Planning Permission Ireland
GrantedAlterationsDecided 10 July 2020

No. 74 Ardlea Road (D05 XY09) and site adjacent to No. 74A Ardlea Road, Artane, Dublin 5

Attic conversions and dormer windows for house types B and C at Ardlea Road.

2705/20 · Dublin City Council · Lodged 14 May 2020

Reference
2705/20
Authority
Dublin City Council
Register status
Appealed
Type
Permission
Received
14 May 2020

Summary

AI-generated

The proposed alterations consist of providing an en-suite bedroom at attic level for house types B and C. This includes installing a dormer window on the north-facing roof-slope and an additional Velux window on the south-facing roof-slope. The first-floor layout will also be reconfigured to accommodate the new stairs.

Alterationsattic conversiondormer

Generated from the description above by an AI model and may contain mistakes. The council’s description is the authoritative record.

Official record

Development description

The proposed alterations consist of: (i) provision of 1 no. En-suite bedroom at attic level of house types b and c; (ii) installation of a dormer window on the north facing roof-slope and an additional velux window (resulting in a total of 2 no. ) to the south facing roof-slope of house types b and c; (iii) reconfiguration of first floor layout of house types b and c to accommodate stairs to additional attic level bedroom; and (iv) all associated ancillary works necessary to facilitate the development.

Land-use zoning

What this land is zoned for

Z1: Sustainable Residential NeighbourhoodsRS
To protect, provide and improve residential amenities.

National zoning type: Existing residential

Objective set by the Development Plan 2022-2028 (2022–2028). The planning authority decides each application on its own merits — this is the zoning context, not a compliance assessment.

Read the zoning objectives in the development plan

Built & sold

What happened next

Beyond the decision: whether this development was built, and what property here has sold for.

Recent sales nearby

within 500 m
Residential Property Price Register sales within 500 metres of this site
AddressDatePriceDistance
72 Ardlea Road, Artane, Dublin 5Jun 2026€445,00023 m
64 Ardlea Rd, Artane, Dublin 5Apr 2025€525,00045 m
40 Maryfield Crescent, Artane, Dublin 5not full market priceMay 2025€100,00066 m
46 Ardcollum Ave, Artane, Dublin 5Sept 2025€435,00090 m
42 Ardcollum Avenue, Artane, Dublin 5Jan 2026€814,000106 m
8 Maryfield Crescent, Artane, Dublin 5Mar 2025€508,000119 m
28 Ardlea Road, Artane, Dublin 5Jul 2025€415,000131 m
46a Timber Mills, Kilmore Rd, Artane Dublin 5May 2025€370,000132 m

Nearby properties, not this site — a guide to local values.

Sources: Building Control Management System (commencement notices) and the Residential Property Price Register, licensed under CC BY 4.0. Records are matched to this application by location and may not be exhaustive; always confirm against the official source before relying on them.

Key dates

Timeline

  1. Application received14 May 2020
  2. Decision due17 July 2020
  3. Decision issued10 July 2020
  4. Grant issued28 October 2020
  5. Appeal submitted12 August 2020
  6. Appeal decided19 October 2020

In the area

Applications near this site

Other planning applications within about 500 m — what else is being proposed or built nearby.

Related developments

Similar applications

Ranked by what these developments actually propose, not by matching words — so you can see how comparable applications were decided.

Community

Discussion

What local people think about this application.

Nobody watching yet

Community sentiment

No votes yet

Nobody has voted on this application yet.

Community sentiment — a straw poll of people who visited this page, not a statutory submission. To make a valid observation you must submit it to the planning authority.

Sign in to have your say on this application.

No comments yet. Be the first to say what you think about this application.

Sign in to join the discussion on this application.

Comments are moderated and are the opinions of the people who wrote them. They form no part of the statutory planning process — to make a valid observation you must submit it to the planning authority.