The chq Building (formerly 'Stack A', a Protected Structure, RPS No. 2094), Custom House Quay, Dublin 1
Alterations and change of use at the CHQ Building to facilitate a licensed food market, exhibition, and event space.
3251/23 · Dublin City Council · Lodged 22 February 2023
- Reference
- 3251/23
- Authority
- Dublin City Council
- Register status
- Decided
- Type
- Permission
- Received
- 22 February 2023
Summary
AI-generatedThe proposals comprise alterations to the protected CHQ Building, including a change of use of existing retail, restaurant, storage, and office space to a licensed food market, exhibition, and event space. The works also include the partial demolition of existing service buildings and the provision of 2,952 sqm of new floor area.
- Floor area
- 2,952 m²
Generated from the description above by an AI model and may contain mistakes. The council’s description is the authoritative record.
Official record
Development description
- Protected structure: permission: the proposals comprise alterations of the chq building including change of use of existing floor space to facilitate a licenced food market at ground floor level (part), exhibition and event space (including dining, licenced restaurant) at mezzanine level (part) and the partial demolition of existing service buildings and provision of an extended services building. The development will consist of the partial demolition of 2 no. Service buildings (external walls retained) and the provision of c. 2,952 sqm new floor area as follows: at basement (c. 246 sqm), ground floor (c. 134 sqm), mezzanine level (c. 691 sqm) and service building (c. 1,881 sqm); change of use of c. 4,829 sqm of existing retail/restaurant/storage units/office to food market at basement level (c. 28 sqm) and ground floor level (c. 2,094 sqm) and exhibition / event space (including dining and licenced restaurant use) at mezzanine level (c. 2,707sqm). Food and alcohol will be served within the food hall, galleria and outside area and the following works to the chq building
- West-elevation - new central entrance & stair & lift access from george's dock including change of use of unit c1 (retail) and units 20 and 21 (restaurant) to food market use and circulation. The restoration of lost granite arched entrance and the provision of cast-iron doors and frame in its original location in the west elevation
- South-elevation custom house quay - removal of modern restrictive revolving door and flight of steps and replacement with wider sliding doors and wider flight of steps to provide better access to and from chq building
- South mall area
- (ground floor level) - change of use of existing chq units 1a
- 11b, 13-15 & 18-19 from retail /restaurant to food market (providing 30 market units in total) and ancillary uses (cloakroom / locker area to rear of units 18 & 19)
- South-east mezzanine level (currently vacant/storage) exhibition/event space (including dining) and pre-event space 01 with feature stairs and lift access from galleria; lowering of mezzanine by c. 300 mm
- Extended existing unit 1a (c. 49 sqm) to provide additional mezzanine floor area for winter garden at existing dogpatch labs, startup hub and shared office space
- Extension of existing unit 2 (c. 39 sqm) to provide additional mezzanine floor area for circulation to new exhibition event space
- North-west mezzanine - change of use from currently vacant/storage use to exhibition/event space and improved fire escape stairs (amendments to unit 31 at ground floor level)
- South-west mezzanine - change of use from currently vacant/storage use to exhibition/event space including pre-event space 02 with pop up unit, keg room & restroom provision, with feature stairs accessed from market entrance
- Provision of two no. Internal bridges / viewing platforms to connect east & west mezzanine levels
- Partial demolition (external walls retained) and extension to two no. Existing service buildings at eastern elevation to provide a 5-storey mixed-use building over extended basement (total floor area c. 3,717 sqm including basement), (with enclosed roof level above behind brick parapet wall and (part) covered with green roof), to provide back of house facilities including staff, office and event service use and bicycle parking (44 spaces) (at ground to second floor levels) & office space (at third and fourth floor levels) and installation of fall-arrest system and plant at roof level. Building to have pedestrian access from george's dock to the north and vehicular access to loading bays at car park at eastern elevation via exchange place
- Provision of 30 no. New openable glazed rooflights to the inner slopes of the chq roof and removal of forty-six existing glazed rooflights and replacement with openable glazed roof lights (aovs) to match existing. Removal of fifty-six small panes of glass in cast-iron lanterns lights and replacement with metal grills and installation of fall-arrest system
- Provision of designated outdoor seating for food market at george's dock adjacent to west elevation
- Extended floor area (c. 246 sqm) at basement/vault level (east) for required additional fire escape access, fridge room, keg room, workshop and improved services and change of use from office space to museum restroom at basement level (west)
- Provision of thirteen signage elements on east elevation, west elevation, and southeast mezzanine totalling c. 25.65 sqm. Signage
- Central entrance (3 x 0.93 sqm each); signage
- Market entrance (2 x 0.93 sqm each); signage
- Irish food market (4 x 2.13 sqm each); signage
- Epic chq gala banquet (4) x 3.12 sqm each)
- Completion of repairs and renovation of historic and modern fabric as detailed in the conservation methodology statement in compliance with conservation best practice, including restoration of 3 no segmental granite arches at ground floor level in the east elevation and openings in the historic fabric of the east wall including 3 no door openings and a servery opening, to provide access to the services building of the protected structure
- All associated site works and provision of 18 no. Bicycle parking spaces at the northwest elevation. A natura impact statement has been prepared in respect of the planning application
Land-use zoning
What this land is zoned for
“To consolidate and facilitate the development of the central area, and to identify, reinforce, strengthen and protect its civic design character and dignity.”
National zoning type: City/Town/village Centre, central area
Objective set by the Development Plan 2022-2028 (2022–2028). The planning authority decides each application on its own merits — this is the zoning context, not a compliance assessment.
Read the zoning objectives in the development planBuilt & sold
What happened next
Beyond the decision: whether this development was built, and what property here has sold for.
Recent sales nearby
within 500 m| Address | Date | Price | Distance |
|---|---|---|---|
| Apt 19 Block A, Mayor St, Custom House Sq | May 2025 | €395,000 | 182 m |
| 21 Malton House, Custom House Sq, Mayor St Lower Dublin 1 | Jun 2026 | €419,000 | 182 m |
| 273 Custom House Harbour, Custom House Quay, Dublin 1 | Apr 2026 | €675,000 | 188 m |
| 198 Tuskar Rock, Custom House Harbour, I F S C Dublin 1 | Dec 2025 | €366,666 | 193 m |
| 189 Custom House Harbour, Ifsc, Dublin 1 | Apr 2025 | €315,000 | 197 m |
| 279 Custom House Harbour, Ifsc, Dublin 1 | Apr 2026 | €405,000 | 197 m |
| Apt 315, Argylle, Custom House Harbour Dublin 1 | Sept 2025 | €412,000 | 197 m |
| Apt 4 Block 12, Mayor St, I F S C Dublin 1 | Mar 2025 | €285,000 | 204 m |
Nearby properties, not this site — a guide to local values.
Sources: Building Control Management System (commencement notices) and the Residential Property Price Register, licensed under CC BY 4.0. Records are matched to this application by location and may not be exhaustive; always confirm against the official source before relying on them.
Key dates
Timeline
- Application received22 February 2023
- Decision due19 January 2024
- Decision issued19 January 2024
- Permission expiry13 April 2029
In the area
Applications near this site
Other planning applications within about 500 m — what else is being proposed or built nearby.
- GrantedAt this site
PROTECTED STRUCTURE (RPS. 2094) / RETENTION : there are no works proposed to the protected structure. The…
The CHQ Building, North Wall Quay, Dublin 1
4888/23Dublin CityLodged 30 Nov 2023Retention
- GrantedAt this site
The works are located at the southern end of The chq Building within the EPIC Irish Emigration Museum at…
The Chq Building, (formerly Stack A), Custom House Quay, Dublin 1
WEB1735/25Dublin CityLodged 4 Apr 2025Alterations
- GrantedAt this site
RETENTION: PROTECTED STRUCTURE: The CHQ Building is a registered protected structure (RPS No. 2094) The…
The CHQ Building, North Wall Quay, Dublin 1
4636/18Dublin CityLodged 17 Dec 2018Retention
- GrantedAt this site
PROTECTED STRUCTURE: Planning permission for development at the eastern mezzanine level of Unit 1, the CHQ…
The CHQ Building, George's Dock, Dublin 1
3499/18Dublin CityLodged 13 Jul 2018Alterations
- InvalidAt this site
PROTECTED STRUCTURE: Planning permission for development at the western mezzanine level of Unit 1, the CHQ…
The CHQ Building, George's Dock, Dublin 1
3282/19Dublin CityLodged 17 Jun 2019Change of use
- GrantedAt this site
PROTECTED STRUCTURE: Planning permission for development at the western mezzanine level of the CHQ Building,…
The CHQ Building, George's Dock, Dublin 1
3500/19Dublin CityLodged 16 Jul 2019Change of use
- InvalidAt this site
PROTECTED STRUCTURE: Planning permission for development at the western mezzanine level of the CHQ Building,…
The CHQ Building, George's Dock, Dublin 1, D01 R9Y0
3409/19Dublin CityLodged 3 Jul 2019Change of use
- Exempt — no permission neededAt this site
EXPP: PROTECTED STRUCTURE: It is proosed to — To remove 2 no. limestone blocks temporarily from the cross…
CHQ Building 1, Custom House Quay, Dublin 1
0181/25Dublin CityLodged 5 May 2025Alterations
Related developments
Similar applications
Ranked by what these developments actually propose, not by matching words — so you can see how comparable applications were decided.
- GrantedCommercial
PROTECTED STRUCTURE: Planning Permission for amendments to a previously permitted planning permission, Reg.…
Site at the junction of North Wall Quay, and New Wapping Street, Spencer Dock Dublin 1, The site is bound to the north by Mayor Street Upper, to the east by New Wapping Street, to the south by North Wall Quay, and to the west by an unnamed street.
DSDZ4184/18Dublin CityLodged 16 Oct 2018
- InvalidChange of use
PROTECTED STRUCTURE: Planning permission for development at the western mezzanine level of the CHQ Building,…
The CHQ Building, George's Dock, Dublin 1, D01 R9Y0
3409/19Dublin CityLodged 3 Jul 2019
- GrantedCommercial
PROTECTED STRUCTURE: The development consists of: the internal upgrade, refurbishment and reconfiguration of…
30-32, Sir John Rogersons Quay, Dublin 2
DSDZ2584/18Dublin CityLodged 16 Mar 2018
- RefusedCommercial
PROTECTED STRUCTURE: The site is bound to the north by Mayor Street Upper, to the east by New Wapping Street,…
Site at the junction of North Wall Quay, and New Wapping Street, Spencer Dock Dublin 1, The site is bound to the north by Mayor Street Upper, to the east by New Wapping Street, to the south by North Wall Quay, and to the west by an unnamed St.
DSDZ2265/20Dublin CityLodged 13 Feb 2020
- RefusedChange of use
PROTECTED STRUCTURE: The development will consist of the following — Alterations to 48/49 Wellington Quay…
48/49 Wellington Quay,, Dublin 2.
2547/18Dublin CityLodged 21 Mar 2018
- GrantedCommercial
PROTECTED STRUCTURE: Development at a site (2.86 hectares) at the rear of Connolly Station, Sheriff Street…
Site at the rear of Connolly Station, Sheriff Street Lower, Dublin 1, D01 V6V6
5501/22Dublin CityLodged 21 Dec 2022
Community
Discussion
What local people think about this application.
Community sentiment
No votes yetNobody has voted on this application yet.
Community sentiment — a straw poll of people who visited this page, not a statutory submission. To make a valid observation you must submit it to the planning authority.
Sign in to have your say on this application.
No comments yet. Be the first to say what you think about this application.
Sign in to join the discussion on this application.
Comments are moderated and are the opinions of the people who wrote them. They form no part of the statutory planning process — to make a valid observation you must submit it to the planning authority.