Planning Permission Ireland
Awaiting decisionAlterationsDecided 5 September 2025

47 Middle Abbey Street, Dublin 1, D01HR23

Retention and refurbishment of a building on Middle Abbey Street to facilitate fire safety certification.

3016/25 · Dublin City Council · Lodged 15 January 2025

Reference
3016/25
Authority
Dublin City Council
Register status
Decided
Type
Permission
Received
15 January 2025

Summary

AI-generated

The application seeks retention of repointing on the front facade, two automatic smoke vents, and two roof windows. It also requests permission to renovate the building, including a ground floor lobby, relocating the backyard boiler, and installing vents in the back facade.

Alterationsrefurbishmentfire safetycity centre

Generated from the description above by an AI model and may contain mistakes. The council’s description is the authoritative record.

Official record

Development description

Protected structure : retention and permission : (1) retention permission of the repointing of the front facade , positioning of two velux style automatic opening smoke vents and two other roof windows (to allow roof access) . (2) planning permission to renovate and refurbish the same building and facilitate fire safety certification . Proposed changes to to previous planning application (ref. No. 2010/16) include ground floor lobby , changing position of boiler in backyard , changes to facilitate pressured stairwell including vents in the back facade .

Land-use zoning

What this land is zoned for

Z5: City CentreUC
To consolidate and facilitate the development of the central area, and to identify, reinforce, strengthen and protect its civic design character and dignity.

National zoning type: City/Town/village Centre, central area

Objective set by the Development Plan 2022-2028 (2022–2028). The planning authority decides each application on its own merits — this is the zoning context, not a compliance assessment.

Read the zoning objectives in the development plan

Built & sold

What happened next

Beyond the decision: whether this development was built, and what property here has sold for.

Recent sales nearby

within 500 m
Residential Property Price Register sales within 500 metres of this site
AddressDatePriceDistance
213 Bachelors Walk, Dublin 1, DublinApr 2025€262,00063 m
Apt 215 Bachelors Walk, Norths Lotts, Dublin 1Jul 2026€257,00063 m
219 Bachelors Walk Apts, Dublin 1Oct 2025€254,00064 m
303 The Lotts, Bachelors Walk, Dublin 1Dec 2025€250,00070 m
265 Bachelors Walk, Dublin 1, DublinMar 2025€305,00071 m
198 Bachelors Walk, Dublin 1, DublinMar 2026€260,00086 m
Apt 307, Bachelors Walk, Dublin 1Mar 2026€293,50086 m
201 Bachelors Walk Apts, Liffey St Lower, Dublin 1Jul 2026€400,00086 m

Nearby properties, not this site — a guide to local values.

Sources: Building Control Management System (commencement notices) and the Residential Property Price Register, licensed under CC BY 4.0. Records are matched to this application by location and may not be exhaustive; always confirm against the official source before relying on them.

Key dates

Timeline

  1. Application received15 January 2025
  2. Decision due11 March 2025
  3. Decision issued5 September 2025

In the area

Applications near this site

Other planning applications within about 500 m — what else is being proposed or built nearby.

Related developments

Similar applications

Ranked by what these developments actually propose, not by matching words — so you can see how comparable applications were decided.

Community

Discussion

What local people think about this application.

Nobody watching yet

Community sentiment

No votes yet

Nobody has voted on this application yet.

Community sentiment — a straw poll of people who visited this page, not a statutory submission. To make a valid observation you must submit it to the planning authority.

Sign in to have your say on this application.

No comments yet. Be the first to say what you think about this application.

Sign in to join the discussion on this application.

Comments are moderated and are the opinions of the people who wrote them. They form no part of the statutory planning process — to make a valid observation you must submit it to the planning authority.