Planning Permission Ireland
GrantedAlterationsDecided 18 April 2023

20 Exchequer Street, Dublin 2, D02 Y295

Reinstatement of historic shopfront elements and door relocation at a protected structure on Exchequer Street.

3252/23 · Dublin City Council · Lodged 22 February 2023

Reference
3252/23
Authority
Dublin City Council
Register status
Decided
Type
Permission
Received
22 February 2023

Summary

AI-generated

The development consists of removing the current Exchequer Street and Drury Street shopfronts to reinstate surviving historic elements of the original shopfront. The works include relocating the door to the corner elevation and incorporating historic brick, terracotta, or timber elements.

Alterationsshopfrontheritageprotected structure

Generated from the description above by an AI model and may contain mistakes. The council’s description is the authoritative record.

Official record

Development description

Protected structure: (ref: 2725). The development will consist of the removal of the current exchequer street and drury street shopfronts as per the planning drawings to reinstate the surviving historic elements of the original shopfront with the new shopfront including the relocation of the door to the corner elevation. The proposed shopfront will incorporate surviving elements of the historic brick/terracotta or timber elements of the shopfront which should be faithfully accurate to the original features including new advertisement signage and all associated works.

Land-use zoning

What this land is zoned for

Z5: City CentreUC
To consolidate and facilitate the development of the central area, and to identify, reinforce, strengthen and protect its civic design character and dignity.

National zoning type: City/Town/village Centre, central area

Objective set by the Development Plan 2022-2028 (2022–2028). The planning authority decides each application on its own merits — this is the zoning context, not a compliance assessment.

Read the zoning objectives in the development plan

Built & sold

What happened next

Beyond the decision: whether this development was built, and what property here has sold for.

Recent sales nearby

within 500 m
Residential Property Price Register sales within 500 metres of this site
AddressDatePriceDistance
Apartment 1, 17 Fade Street, Dublin 2Feb 2026€1,275,000115 m
Apartment 5, 50-52 Dame Street, Dublin 2Nov 2025€395,000164 m
Apt 39 Wicklow Court, 38 40 South Great Georges St, Dublin 2Mar 2025€295,000166 m
3 Fownes St, Temple Bar, Dublin 2May 2026€1,600,000186 m
Apt 24 Sprangers Yard, Crowe St, DublinSept 2025€340,000205 m
Top Floor Apt., 5a Fownes Street Upper, Temple BarOct 2025€250,000211 m
Apartment 4, 5-6 Temple Lane South, Temple BarNov 2025€355,000219 m
Apartment 5, 5-6 Temple Lane South, Temple BarNov 2025€355,000219 m

Nearby properties, not this site — a guide to local values.

Sources: Building Control Management System (commencement notices) and the Residential Property Price Register, licensed under CC BY 4.0. Records are matched to this application by location and may not be exhaustive; always confirm against the official source before relying on them.

Key dates

Timeline

  1. Application received22 February 2023
  2. Decision due18 April 2023
  3. Decision issued18 April 2023
  4. Permission expiry13 July 2028

In the area

Applications near this site

Other planning applications within about 500 m — what else is being proposed or built nearby.

Related developments

Similar applications

Ranked by what these developments actually propose, not by matching words — so you can see how comparable applications were decided.

Community

Discussion

What local people think about this application.

Nobody watching yet

Community sentiment

No votes yet

Nobody has voted on this application yet.

Community sentiment — a straw poll of people who visited this page, not a statutory submission. To make a valid observation you must submit it to the planning authority.

Sign in to have your say on this application.

No comments yet. Be the first to say what you think about this application.

Sign in to join the discussion on this application.

Comments are moderated and are the opinions of the people who wrote them. They form no part of the statutory planning process — to make a valid observation you must submit it to the planning authority.