Planning Permission Ireland
GrantedApartmentsDecided 29 October 2021

9-11 Wellington Street Lower, Dublin 7

Demolition of a warehouse to build a new four-storey building containing 21 apartments.

3167/21 · Dublin City Council · Lodged 15 July 2021

Reference
3167/21
Authority
Dublin City Council
Register status
Decided
Type
Permission
Received
15 July 2021
Residential units
21

Summary

AI-generated

The development will consist of the demolition of an existing warehouse structure and the construction of a new building from ground to third floor. It will contain 21 apartments (15 one-bed and 6 two-bed units) with balconies, a landscaped courtyard, and bicycle storage.

Apartmentsapartmentsdemolitionurban development
Storeys
4

Generated from the description above by an AI model and may contain mistakes. The council’s description is the authoritative record.

Official record

Development description

Planning permission for the development will consist of the demolition of the existing warehouse struture and construction of a new building consisting of 21 no. Apartments comprising of 15 no. 1 bed apartments. 6 no. 2 bed apartments across ground to third floors all associated private open spaces areas in the form of balconies and winter gardens with access to the development from graham's row. All with associated landscaped courtyard at ground floor level, sedum roof (main roof), bicycle storage, commons / mechanical plant room, bin storage signage, associated drainage and site development works.

Land-use zoning

What this land is zoned for

Z1: Sustainable Residential NeighbourhoodsRS
To protect, provide and improve residential amenities.

National zoning type: Existing residential

Objective set by the Development Plan 2022-2028 (2022–2028). The planning authority decides each application on its own merits — this is the zoning context, not a compliance assessment.

Read the zoning objectives in the development plan

Built & sold

What happened next

Beyond the decision: whether this development was built, and what property here has sold for.

Built — construction complete

A commencement notice records works starting on 12 October 2022. A completion certificate was lodged on 25 April 2024.

Notified floor area: 304

3 commencement notices are linked to this development.

Recent sales nearby

within 500 m
Residential Property Price Register sales within 500 metres of this site
AddressDatePriceDistance
Apt 9, Sackville Court, Blessington St Dublin 7Jan 2025€235,00051 m
Apt 21 Sachville Court, Blessington St, Dublin 7Oct 2025€240,00051 m
Apartment 4, Sackville Court, Blessington StreetApr 2025€235,00051 m
13 Sackville Court, Blessington St, Dublin 1Jan 2025€233,00051 m
20 Sackville Court, Blessington Street, Dublin 1Apr 2025€225,00051 m
7 Blessington Court, Dublin 7Oct 2025€500,00081 m
Apt 1, 21 Blessington St, Dublin 7Sept 2025€830,00086 m
Apartment 1 41 Dorset St Upper, Dorset St, Dublin 1Nov 2025€890,000103 m

Nearby properties, not this site — a guide to local values.

Sources: Building Control Management System (commencement notices) and the Residential Property Price Register, licensed under CC BY 4.0. Records are matched to this application by location and may not be exhaustive; always confirm against the official source before relying on them.

Key dates

Timeline

  1. Application received15 July 2021
  2. Further information requested8 September 2021
  3. Further information received4 October 2021
  4. Decision due29 October 2021
  5. Decision issued29 October 2021
  6. Grant issued10 December 2021

In the area

Applications near this site

Other planning applications within about 500 m — what else is being proposed or built nearby.

Related developments

Similar applications

Ranked by what these developments actually propose, not by matching words — so you can see how comparable applications were decided.

Community

Discussion

What local people think about this application.

Nobody watching yet

Community sentiment

No votes yet

Nobody has voted on this application yet.

Community sentiment — a straw poll of people who visited this page, not a statutory submission. To make a valid observation you must submit it to the planning authority.

Sign in to have your say on this application.

No comments yet. Be the first to say what you think about this application.

Sign in to join the discussion on this application.

Comments are moderated and are the opinions of the people who wrote them. They form no part of the statutory planning process — to make a valid observation you must submit it to the planning authority.