Planning Permission Ireland
GrantedExtensionDecided 13 March 2025

11, Saint Brigid's Crescent, Dublin 5

Retention of a single-storey extension and permission for a first-floor extension and wider driveway.

3021/25 · Dublin City Council · Lodged 17 January 2025

Reference
3021/25
Authority
Dublin City Council
Register status
Appealed
Type
Permission
Received
17 January 2025

Summary

AI-generated

The application seeks retention for an existing single-storey extension to the front, side, and rear. It also seeks permission to change its pitched roof to a flat roof, build a first-floor extension above it, and widen the vehicular access.

Extensionretentionfirst floor extensiondriveway

Generated from the description above by an AI model and may contain mistakes. The council’s description is the authoritative record.

Official record

Development description

  • Retention and permission : retention permission for the construction of a single storey extension to the front / side / rear of the existing dwelling
  • Planning permission to change the existing pitched roof over the single storey extension to the front side / rear to a flat roof
  • Planning permission for the construction of a first floor extension on top of the existing garage / single storey extension to the front / side / rear
  • Planning permission to widen an existing vehicular access exiting onto saint brigid's crescent, dublin 5, with all associated site works, all at 11 saint brigid's crescent, dublin 5

Land-use zoning

What this land is zoned for

Z1: Sustainable Residential NeighbourhoodsRS
To protect, provide and improve residential amenities.

National zoning type: Existing residential

Objective set by the Development Plan 2022-2028 (2022–2028). The planning authority decides each application on its own merits — this is the zoning context, not a compliance assessment.

Read the zoning objectives in the development plan

Built & sold

What happened next

Beyond the decision: whether this development was built, and what property here has sold for.

Recent sales nearby

within 500 m
Residential Property Price Register sales within 500 metres of this site
AddressDatePriceDistance
33 Brookwood Dr, Artane, Dublin 5Jul 2026€730,00081 m
16 Brookwood Dr, Artane, Dublin 5Mar 2025€655,000103 m
3 Brookwood Road, Artane, Dublin 5Aug 2025€499,000138 m
13 Brookwood Ave, Artane, Dublin 5May 2026€805,000140 m
22 St Brigids Rd, Artane, Dublin 5Oct 2025€732,000142 m
19 Brookwood Rd, Artane, Dublin 5Aug 2025€730,000149 m
3 Daniely Drive, Artane, Dublin 5Oct 2025€645,000180 m
37 Brookwood Ave, Artane, Dublin 5Jun 2025€855,000187 m

Nearby properties, not this site — a guide to local values.

Sources: Building Control Management System (commencement notices) and the Residential Property Price Register, licensed under CC BY 4.0. Records are matched to this application by location and may not be exhaustive; always confirm against the official source before relying on them.

Key dates

Timeline

  1. Application received17 January 2025
  2. Decision due13 March 2025
  3. Decision issued13 March 2025
  4. Appeal submitted8 April 2025
  5. Appeal decided24 July 2025
  6. Permission expiry6 September 2030

In the area

Applications near this site

Other planning applications within about 500 m — what else is being proposed or built nearby.

Related developments

Similar applications

Ranked by what these developments actually propose, not by matching words — so you can see how comparable applications were decided.

Community

Discussion

What local people think about this application.

Nobody watching yet

Community sentiment

No votes yet

Nobody has voted on this application yet.

Community sentiment — a straw poll of people who visited this page, not a statutory submission. To make a valid observation you must submit it to the planning authority.

Sign in to have your say on this application.

No comments yet. Be the first to say what you think about this application.

Sign in to join the discussion on this application.

Comments are moderated and are the opinions of the people who wrote them. They form no part of the statutory planning process — to make a valid observation you must submit it to the planning authority.