodged on 29 May 2023.

Notified floor area: 380

Recent sales nearby

within 500 m
Residential Property Price Register sales within 500 metres of this site
AddressDatePriceDistance
6 The Avenue, Marianella, RathgarJun 2026€1,850,00061 m
64 Orwell Park, Rathgar, Dublin 6Jun 2025€3,600,00077 m
Unit 56 Block A, Orwell Gate, MarianellaJun 2026€900,00085 m
3 The Mews, Orwell Gate, MarianellaApr 2026€1,455,00094 m
16 Orwell Place, Marianella, Orwell RoadAug 2025€725,000131 m
15 Orwell Bank, Orwell Park, Dublin 6not full market priceJan 2026€170,000143 m
5 Park View, Orwell Rd, RathgarJan 2026€731,000164 m
45 Orwell Hall, Block C, Marianella RathgarApr 2025€742,500170 m

Nearby properties, not this site — a guide to local values.

Sources: Building Control Management System (commencement notices) and the Residential Property Price Register, licensed under CC BY 4.0. Records are matched to this application by location and may not be exhaustive; always confirm against the official source before relying on them.

Key dates

Timeline

  1. Application received23 April 2021
  2. Decision due17 June 2021
  3. Decision issued17 June 2021
  4. Grant issued4 August 2021

Related developments

Similar applications

Ranked by what these developments actually propose, not by matching words — so you can see how comparable applications were decided.

Community

Discussion

What local people think about this application.

Nobody watching yet

Community sentiment

No votes yet

Nobody has voted on this application yet.

Community sentiment — a straw poll of people who visited this page, not a statutory submission. To make a valid observation you must submit it to the planning authority.

Sign in to have your say on this application.

No comments yet. Be the first to say what you think about this application.

Sign in to join the discussion on this application.

Comments are moderated and are the opinions of the people who wrote them. They form no part of the statutory planning process — to make a valid observation you must submit it to the planning authority.