Planning Permission Ireland
GrantedAlterationsDecided 31 August 2021

Saint Patrick's Cathedral, Saint Patrick's Close, Dublin 8

Temporary installation of external pre-fabricated toilets at Saint Patrick's Cathedral.

3110/21 · Dublin City Council · Lodged 7 July 2021

Reference
3110/21
Authority
Dublin City Council
Register status
Decided
Type
Permission
Received
7 July 2021

Summary

AI-generated

Planning permission is sought for a 5-year consent to install temporary external pre-fabricated toilet facilities at lower ground level. The works will take place at Saint Patrick's Cathedral, which is a Protected Structure, and will include service connections and limited access railings.

Alterationsprotected structuretemporarycathedral

Generated from the description above by an AI model and may contain mistakes. The council’s description is the authoritative record.

Official record

Development description

Protected structure: permission for a 5 year consent to install temporary external lavatory accommodation within a pre-fabricated unit sited at lower ground level between patrick street and minot tower together with the provision of service connections to existing supplies. Access will be from existing doors and limited around the north side of the cathedral by a metal railing and gates between the north transept and st patrick's park railings. The cathedral is a protected structure under the local government (planning and development) act 1999.

Land-use zoning

What this land is zoned for

Z8: Georgian Conservation Areas
To protect the existing architectural and civic design character, and to allow only for limited expansion consistent with the conservation objective.

National zoning type: General

Objective set by the Development Plan 2022-2028 (2022–2028). The planning authority decides each application on its own merits — this is the zoning context, not a compliance assessment.

Read the zoning objectives in the development plan

Built & sold

What happened next

Beyond the decision: whether this development was built, and what property here has sold for.

Recent sales nearby

within 500 m
Residential Property Price Register sales within 500 metres of this site
AddressDatePriceDistance
23 Cannon Court, Bride Street, Dublin 8Nov 2025€220,00090 m
Apt 46, Canon Court, Bride St Dublin 8May 2025€366,00090 m
33 Canon Court, Bride St, Christchurch Dublin 8Jun 2026€357,00090 m
Apt 19, Cannon Court, Bride St Dublin 8Apr 2025€350,00090 m
9 Lindsay House, Patrick St, Dublin 8Jan 2026€345,000101 m
34 Lindsay House, Patrick St, Dublin 8Mar 2026€295,000101 m
Apt 5, Rochfort House, Dean Court Dublin 8Aug 2025€321,000104 m
Apt 22, Rochfort House, Dean Court Dublin 8May 2026€315,000104 m

Nearby properties, not this site — a guide to local values.

Sources: Building Control Management System (commencement notices) and the Residential Property Price Register, licensed under CC BY 4.0. Records are matched to this application by location and may not be exhaustive; always confirm against the official source before relying on them.

Key dates

Timeline

  1. Application received7 July 2021
  2. Decision due31 August 2021
  3. Decision issued31 August 2021
  4. Grant issued13 October 2021

In the area

Applications near this site

Other planning applications within about 500 m — what else is being proposed or built nearby.

Related developments

Similar applications

Ranked by what these developments actually propose, not by matching words — so you can see how comparable applications were decided.

Community

Discussion

What local people think about this application.

Nobody watching yet

Community sentiment

No votes yet

Nobody has voted on this application yet.

Community sentiment — a straw poll of people who visited this page, not a statutory submission. To make a valid observation you must submit it to the planning authority.

Sign in to have your say on this application.

No comments yet. Be the first to say what you think about this application.

Sign in to join the discussion on this application.

Comments are moderated and are the opinions of the people who wrote them. They form no part of the statutory planning process — to make a valid observation you must submit it to the planning authority.