Planning Permission Ireland
GrantedChange of useDecided 17 January 2020

2-3, Mary's Abbey, Dublin 7, D07 X6R6

Conversion of a protected structure into a museum and construction of a new two-storey museum building to the rear.

3069/19 · Dublin City Council · Lodged 23 May 2019

Reference
3069/19
Authority
Dublin City Council
Register status
Decided
Type
Permission
Received
23 May 2019

Summary

AI-generated

The project involves converting 2-3 Mary's Abbey from artist studios, a shop, and storage into a museum. It includes demolishing non-protected rear structures to build a new two-storey building for the National Leprechaun Museum.

Change of usemuseumprotected structuredemolitiontourism
Storeys
2

Generated from the description above by an AI model and may contain mistakes. The council’s description is the authoritative record.

Official record

Development description

  • Protected structure: the proposed development will comprise the conservation, repair and adaption of the protected structure at 2-3 mary's abbey, dublin 7 to facilitate a change of use from artist studios at first, second and third floors, shop at ground floor and storage at basement level of the protected structure to museum and ancillary use at ground first second and third floors and storage at basement level of the protected structure and the demolition of existing structures to the rear of the protected structure to allow the development of new ancillary museum building on lands to the rear of the protected structure as follows
  • Buildings to the rear of the site which are not protected structures are to be demolished, all boundary party walls to be maintained
  • The construction of a new building on lands to the rear of the existing protected structure as the new premises of the national leprechaun museum, two storeys in height to an overall height of 13.5m (exclusive of roof mounted pv panels), landscaping works to internal courtyard lightwell. Roof to new building at rear to be a combination of flat semi intensive green roof with pv panels and a pitched reflective insulated metal deck roof with brick slip cladding to external perimeter walls and roof top plant with louvered enclosure
  • Structural intervention works to stabilise the building fabric of the protected structure
  • Alterations to rear facade of protected structure at ground, first and second floors to facilitate new escape and access stairs to facilitate access from garden, to repair and reinstate original windows, to dismantle and re-build destabilised segment of wall at top floor level, reinstatement of cast iron rain water goods
  • Repairs to the roof, gutters, rear eaves and front parapet of the protected structure
  • Works to the front facade of the protected structure at all levels comprising brick, stone, render and jointing cleaning and repair, removal of existing modern shopfront and installation of new shopfront and external articulated shutters, repairs to all existing metal framed windows above ground level, dismantling and re-building destabilised segment of parapet at top floor level. 7 removal of modern interventions to the interior of the protected structure including partitions, stud walling, false ceilings and modern stairs and installation of new partitions, doors and lift shaft to facilitate proposed new museum use

Land-use zoning

What this land is zoned for

Z5: City CentreUC
To consolidate and facilitate the development of the central area, and to identify, reinforce, strengthen and protect its civic design character and dignity.

National zoning type: City/Town/village Centre, central area

Objective set by the Development Plan 2022-2028 (2022–2028). The planning authority decides each application on its own merits — this is the zoning context, not a compliance assessment.

Read the zoning objectives in the development plan

Built & sold

What happened next

Beyond the decision: whether this development was built, and what property here has sold for.

Built — construction complete

A commencement notice records works starting on 4 August 2023.

Notified floor area: 211

Recent sales nearby

within 500 m
Residential Property Price Register sales within 500 metres of this site
AddressDatePriceDistance
8 Jervis Place, Abbey St Upper, Dublin 1May 2026€285,00095 m
Apt 51 - Jervis Place, Upper Abbey Street, Dublin 1Apr 2026€310,00095 m
134 Jervis Place, Capel St, Dublin 7Jun 2026€200,000114 m
136 Jervis Place, Jervis St, DublinDec 2025€240,000114 m
132 Jervis Place, Jervis St, Dublin 1Aug 2025€257,000114 m
133 Jervis Place, Jervis St, Dublin 1Dec 2025€290,000114 m
2 Mary Street, Dublin 1Jun 2025€450,000115 m
17 Strand Street Little, Smithfield, Dublin 7Apr 2025€636,000116 m

Nearby properties, not this site — a guide to local values.

Sources: Building Control Management System (commencement notices) and the Residential Property Price Register, licensed under CC BY 4.0. Records are matched to this application by location and may not be exhaustive; always confirm against the official source before relying on them.

Key dates

Timeline

  1. Application received23 May 2019
  2. Further information requested17 July 2019
  3. Further information received12 December 2019
  4. Decision due17 January 2020
  5. Decision issued17 January 2020
  6. Grant issued27 February 2020

In the area

Applications near this site

Other planning applications within about 500 m — what else is being proposed or built nearby.

Related developments

Similar applications

Ranked by what these developments actually propose, not by matching words — so you can see how comparable applications were decided.

Community

Discussion

What local people think about this application.

Nobody watching yet

Community sentiment

No votes yet

Nobody has voted on this application yet.

Community sentiment — a straw poll of people who visited this page, not a statutory submission. To make a valid observation you must submit it to the planning authority.

Sign in to have your say on this application.

No comments yet. Be the first to say what you think about this application.

Sign in to join the discussion on this application.

Comments are moderated and are the opinions of the people who wrote them. They form no part of the statutory planning process — to make a valid observation you must submit it to the planning authority.