Planning Permission Ireland
GrantedExtensionDecided 31 May 2018

93, Lindsay Road, Glasnevin, Dublin 9

Demolition of rear sheds and construction of a single-storey extension, attic conversion, and window upgrades.

2686/18 · Dublin City Council · Lodged 6 April 2018

Reference
2686/18
Authority
Dublin City Council
Register status
Decided
Type
Permission
Received
6 April 2018

Summary

AI-generated

The development consists of demolishing rear lean-to sheds to build a new single-storey kitchen extension. It also includes an attic conversion with a rear dormer, upgrading roof insulation, and replacing windows with timber conservation-style sash windows.

Extensionextensionattic conversiondemolition
Storey
1

Generated from the description above by an AI model and may contain mistakes. The council’s description is the authoritative record.

Official record

Development description

The development will consist of demolition of single storey rear lean-to sheds and construction of a new single storey kitchen extension to the rear, including internal alterations, conversion of the attic space to include a rear dormer and rooflight, and re-state/upgrade insulation to the existing roofs, replace aluminium windows with new timber conservation style sash windows to front and rear elevations, re-pointing damaged brickwork to match original and all associated site works, drainage and landscaping.

Land-use zoning

What this land is zoned for

Z2: Residential Neighbourhoods (Conservation Areas)RS
To protect and/or improve the amenities of residential conservation areas.

National zoning type: Existing residential

Objective set by the Development Plan 2022-2028 (2022–2028). The planning authority decides each application on its own merits — this is the zoning context, not a compliance assessment.

Read the zoning objectives in the development plan

Built & sold

What happened next

Beyond the decision: whether this development was built, and what property here has sold for.

Built — construction complete

A commencement notice records works starting on 6 August 2018.

Notified floor area: 135

Recent sales nearby

within 500 m
Residential Property Price Register sales within 500 metres of this site
AddressDatePriceDistance
104 Iona Road, Glasnevin, Dublin 9Oct 2025€1,150,00049 m
114 Lindsay Rd, Glasnevin, Dublin 9Feb 2025€1,065,00052 m
12 St Brendan's Road, Drumcondra, Dublin 9Jul 2025€530,00098 m
Apt 6, 18 Claude Rd, Drumcondra Dublin 9Aug 2025€470,000104 m
80 Iona Rd, Glasnevin, Dublin 9Jun 2025€1,150,000124 m
76 Iona Rd, Glasnevin, Dublin 9Feb 2025€1,440,000137 m
11 Claude Rd, Drumcondra, Dublin 9Jan 2025€800,000146 m
23 St Clements Rd, Drumcondra, Dublin 9Aug 2025€525,000152 m

Nearby properties, not this site — a guide to local values.

Sources: Building Control Management System (commencement notices) and the Residential Property Price Register, licensed under CC BY 4.0. Records are matched to this application by location and may not be exhaustive; always confirm against the official source before relying on them.

Key dates

Timeline

  1. Application received6 April 2018
  2. Decision due31 May 2018
  3. Decision issued31 May 2018
  4. Grant issued6 July 2018

In the area

Applications near this site

Other planning applications within about 500 m — what else is being proposed or built nearby.

Related developments

Similar applications

Ranked by what these developments actually propose, not by matching words — so you can see how comparable applications were decided.

Community

Discussion

What local people think about this application.

Nobody watching yet

Community sentiment

No votes yet

Nobody has voted on this application yet.

Community sentiment — a straw poll of people who visited this page, not a statutory submission. To make a valid observation you must submit it to the planning authority.

Sign in to have your say on this application.

No comments yet. Be the first to say what you think about this application.

Sign in to join the discussion on this application.

Comments are moderated and are the opinions of the people who wrote them. They form no part of the statutory planning process — to make a valid observation you must submit it to the planning authority.