Planning Permission Ireland
GrantedRetentionDecided 10 August 2021

44-53 Townsend Street, 33-39 Moss Street, 31-33 Gloucester Street South, and including Bracken's Lane, Dublin 2

Retention of amendments to a mixed-use development, including basement and floor area increases.

2976/21 · Dublin City Council · Lodged 16 June 2021

Reference
2976/21
Authority
Dublin City Council
Register status
Decided
Type
Retention Permission
Received
16 June 2021

Summary

AI-generated

Retention permission is sought for amendments to a permitted mixed-use development on a 0.4-hectare site. Changes include an 86 sqm basement expansion, minor upper-level floor area increases, internal layout reconfigurations, and external elevation and roof level revisions.

Retentionretentionmixed usebasement
Floor area
128 m²

Generated from the description above by an AI model and may contain mistakes. The council’s description is the authoritative record.

Official record

Development description

Retention: retention permission to amend a mixed use development permitted under abp ref. Pl 29s. 249415; dcc reg. Ref. 2711/17 (as amended by dcc reg. Refs. 3265/20 and 3995/20) located on a site of c. 0.4 hectares. The development to be retained consists of: an increase in basement floor area of 86 sqm; minor increases to internal floor areas at upper levels totalling 41.5 sqm; reconfiguration of internal layouts; amendments to external elevations including revised glazing and façade treatments and arrangements, a reduction in parapet height levels, revisions to the roof level including revised access, vent and plant arrangement, and all ancillary site development works above and below ground.

Land-use zoning

What this land is zoned for

Z5: City CentreUC
To consolidate and facilitate the development of the central area, and to identify, reinforce, strengthen and protect its civic design character and dignity.

National zoning type: City/Town/village Centre, central area

Objective set by the Development Plan 2022-2028 (2022–2028). The planning authority decides each application on its own merits — this is the zoning context, not a compliance assessment.

Read the zoning objectives in the development plan

Built & sold

What happened next

Beyond the decision: whether this development was built, and what property here has sold for.

Recent sales nearby

within 500 m
Residential Property Price Register sales within 500 metres of this site
AddressDatePriceDistance
62 Hyde Court, Townsend St, Dublin 2Feb 2025€477,00076 m
65 Hyde Court, Townsend Street, Dublin 2Nov 2025€370,00076 m
57 Hyde Court, Townsend St, Dublin 2Jun 2026€585,00076 m
59 Hyde Court, Townsend St, Dublin 2Jul 2026€655,00076 m
43 Hyde Court, Townsend St, Dublin 2Nov 2025€520,00076 m
Apt 38, Hyde Court, Townsend St Dublin 2May 2025€546,00076 m
5 Petersons Court, City Quay, Dublin 2Mar 2025€587,000193 m
33 Trinity Plaza, Tara St, Dublin 2Jul 2025€250,000224 m

Nearby properties, not this site — a guide to local values.

Sources: Building Control Management System (commencement notices) and the Residential Property Price Register, licensed under CC BY 4.0. Records are matched to this application by location and may not be exhaustive; always confirm against the official source before relying on them.

Key dates

Timeline

  1. Application received16 June 2021
  2. Decision due10 August 2021
  3. Decision issued10 August 2021
  4. Grant issued23 September 2021

In the area

Applications near this site

Other planning applications within about 500 m — what else is being proposed or built nearby.

Related developments

Similar applications

Ranked by what these developments actually propose, not by matching words — so you can see how comparable applications were decided.

Community

Discussion

What local people think about this application.

Nobody watching yet

Community sentiment

No votes yet

Nobody has voted on this application yet.

Community sentiment — a straw poll of people who visited this page, not a statutory submission. To make a valid observation you must submit it to the planning authority.

Sign in to have your say on this application.

No comments yet. Be the first to say what you think about this application.

Sign in to join the discussion on this application.

Comments are moderated and are the opinions of the people who wrote them. They form no part of the statutory planning process — to make a valid observation you must submit it to the planning authority.