Amendments to a permitted hotel scheme, including demolition and reconstruction of the front facade.

3303/22 · Dublin City Council · Lodged 17 February 2022

Reference
3303/22
Authority
Dublin City Council
Register status
Decided
Type
Permission
Received
17 February 2022

Summary

AI-generated

This application seeks permission to amend a previously permitted hotel development. The works include the demolition of the front facade on Pembroke Street Lower and the construction of a new front facade featuring juliet balconies.

Commercialhotelamendmentfacade

Generated from the description above by an AI model and may contain mistakes. The council’s description is the authoritative record.

Official record

Development description

  • Permission for development to amend a previously permitted hotel scheme (dublin city council reg. Ref. 2245/16 & an bord pleanala ref. Pl29s. 246463; as extended by dublin city council reg. Ref. 2245/16/x1; and as amended by dublin city council reg. Ref. 4264/18 & an bord pleanala ref. Abp-303942-19) at a 0.138 ha site at nos. 16-18 pembroke street lower and windsor place, dublin 2, d02 ec63. The site is principally bounded to the: northwest by buildings on windsor place; northeast by no. 15 pembroke street lower and buildings on mackies place, and windsor place; southeast by pembroke street lower; and southwest by nos. 51-52 fitzwilliam square west, dublin
  • The proposed development, which provides for alterations to the permitted hotel development with related hotel facilities including restaurant, public bar, reception and seating areas, storage, administration and staff facilities, other hotel-related back -of-house areas, plant (including substation with associated switch room), waste storage area and cycle parking, will consist of: demolition of the front (southeast) facade and the construction of a new front (southeast) facade to include juliet balconies and revised pedestrian entrances; demolition of the remaining existing floor plates from basement level to fourth floor (1,305 sq m) previously to be retained and the construction of replacement floor area (1,305 sq m) from basement level to fourth floor with revised finished floor levels; further revisions to floor plates includiing the: extension (15 sq m) to the southeast and the provision of a new lightwell (29 sq m reduction in floor area) at basement level, provision of a lightwell and courtyard (44 sq m reduction in area) at lower ground floor level, alterations to entrance (resulting in a 7 sq m reduction in area) at ground floor level, extension to provide a full floor (189sq m) and further recess at the southeast facade of the rear block (reduction of 2 sq m) at mezzanine level, further recess at the southeast facade of the rear block (reduction of 2 sq m) at both first and second floor levels, the floor area of the permitted third and fourth floor levels to remain unaltered; alterations to internal layouts at basement level to replace meeting rooms and a hotel gym with additional hotel bedrooms and at lower ground floor levels to replace part of the dining room/bar, circulation and back of house areas with additional hotel bedrooms; and internal alterations to the layout of the ground floor level reception, lobby and cafe/bar. The proposed development will result in the net increase in floor area of 118 sq m and 23 no. Additional hotel bedrooms, resulting in a 6 storey (including a roof level store room) over basement and lower ground floor level hotel building with 125 no. Bedrooms and a total gross floor area of 5, 638 sq m. The proposed development also consists of associated hard and soft landscaping; and all other associated site excavation, infrastructural and site development works above and below ground including changes in level, boundary treatments and associated site servicing (foul and surface water drainage and water supply)

Land-use zoning

What this land is zoned for

Z1: Sustainable Residential NeighbourhoodsRS
To protect, provide and improve residential amenities.

National zoning type: Existing residential

Objective set by the Development Plan 2022-2028 (2022–2028). The planning authority decides each application on its own merits — this is the zoning context, not a compliance assessment.

Read the zoning objectives in the development plan

Built & sold

What happened next

Beyond the decision: whether this development was built, and what property here has sold for.

Recent sales nearby

within 500 m
Residential Property Price Register sales within 500 metres of this site
AddressDatePriceDistance
Apt 2 Windsor Court, Windsor Place, Pembroke St Dublin 2Oct 2025€315,000101 m
3 Upper Ely Place, Dublin 2, DublinMar 2025€500,000102 m
Apt No 1, 4 Upper Ely Place, Dublin 2Jan 2025€525,000103 m
19 Pembroke Lane, Pembroke St Lower, Dublin 2Jan 2025€602,000160 m
Apartment 9, Saint Stephens, Leeson LaneJan 2026€585,000165 m
Apt 10, St Stephens, Leeson LaneAug 2025€550,000165 m
16 Hume Street, Dublin 2Jul 2025€400,000205 m
Apt 3, 12b Merrion Court, Merrion RowDec 2025€1,700,000209 m

Nearby properties, not this site — a guide to local values.

Sources: Building Control Management System (commencement notices) and the Residential Property Price Register, licensed under CC BY 4.0. Records are matched to this application by location and may not be exhaustive; always confirm against the official source before relying on them.

Key dates

Timeline

  1. Application received17 February 2022
  2. Decision due13 April 2022
  3. Decision issued13 April 2022
  4. Grant issued26 May 2022

In the area

Applications near this site

Other planning applications within about 500 m — what else is being proposed or built nearby.

Related developments

Similar applications

Ranked by what these developments actually propose, not by matching words — so you can see how comparable applications were decided.

Community

Discussion

What local people think about this application.

Nobody watching yet

Community sentiment

No votes yet

Nobody has voted on this application yet.

Community sentiment — a straw poll of people who visited this page, not a statutory submission. To make a valid observation you must submit it to the planning authority.

Sign in to have your say on this application.

No comments yet. Be the first to say what you think about this application.

Sign in to join the discussion on this application.

Comments are moderated and are the opinions of the people who wrote them. They form no part of the statutory planning process — to make a valid observation you must submit it to the planning authority.